S - Material damage, major Erection scheme should be followed for safe lifting.
Site Engineer /
S - Failure of Equipement injuries, fatality and 4 4 16 Yes 3 3 9
EHS
property damage Only experienced person should operate the vehicle.
Periodic
Conditionmaintenance should
of all lifting tool be done
& tackles forbe
must all checked
lifting equipment
before
4 use.
All lifting tools and tackles should possess a valid third party
certificate
S - Material damage, major
S - Failure of lifting tool & Use appropriate lifting tool &tackles (match the capacity Site Engineer /
injuries, fatality and 4 4 16 Yes 3 3 9
tackles. according to material weight). EHS
property damage
Packing must be provided in between sling & Material.
Only one trained signal man should give signal to the
operator.
Two guide ropes of minimum three meter length must be use
to guide the material during shifting.
Material Shifting by using crane operator should have the valid DL and competency
6
Mobile Crane (F15 / Hydra) letter and should be medically fit.
Stay away from suspended load
Provide tag line (min- 3m) while material shifting
Barricade the working area to prevent unauthorised entry
Site Engineer /
S - Pinch points S- Finger injury / Crush 3 4 12 Yes 2 3 6
While material positioning do not put hand in-between gap of EHS
member
Ensure proper wooden packing/ supports given to material
while positioning
S - Fall of person from S - Fractures, major Ensure workers are physically/medically fit for height work Site Engineer /
10 De-slinging the Materials 4 4 16 Yes 2 3 6
height injuries and fatal EHS
LOTO procedure to be followed for all vehicles/equipments
for avoided the unauthorised operation
Ladder should be inspected before use and Ensure to have
caging
Ensure to provide resting platform
11 On-Site Emergency S- Accidents/Incidents/ S-Minor/ Major Injuries 4 4 16(H) 1. Emergency Response Plan Yes 3 2 6(L) Project Manager
H- Health Issues H-Minor/ Major Sickness 2. On-Site First-Aid facility. Safety Officer
H- Snake bites. S/H-Fatality 3. Emergency vehicle/Ambulance at site.
4. Sudden access to near - by hospital with emergency
treatment and anti-venom treatment facility
2 <Remote> - Unlikely to occur 2 <Appreciable> - minor injury; 1-7 Low No Action Required
3 <Occasional> - Could possibly or known to occur 3 <Serious> - serious injury; 8 - 14 Medium Action Required
4 <Probable> - Likely to occur more than once 4 <Major> - 1 fatality; Resource depletion, Resource Waste 15 - 19 High Find Alternative
Method
5 <Frequent> - Common or repeating occurrences 5 <Catastrophic> - Multiple fatality; 20 - 25 Very High NOT Acceptable / Stop
Work
Following situation are consider while during the Aspect / Impact& HIRA for each activity and potential emergency situation.
Environment: Normal, Abnormal (including start up & shutdown as applicable.
OHS: Routine, Nonroutine & Potential emergency situation.