You are on page 1of 2

CONTRACT NO.

LTC/C/VEN/1553/B-14
EPIC FOR TEMPORARY ELECTRICAL POWER BRIDGING
IN QG1

Visual Inspection Report- Hot Tap


TIE-IN No: T-730-099101 DATE: 12-Nov-2015
REPORT NO.:
TYPE WELDERS
Sr. SPOOL JOINT SCH / WELD IDENTIFICATION HEAT VISUAL
LINE NO / DRAWING NO OF SIZE FIT UP WPS MATERIAL DESCRIPTION REMARKS
No. NO. NO. THK DATE NO. RESULT
JOINT R/H F/C
A671-CC60 34'' Existing pipe
12-Nov- 12-Nov- 597-
1 RV9103-6''(1R1B)-N-0MM SHT-1/2 A 1 BRW 6'' 7.11 mm 1102 1102 ACC
2015 2015 03-02 A350-LF2 Weldolet 08/391876

NON DESTRUCTIVE EXAMINATION


NDE Method Date Report # Date Report # NDE Remarks

Ultrasonic Testing

Magnetic Particle Examination

Dye Penetrant Examination

Hardness Testing

Notes:

MEDGULF QATARGAS
Name

Signature