You are on page 1of 2

PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 2" T3-17-1765 TH EQUAIZING LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 2 OF 2
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class LOT No. Brand Report No.
No. Process (mm) Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 2" T3-17-1765 TH EQUAIZING LINE (Drawing No: W1902-17-ME-DRG-1014 )

PIPE API 5L Gr.B 2" Sch 160 124062 TUBOS AWS 2.4 21010 BOHLER
WPS/ REUNIDOS A5.18 04/FVWIR- 71/RT/
Butt BIT-
1 170 FIELD ASME/ GTAW 17-Jul ACC 21-Jul R/F/C CBN-06 ACC MBE-7/ N/R N/R 22/07/21 ACC N/R N/R
Weld SEGWW
WP005 AWS CBN/2021
ELBOW 90 ASTM A234 Gr.WPB 2" Sch 160 051M18 AWAJI 3.2 21600 BOHLER /VII/21
A5.1

TUBOS AWS
GTAW PIPE API 5L Gr.B 2" Sch 160 124062 2.4 19131 BOHLER 58/RT/
WPS/ REUNIDOS A5.18 04/FVWIR-
2 171 Butt FIELD 13-Jul ACC 15-Jul R/F/C CBN-015 ACC N/R N/R 18/07/21 BIT- ACC N/R N/R
ASME/ MBE-7/
Weld WP002 CBN/2021 SEGWW
ASTM A234 Gr.WPB AWS /VII/21
SMAW ELBOW 90 2" Sch 160 051M18 AWAJI 3.2 21312 BOHLER
Gr.WPB A5.1

TUBOS AWS
GTAW PIPE API 5L Gr.B 2" Sch 160 124062 2.4 19131 BOHLER 34/RT/
WPS/ REUNIDOS A5.18 04/FVWIR-
Butt R/H/ BIT-
3 172 SHOP ASME/ 20-Jun ACC 21-Jun CBN-020 ACC MBE-7/ N/R N/R 05/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW ELBOW 90 ASTM A234 Gr.WPB 2" Sch 160 051M18 AWAJI 3.2 21312 BOHLER /VII/21
A5.1

GTAW ELBOW 90 ASTM A234 Gr.WPB 2" Sch 160 051M18 AWAJI AWS 2.4 19131 BOHLER
A5.18 34/RT/
WPS/ 04/FVWIR-
Butt R/H/ BIT-
4 173 SHOP ASME/ 20-Jun ACC 21-Jun CBN-020 ACC MBE-7/ N/R N/R 05/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 TUBOS AWS CBN/2021 /VII/21
SMAW PIPE API 5L Gr.B 2" Sch 160 124062 3.2 21312 BOHLER
REUNIDOS A5.1

TUBOS AWS
GTAW PIPE API 5L Gr.B 2" Sch 160 124062 2.4 19131 BOHLER 34/RT/
WPS/ REUNIDOS A5.18 04/FVWIR-
5 174 Butt SHOP ASME/ 20-Jun ACC 21-Jun R/H/ CBN-020 ACC MBE-7/ N/R N/R 05/07/21 BIT- ACC N/R N/R
Weld F/C SEGWW
WP002 AWS CBN/2021
SMAW FLANGE ASME A105 RTJ 2" Sch 160 GALPERTI 3.2 21312 BOHLER /VII/21
1762 A5.1

GTAW FLANGE ASME A105 RTJ 2" Sch 160 GALPERTI AWS 2.4 19131 BOHLER
1762 A5.18 39/RT/
WPS/ 04/FVWIR-
Butt R/H/ BIT-
6 175 SHOP ASME/ 21-Jun ACC 22-Jun CBN-06 ACC MBE-7/ N/R N/R 06/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 TUBOS AWS CBN/2021
SMAW PIPE API 5L Gr.B 2" Sch 160 124062 3.2 21312 BOHLER /VII/21
REUNIDOS A5.1

AWS
GTAW TEE ASTM A234 Gr.WPB 2" Sch 160 935M34X AWAJI 2.4 19131 BOHLER 59/RT/
WPS/ A5.18 04/FVWIR-
7 176 Butt FIELD 13-Jul ACC 15-Jul R/F/C CBN-015 ACC N/R N/R 18/07/21 BIT- ACC N/R N/R
ASME/ MBE-7/
Weld WP002 CBN/2021 SEGWW
TUBOS AWS /VII/21
SMAW PIPE API 5L Gr.B 2" Sch 160 124062 3.2 21312 BOHLER
REUNIDOS A5.1

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )


PT. CIPTA BANGUN NUSANTARA WELDING TRACEBILITY REPORT STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD.

Project : MBE-6 PRODUCTION PIPING HOOK UP


Line Inspected : 2" T3-17-1765 TH EQUAIZING LINE Report no. : 01/FVWIR-MBE-6/CBN/2021
Contractor : PT. CIPTA BANGUN NUSANTARA Sheet no. : 1 OF 2
Client : STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD. Date :
Acceptance Criteria : ASME B31.1-2020 Area : MBE-6

JOINT BASE METAL MATERIAL WELDING CONSUMABLE MATERIAL VISUAL INSPECTION NON DESTRUCTIVE TEST (NDT)
WPS
SHOP/
NO FIELD Fit-Up Welding PT UT RT (INITIAL) RT (Rep 1) RT (Rep 2) REMARK
Dia.
No Type Description Specification Size / Thk Heat No. Brand AWS Class (mm) LOT No. Brand Report No.
No. Process Date Result Date Seq Welder ID Result DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT DATE REPORT RESULT

