AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 036
Job Description: Working at Night and Extended shifts
Index:
Form 1 Task Analysis Initiation
Form 2 Risk Assessment Process As per Risk Assessment Procedure.
Form 3 Written Safe Work Procedure Result
AUTHORISATION
Prepared by: Approved by
Signature Date Signature Date
HSE Manager Project Manager
3. Use trained employees only Failure may result in injuries to persons and Enforce the use of competent persons only throughout the
H, S
property damage. project.
4. Competent supervisor should be appointed for every
activity to monitor the workers.
H, S Work task instruction should be provided for every
Competent supervision Failure will cause injuries to employees and or activity.
property damage
5. Illumination at the work place, walk ways Failure will cause tripping or falling. Physical H, S Ensure work place provided with adequate lighting as
. and stair case. injuries to employees and / or property per recommended standards.
damage Complete work area is covered not leaving any dark
spots.
Walkways and staircases will be installed with adequate
HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 3 of 11
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 036
Job Description: Working at Night and Extended shifts
lights.
6. Electrical cables. Potential falling tripping hazard. Physical Ensure all electrical cables suspended at height on a
injuries nonconductive supports.
H,S
7.
H, S
Ensure all employees to wear high visibility reflective
Failure will allow poor visibility causing injuries vest
High visibility reflective vest for labours. to persons
8. Working on elevated areas Persons falling from heights resulting injuries Provide safe working platform or safe standard
or death. scaffolding.
H,S Scaffold erected by competent scaffolding erectors.
Falling of materials / property damage. Use full body harness while working at heights.
Materials to be protected from falling.
9. Mobile plant and equipment operation. . All mobile plant equipment headlights must be switched
Failure of head lights, warning lights can on.
cause collisions/Poor visibility/ Result in All mobile plant equipment warning rotating lights must
property damages H,S be switched on.
Failure can cause unawareness of equipment Reverse sound alarm for mobile plant equipment must
moving backwards. Fatal injuries/ Property be in working order.
damages
10. Exceeding working hours. Failure to follow legal working hours will H, S Working hours should not exceed the legal working hours
results in legal complications. Exceeded working hours will increase the stress and
Hot weather conditions fatigue in workers.
Regular breaks will be provided by Supervisor
Can lead to dehydration / Severe trauma. Ensure cold drinking water provided at the work place.
5 Fatality 5 Severe > 1, 000, 000 AED, Weeks delay. 5 Daily occurrence
Ris k Rating
16
Result Classification:
7 Not having high visibility Poor visibility if not wearing jackets, and Site security/Safety will check Security/ Always
vests for workers physical injuries to employees. H,S,E 10 and make sure that all workers Safety/ 3
on site comply with safety rules. Supervisor
8 Working at height - Potential Death, Major/Minor Skeletal Provide safe working platform FM/ Always
Unsafe scaffolding or damage, cuts and bruises to all parts of Ensure that the scaffolding to be Supervisor
working platforms / the body use is comply with the standard Operative
Unsafe usage of step requirements guardrail and toe
ladder / Unguarded slab boards, safe access and egress
edge. Scaffolding must be erected by
Poor quality of work, delay of work, certified scaffolding erectors.
collapses the scaffolds/platforms and Scaffolding / working platform
chance for accident / incident or property must be inspected before use
damage. and ensure tagging system is in
H,S 10 place 4
Ensure that the platform is
protected from any falling object
Workers on top of the
scaffolding must wear full body
harness and anchored on the
rigid point
Never work on the top of the
scaffolding under the bad
weather condition.
* RR = Risk Rating
HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 9 of 11
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 036
Job Description: Working at Night and Extended shifts
2. PROCEDURE
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2. Safety boots.
3.3. Overalls.
3.4. Eye protection.
1. Must have PPE – safety footwear, gloves, hardhat, goggles, face musk, protective clothing etc.
2. Must have appropriate tools and equipment in good condition.
3. Must have weatherproof covers for materials and equipment, waste containers, warning tape.
4. Consider risks and hazards in work area. Refer any concerns to supervisor. Are relevant permits in place?
5. Check if it is necessary to secure area adjacent to work. Refer to supervisor if appropriate.
6. Arrange for transport of materials and equipment to site via supervisor.
7. Ensure materials and equipment are secure or removed when site unattended, eg overnight or during breaks.
Hazards
HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 10 of 11
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 036
Job Description: Working at Night and Extended shifts
Harm
Potential Death, Minor/major cuts and contusion, loss of limbs, fractures, damage to respiratory system, electric shock.
Persons in danger
1. Carpenters, Steel fixers, Masons, installers, technicians, Ordinary labours
2. .Supervisory staff and operators.
3. Other workers and public
Control measures
No lone working