You are on page 1of 1

EPC FOR RUMAITHA THAMAMA ZONE B PHASE III EXPANSION

DEVELOPMENT & CONVERSION OF RA PHASE I/II CO2 AFFECTED WELLS

DAILY NDE REQUEST


Location : Report No: 44027- PIP - S - 0001 Date : 17/05/2020 RFI No : P4427-RFI-PIP-019 Sht. No. :

Material
Heat No Fit up Welder No. NDE Required Test
Sl. Weld Sch./ WELDING Welding
No.
WELDER NAME Spl No Joint No.
Type
Dia.
Thk. in mm Insp WPS No.
DATE Process
Remarks
Part 1 Part 2 Date Root/Hotpass Fill/Cap RT UT MT PT PMI FT
Magnetic
Check

WPS/PIP/RUM-001
1 MOHAMMAD KHURSHID ALAM N/A WQT-01 GROOVE 2" SCH.80 ASTM A333-6 184526 ASTM A333-6 184526 14/5/2020 14/5/20 GTAW RUM-001 RUM-001
Rev.B

WPS/PIP/RUM-001
2 NITESH KUMAR N/A WQT-02 GROOVE 2" SCH.80 ASTM A333-6 184526 ASTM A333-6 184526 14/5/2020 14/5/20 GTAW RUM-002 RUM-002
Rev.B

Electrode / Filler Metal Remarks (if any) :

AWS Class Size(mm) Batch No

ER70S-6 2.4mm 19147


SUB CONTRACTOR CONTRACTOR

Name

Sign.

Date
P44027-IR-PIP-F-05

You might also like