You are on page 1of 6

DUBAI ELECTRICITY & WATER AUTHORITY

Health and safety Risk assessment Form

Project Name & cont. No : Construction of G+1 OFFICE BUILDING AT AL BARSHA

Activity/Area/Equipment : CONCRETE POURING Works

Assessor(s) : Robin Gibu

Reviewed By :

Personnel Residue Risk


Item Cause / Hazard / Existing Mitigating Risk Ranking Additional Mitigating Responsible
Exposed to Ranking
No. Initiating Event Consequence Controls Controls Person
Risk P S R/R P S R/R
1 Permit to Work  Uncontrolled  All site  Prior to starting the daily 4 3 M  All must attend 2 1 L ●Foreman
and unplanned workers activities, a work permit associated training
activities. must be obtained from course. ●Supervisor
 All Visitors
HSE department.
 Lack of  Permission must cover all
knowledge  MS, Drawing TRA must aspects of activities and ●Project
about work be attached the permit. avoid different nature of Engineer
activity. work at same time at a
same location. ●Safety Officer
 PTW control to be
implemented.
 TBT to be conducted all
the hazards associated are
discussed.
 Authorized persons can
take and issue the PTW.
 Work is carrying as per
the MS.
2 Surface  Dust  All
Site  Use appropriate PPE 3 4 M  Conduct Tool Box Talks. 1 1 L  Site engineer
preparation. inhalation workers. (dust mask and ear plug,  Safety Officer
 All people use the proper
safety googles)
 Noise. PPE’s while working  Site

1|Page
DUBAI ELECTRICITY & WATER AUTHORITY
Health and safety Risk assessment Form
Personnel Residue Risk
Item Cause / Hazard / Existing Mitigating Risk Ranking Additional Mitigating Responsible
Exposed to Ranking
No. Initiating Event Consequence Controls Controls Person
Risk P S R/R P S R/R
 All Visitors.  Implement water with blocks. Supervisor
spraying method (if  Proper supervision need.
need).

3 Work with Hand  Hit


/ struck by  Involved  Select suitable hand tool for  All
workers must attend  Safety Officer
tools&Electrical hand tool Workers. the particular job TBT meeting.
tools. 3 3 M 2 2 L
 Dust inhalation  Check the electrical power  Daily inspection should be
 Supervisor
tools are in good condition. performed by assigned
 Electrocution
person in order that hand
 Trained workers should be
 Hand injury tools should be in good
work with respective hand condition and should be
tools recorded and records should  Foreman
 Provision of suitable PPE’s. be maintained
 Postappropriate warning
sign / notices in vicinity  First Aider
location.
 Provide Eye wash facility.
 Providecompetent
Supervisor.

4 Work with Air  Flying Particle  Involving  Ensure Proper PPE is  Site
personnel involved  Safety Officer
Compressor crew, nearby supplied. must attend TBT meeting.
 Dust Inhalation 3 3 M 1 1 L
machine. persons.
 Thorough inspection of the A third party inspection
 Explosion
 Operators air compressor machine certificate must be
 Hit by body prior to the use by a maintained for the safety of  Engineer
competent examiner. the air compressor machine.
 Cordon the area of  Provision
of sufficient
warning notices for the
2|Page
DUBAI ELECTRICITY & WATER AUTHORITY
Health and safety Risk assessment Form
Personnel Residue Risk
Item Cause / Hazard / Existing Mitigating Risk Ranking Additional Mitigating Responsible
Exposed to Ranking
No. Initiating Event Consequence Controls Controls Person
Risk P S R/R P S R/R
operation of air compressor. work.  Foreman

 Check the hose line.  Eyewash facility must be


provided
 Whileoperating don’t open
the door.  Provide a whip blast
 Supervisor
arrester.
 Ensurethe trained person
only performing.
 Checkair pressure gauge in
good condition.