MBE-6 2" T3-17-1765 TH EQUAIZING LINE (Drawing No: W1902-17-ME-DRG-1014 )

AWS
GTAW PIPE API 5L Gr. B 18" Sch 40 (14,27) 315783 TPCO 2.4 21010 BOHLER 002/
WPS/ A5.18 04/FVWIR- PT/
Butt
1 162 FIELD ASME/ 17-Jul ACC 24-Jul R/F/C CBN-015 ACC MBE-7/ 24/07/21 SEGWW ACC N/R N/R N/R N/R
Weld
WP002 CBN/2021 /BIT/
SMAW WELDOLET ASTM A105 2x6" Sch 160 250334 MEGA AWS A5.1 3.2 21600 BOHLER VII/21

GTAW WELDOLET ASTM A105 2x6" Sch 160 250334 MEGA AWS 2.4 21010 BOHLER
A5.18
Fillet WPS/ 04/FVWIR-
2 163 FIELD ASME/ 17-Jul ACC 24-Jul R/F/C CBN-015 ACC MBE-7/ N/R N/R N/R N/R
Weld
WP002 TUBOS CBN/2021
SMAW PIPE API 5L Gr.B 2" Sch 160 124062 AWS A5.1 3.2 21600 BOHLER
REUNIDOS

GTAW FLANGE ASME A105 RTJ 2" Sch 160 GALPERTI AWS 2.4 19131 BOHLER
1762 A5.18 38/RT/
WPS/ 04/FVWIR-
3 164 Butt SHOP ASME/ 20-Jun ACC 20-Jun R/H/ CBN-02 ACC MBE-7/ N/R N/R 06/07/21 BIT- ACC N/R N/R
Weld F/C SEGWW
WP002 TUBOS CBN/2021
SMAW PIPE API 5L Gr.B 2" Sch 160 124062 AWS A5.1 3.2 21312 BOHLER /VII/21
REUNIDOS

AWS
GTAW FLANGE ASME A105 RTJ 2" Sch 160 1762 GALPERTI A5.18 2.4 19131 BOHLER 45/RT/
WPS/ 04/FVWIR-
4 165 Butt SHOP ASME/ 20-Jun ACC 22-Jun R/H/ CBN-06 ACC MBE-7/ N/R N/R 07/07/21 BIT- ACC N/R N/R
Weld F/C SEGWW
WP002 CBN/2021
SMAW TEE ASTM A234 Gr.WPB 2" Sch 160 935M34X AWAJI AWS A5.1 3.2 21312 BOHLER /VII/21

AWS
GTAW TEE ASTM A234 Gr.WPB 2" Sch 160 935M34X AWAJI 2.4 19131 BOHLER 45/RT/
WPS/ A5.18 04/FVWIR-
Butt R/H/ BIT-
5 166 Weld SHOP ASME/ 20-Jun ACC 22-Jun F/C CBN-06 ACC MBE-7/ N/R N/R 07/07/21 SEGWW ACC N/R N/R
WP002 CBN/2021 /VII/21
SMAW FLANGE ASME A105 RTJ 2" Sch 160 1762 GALPERTI AWS A5.1 3.2 21312 BOHLER

AWS
GTAW TEE ASTM A234 Gr.WPB 2" Sch 160 935M34X AWAJI 2.4 19131 BOHLER 38/RT/
WPS/ A5.18 04/FVWIR-
Butt R/H/ BIT-
6 167 SHOP ASME/ 20-Jun ACC 22-Jun CBN-06 ACC MBE-7/ N/R N/R 06/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 TUBOS CBN/2021 /VII/21
SMAW PIPE API 5L Gr.B 2" Sch 160 124062 REUNIDOS AWS A5.1 3.2 21312 BOHLER

GTAW PIPE API 5L Gr.B 2" Sch 160 124062 TUBOS AWS 2.4 19131 BOHLER
REUNIDOS A5.18 38/RT/
Butt WPS/ R/H/ 04/FVWIR- BIT-
7 168 SHOP ASME/ 21-Jun ACC 22-Jun CBN-06 ACC MBE-7/ N/R N/R 06/07/21 ACC N/R N/R
Weld F/C SEGWW
WP002 CBN/2021
SMAW ELBOW 90 ASTM A234 Gr.WPB 2" Sch 160 051M18 AWAJI AWS A5.1 3.2 21312 BOHLER /VII/21

GTAW PIPE API 5L Gr.B 2" Sch 160 124062 TUBOS AWS 2.4 19131 BOHLER
REUNIDOS A5.18 38/RT/
WPS/ 04/FVWIR-
8 169 Butt SHOP ASME/ 21-Jun ACC 22-Jun R/H/ CBN-06 ACC MBE-7/ N/R N/R 06/07/21 BIT- ACC N/R N/R
Weld F/C SEGWW
WP002 CBN/2021
SMAW ELBOW 90 ASTM A234 Gr.WPB 2" Sch 160 051M18 AWAJI AWS A5.1 3.2 21312 BOHLER /VII/21

Prepared by Reviewed by
Reviewed by Approved by

PT. CIPTA BANGUN NUSANTARA PT. CIPTA BANGUN NUSANTARA


STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd. STAR ENERGY GEOTHERMAL (WAYANG WINDU) Ltd.

( M HIFNI SYAHBANA ) ( RICKY FIRMANSYAH ) ( ) ( )