You are on page 1of 10

TUWAIQ CASTING & FORGING FACILTY PROJECT

TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

Contractor / Specific Date of Risk


Al Fanar
Subcontractor Location Assessment
Duration of
Work Discipline Civil No. of Works 15
Work
Activity Painting Works

Risk Assessment Risk level A Risk Level B Risk Level C Risk Level D Risk Level E
Standard 16 – 25 10- 15 5- 9 3-4 1-2
Likelihood x Severity Unacceptable Severe Risk Through review required Acceptable Level Acceptable Level

Review and Approval

Subcon Permit Signature Subcon Dept Signature Subcont Site Signature Subcon HSE Signature
Reciver Head manager Manager
Name Name Name Name

Doosan Permit Signature Doosan Dept Signature Doosan Gen. Signature Doosan Gen. HSE Signature
Issuer Manager Manager Manager
Changyeol Song
Name Name Name Name

No. Work Activity Hazard Factor & E Type of Damage & RISK Control Measure & Detailed RISK Correcti
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

GRADE

GRADE
H
information Environmental impact S Env. Impact L S T management Plan L S T In Charge on Date
S

All personnel have attended the project


Safety Orientation and relevant safety
awareness training prior to site
mobilization.

The field supervisor or foreman shall be a


certified permit receiver and to coordinate
for permit approval to Doosan const. &
safety team.

The field supervisor shall perform a daily


Non-compliance to project
tool box talk addressing the site hazard and
procedure & permit system
discussing risk control to all crew member
Unawareness of emergency
Everyone must know the emergency
procedures
assembly point and emergency contact
Area Assessment numbers to be posted at work area. Permit
1 & Preparation
Incompetent Personnel S Project Violation 2 2 4 D 2 1 2 E
Supervisor
Ensure that competency of all personnel is
Uninspected use of
verified prior perform the operation and
equipment and tools.
ensure that the operators are having the
valid third-party certification with them.

All equipment & tools shall be declared


upon entry of project gate and be
coordinated with Doosan Safety team for
inspection and approval

Heavy equipment shall have safety function


device, fire extinguisher and first aid kit in
place.

Homemade tools are not allowed to be use


in the project.
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

Use of leather or cut resistance hand


gloves to eliminated or prevent hand injury
for handling sharp objects.

Sharp edges Where an object requires two or more


employees to handle it, one employee
Carrying of heavy items should give the direction for lifting and
lowering the object in unison.
Work
2 Manual Handling Repetitive lifting S Personal Injury 2 3 6 C 2 2 4 D
Crew
Never attempt to lift beyond your capacity
Lifting and carrying on (20 Kg). If in doubt test the objects’ weight
uneven and / or slippery before handling it: if it appears too heavy or
ground conditions bulky, obtain a mechanical lifting aid.

The work area shall be in good condition


and free from slips. Ensure clear access is
available.
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

Personal including the painting work must


be worn proper PPE like chemical resistant
gloves, safety shoes, safety glass,
respiratory protection and disposable
coverall etc.

Employees handling the paint need to


undergone the chemical handling training

Eye wash must be in place

Concerned supervisors should ensure that,


Chemical contact the correct MSDS of the chemical is in
place and educate the crew members
Untrained worker about the hazards associated with the
chemical and the control measures
Fumes and vapours Ensure all are using the respirator in correct
manner.
Improper storage area
The personnel who are mixing the paint
Improper manual must be used in double eye protection
handling techniques (safety glass and face shield).

High Noise Paints should not be stored in direct Work


sunlight. Crew
3 Painting work S Project Violation 4 4 16 A 3 4 12 B
Skin allergy Paints shall be stored in accordance with Operator
the manufacture’s recommendations
Poor decision
Only required quantity of paints shall bring
Inhalation disorder to the site.

Environmental pollution Use secondary containment while mixing


the paint. Mixing of pain only in designated
area.
Back injury and other
sprains and strains Follow manual handling techniques and
maintain proper body posture while doing
Hearing impairment manual handling activity.

Check the MSDS and ensure all


requirements to be done before start the
job.

Empty container shall dispose accordingly.


Make sure adequate supervision available
throughout the activity.
The area shall be cordon off and post
relevant warning signages.

Ear protection must be provided (Ear


plug/Ear muff)
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

Ensure that the employees are wearing


appropriate PPE while handling sealant.

Involved workers shall attend chemical


handling training

Only trained and experienced workers


assign for the activity.
Chemical contact
PPE shall be used according to describe in
Untrained worker MSDS.

Obstructed access MSDS shall be provided at the work


Work
location and supervisor shall ensure that
Crew
Using of sealant Skin, Eye irritation the MSDS properly communicated to the
4 for gape filling
S Project Violation 4 4 16 A
workforce.
3 4 12 B
Operator
Poor decision
First aid measures as mentioned in the
Entrapment MSDS like eye wash, soap must be
provided.

Disposal of chemical as mentioned in


MSDS should be followed.

Only required quantity shall bring to the


site. Do not keep chemical under direct
sunlight.

