RISK ASSESSMENT

Work Details

ARJAN
PROJECT NO. 165 Project Name
PLOT NO - 6731311

Company/Office ABNA AL AMIR Contracting LLC Date 10TH MAY 2018


Work Description Concrete Works

Risk Matrix
Consequences
Likelihood Rarely Unlikely Possible Likely Highly Likely
Severity People Assets
(1) (2) (3) (4) (5)
Very High (5) 5 10 15 20 25 Death Severe Damage
High (4) 4 8 12 16 20 Major Injury Major Damage
Medium (3) 3 6 9 12 15 Over 3 Day Injury Moderate Damage
Low (2) 2 4 6 8 10 Under 3 Day Injury Slight Damage
Very Low (1) 1 2 3 4 5 Minor Injury (no lost time) No Damage

Score Priority Action


1 to 4 Low Low risk identified – Control measures to be adopted and monitored
5 to 10 Medium Medium risk identified – Further controls may be required
11 to 25 High High risk identified – develop / determine further controls

1
RISK ASSESSMENT

# Hazard Identified Risk Description Initial Initial Mitigations Final Final By


L S Score L S Score Whom
1. Ensure that all walkway and road
are free from obstruction
2. Take caution not to damage
client’s materials
3. Manual transport of long items /
Construction
Personal injury materials should be done by two
materials
Damage to existing or more workers Project Engineer
1 transportation, 3 3 9 2 2 4
facilities 4. Conduct tool box meeting Supervisor
mobilization and
Property damage 5. Supervision during loading and
preparation
unloading of materials and
equipment
6. Speed limit to be adhered for
vehicles
7. Planning of traffic
1. The wheel of the wood saw
cutting machine should be
properly guarded to avoid
spreading of dust and injuries
2. The wood saw cutting machine
should be checked thoroughly
before using it
Compacting, Project Engineer
3. Ensure all employees should
shuttering/ De Personal injury Supervisor
2 3 2 6 wear proper PPE like gum boots, 2 2 4
shuttering and steel Property damage HSE Officer
hand gloves , safety goggles,
bar fixing
dust mask and hard hat
4. Close supervision is required
5. Formed work materials must be
of sufficient thickness
6. Unwanted persons must be away
while bar fixing
7. Provide safety cap for rebar.
2
RISK ASSESSMENT
# Hazard Identified Risk Description Initial Initial Mitigations Final Final By
L S Score L S Score Whom
1. All necessary PPEs such as gum
boots, safety goggles, coverall,
mask and hard hat should be
worn during the execution of the
work
2. Proper instruction, information
and training to all workers
3. Monitor concrete pouring and
Injury protect existing utilities
Property damage 4. Perform good housekeeping
Project Engineer
3 Concrete pouring Environmental 3 4 12 5. Ensure concrete truck engine is 1 3 3
Supervisor
pollution free from oil leakage
6. Proper access should be
provided for the workers while
concreting
7. While pouring concrete , concrete
should not be dumped in one
location to avoid overloading
8. Proper co-ordination between the
concrete pump operator and the
concreting team

Prepared by Contractor : Approved by:

Project Manager Consultant