5 Hot work  Burn  Involving  Proper PPE for the  Provision of job specific 2 3 L  Safety Officer
crew. workers are provided 4 5 H safety training for the
 Electrocution
workers
 Nearby  Flammable materials are
 Fire Hazard  Engineer
persons. removed. A competent electrician to
 Material/ conduct inspection of
 Ensuring the workers are electric supply and
property familiar with the proper  General
damage protections prior to the
work procedure. operation. Foreman
 Personnel
 Proper electric cabling  Proper
housekeeping should
injury and earthing are be maintained.  Supervisor
 Suffocation provided.
 Hotwork permit must be
 ELCB’s are connected obtained prior to any hot
for electric safety. work.
 Cylinder
Falling  Flammable materials  Firefighting
equipment’s
should be kept away must be kept in vicinity.
from the work place. (DCP or CO2 Fire
 Gas Cylinder should be Extinguisher)
3|Page
DUBAI ELECTRICITY & WATER AUTHORITY
Health and safety Risk assessment Form
Personnel Residue Risk
Item Cause / Hazard / Existing Mitigating Risk Ranking Additional Mitigating Responsible
Exposed to Ranking
No. Initiating Event Consequence Controls Controls Person
Risk P S R/R P S R/R
upright position.

6 Chemical  Inhalation  Involving  Ensuring workers are  Provision of job specific  Safety Officer
Handling Crew familiar with the proper 4 4 H safety training for the
 Ingestion 2 3 L
work process and workers
 Nearby
 Contact procedures  Engineer
persons.  MSDS must be
 Fire  Provision of suitable discussed with the site
personal protective engineer and site
 Skin Disease  General
equipmentie,safety goggles, supervisor. MSDS
face mask or respirator, should be made available Foreman
 Cancer
Rubber gloves. at place of storage and
place of work.
 Chemicals are properly  Supervisor
stored.  Storage area of
chemicals must be
 Control of flames or fire segregated and isolated.
nearby.
 No smoking signage
 Eye wash facilities must be should be provided.
provided
 Provide Fire Extinguisher
7 Steel rebar  Slip, trip and  Involved  Required adequate planning  Tool box talks required.  Site supervisor
Erection fall workers and co-ordination
 Proper supervision need.  Site Engineer
 Injury to body  Use proper PPE.
parts.  Required competency  Foreman
 Competent person must do training.
 Safety officer.
 Back Injury. this activity.

8 Concrete pouring  Concrete line  InvolvedW  Inspection of the concrete 4 3 M  Maintaining correct 2 2 L  Safety Officer
bursting orkers line pumping pressure
 Supplier
 Damage of  Ensuring workers are  Site personnel involved representative
4|Page
DUBAI ELECTRICITY & WATER AUTHORITY
Health and safety Risk assessment Form
Personnel Residue Risk
Item Cause / Hazard / Existing Mitigating Risk Ranking Additional Mitigating Responsible
Exposed to Ranking
No. Initiating Event Consequence Controls Controls Person
Risk P S R/R P S R/R
delivery hose familiar with the proper must attend associated  Site Engineer
causing work process and training course
 Supervisor
discharge of procedures
 Suitable PPE should be
concrete with General foreman
 Provisionof suitable enforced to be worn by
pressure
personal protective workers, Safety harness and
 Personhit by equipment. life-line, safety boots
vibrator
 Provisionof trained  Provision of safe access and
 Trip and slip banksman and supervisor gangways
for the work process.
 Hearing  Adverse weather procedures
damage  Physical protection for
 Emergency procedure and
electrical cable for power
 Eye injury contact list
tools

9 Housekeeping  Slip, trip and  All Site  Before starting the work 3 3 M  Segregate all sharp waste 3 2 L  Site engineer
fall workers. and after completion of material and dispose it  Safety Officer
work proper separately and provide
 Injury to body  All Visitors.  Site
housekeeping to be done. the barricade and sign
parts. board. Supervisor
 Water spraying must be
done for controlling the  Ensure the waste removal  Subcontractor
dust while brushing. from the site daily basis.  safety
personnel

10 Emergency  Fire  All Site  Keep the fire extinguisher 3 4 M  First aid kit and first aider 2 1 L  Site engineer
workers. nearby all equipment. shall be available at site.  Safety Officer
 Accident/
Procedure incident All  Report any incident,  Tool box talk regarding
  Site
Visitors. accident unsafe condition the emergency response, Supervisor
 Explosion.
to site HSEO / establish muster point
supervisor &display emergency  Subcontractor
number at muster point. safety
 Ensure the Evacuation
route & assembly point  Ensure Man Basket personnel
signage are provided. available all times.
5|Page
DUBAI ELECTRICITY & WATER AUTHORITY
Health and safety Risk assessment Form
Personnel Residue Risk
Item Cause / Hazard / Existing Mitigating Risk Ranking Additional Mitigating Responsible
Exposed to Ranking
No. Initiating Event Consequence Controls Controls Person
Risk P S R/R P S R/R

Prepared by Reviewed & approved by


ROBIN GIBU

6|Page