Adequate access shall available at work


location
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

5 Painting work on Fall of men and materials S Project Violation 4 4 16 A Make sure the scaffold is inspected and 3 4 12 B Work
elevated platform having GREEN TAG prior commencing Crew
Untrained workers activity.
Operator
Defective ladder Application of full body harness with double
lanyard while working in an elevated area in
Inadequate supervision excess of 1.8 mtr and above. Ensure
proper anchor to safe anchorage point
Pinch point Ensure proper anchor to safe anchorage
point.
Tripping hazard
Follow 100% tie off policy.
Obstructed access
Leaning, twisting, stooping shall be avoided
Un secured tools while working on elevated area.

Defective tools and Do not throw any materials from height.


materials
Ensure all workers undergone Work at
Inadequate PPE Bodily height & hand tool training.
injury due to fall like,
fracture, head injury and Only inspected and color-coded ladder to
sprain be used for the activity

Poor decision, chances of Maintain three-point contact while


misusing tools and ascending and descending the ladder.
equipment’s
Ladder must be in good condition and
Back injury and other visually inspect prior to commence work
sprains and strains
A close supervision required by a
Fall injury competent supervisor

Failure of operation. Keep the body part away from the line of
fire
Cut and crush injury
Identify all possible pinch point hazard. Use
Fall injury adequate hand gloves to eliminate pinch
point hazard
Entrapment
Avoid keeping of excessive materials on
Falling of unsecured tools the platform for evade tripping hazard.
caused bodily
Injury Provide adequate access and make sure
the access is clear from any obstruction
Injury to self and others.
Personal injury Tool belt and lanyard shall be used and
ensure tools are properly secured to
prevent from fall.

Ensure all tools are in good condition,


inspected and color coded.
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

Visually inspect the tools prior using it. Do


not use damaged tools

Ensure all workers are wearing proper PPE


like hard hat with chin strap, goggles, hand
gloves, coverall and safety boot.

Barricade (Red& White) shall be provided


and post warning signs (CAUTION: WORK
AT HEIGHT ON GOING) to avoid
unauthorized entry.
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

6 Spray painting by Uninspected/ defective S Project Violation 4 4 16 A Air compressor shall be inspected and 3 4 12 B Work
using air equipment approved by DOOSAN prior mobilization at Crew
compressor site
Noise Operator
Air compressor shall process a valid 3rd
Electric hazard party certification.

Fire Machine properly grounded.

Compressor hose blasting Competent operator shall be assigned.

Contact with machine All cables are to be hung off the ground
rotating parts (2.10 meters) & kept dry.

Chemical contact All tools are to be inspected on a monthly


basis by a qualified electrician.
Fumes and vapours
Keep adequate amount of fire extinguisher
Spillage in place.

Burn, property damage Damaged cable or machine, immediately


removed and stored in designated storage
Hit to nearby workers area with do not use tag

Entanglement. Personal including the painting work must


be worn proper PPE like chemical resistant
Skin allergy gloves, safety shoes, safety glass,
respiratory protection and disposable
Inhalation disorder coverall etc.

Environmental pollution Employees who involving handling the paint


need to undergone the chemical handling
and usage training

Ventilation shall be provided to reduce the


accumulation of fumes and vapours inside
the painting area.

Eye wash must be in place

Concerned supervisors should ensure that,


the correct MSDS of the chemical is in
place and educate the crew members
about the hazards associated with the
chemical and the control measures

Ensure all are using the respirator in correct


manner.

The personnel who are mixing the paint


must be used in double eye protection
(safety glass and face shield).
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

The paint containers shall not be exposed


to direct sun light, or wind.

The paint tins shall be stored in a closed


container and ventilated.

Storage condition shall comply with paint


manufacturer requirements.

Paint shall never be stored near the


flammable objects.

The paint container shall never be allowed


to come in contact with electrical cables or
other energized parts.

Use secondary containment while mixing


the paint

Make a safety check of all equipment such


as staging tools, spray pots, hoses, fitting
hooks, etc.

Clean all working areas after each job


and/or shift.
Ensure spill kit must be in place.

Check the MSDS and ensure all


requirements to be done before start the
job.

MSDS shall be clearly discuss to the


workforce. All recommendation stated in
MSDS shall be followed

Keep adequate amount of fire extinguisher


in place while mixing paint.

Paints should not be stored in direct


sunlight.
Paints shall be stored in accordance with
the manufacture’s recommendations

Ensure personnel using the respirators.


Signboard should be provided.
Paint tin should be stored in shaded area.
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register

Use of appropriate PPE’s.

Material must be kept clear from access


(material storage area)
Poor housekeeping Work
Make sure proper housekeeping done after Crew
7 Housekeeping Obstructed access S Personnel Injury 3 1 3 D completion (housekeeping to be maintained 2 1 2 E
before work starts alternatively for during Field
Slips/trips/falls the work and after work) Supervisor
Supervisor and safety personnel must close
monitor the work crew.
After the work completion, clean the waste/
spill of concrete from the project area,