Professional Documents
Culture Documents
PAGE No 1 of 20
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PRODEDURE
Project Name: Festival Living Stream-02 HSE-RA 008
Job Description: Scaffold Erection and Dismantling.
Index:
Form 1 Task Analysis Initiation
Form 2 Risk Assessment Process As per Risk Assessment Procedure.
Form 3 Written Safe Work Procedure Result
AUTHORISATION
Prepared by: Approved by
Signature Date Signature Date
HSE Manager Project Manager
activity.
5. Secure tools and equipments Falling objects causing injuries to persons Provide the tie ropes and anchor to a strong point
H, S
and / or property damage
respectively
Ledgers are spaced vertically no more than 2.1m apart
Non supporting transoms spaced 1.8m, 2m, 2.5m, and
3m apart
12. Construct scaffold platform: Enforce erection as per WSWP.
Every plank to be at least 274mm wide and 38mm thick
or steel planks. Ends of planks not to protrude less than
H, S 70mm or more than 200mm beyond the last props
All planks must be firmly secure to prevent
Tripping and falling of employees and / or displacement. Planks must cover the complete
falling material or equipment. platform. Planks rest on at least three supports
13. Guard rails and toe boards: Falling of material or equipment resulting in Enforce erection as per WSWP
potential death, major injuries to persons More than 2m above the ground guard rails to be
and / or property damage. installed on all sides except on closed working face
Substantial guard rails not less than 900mm and no
H, S
more than 1000mm apart
Toe boards at least 15cm in height
No open spaces between board and platform
Wooden toe boards at least 25mm thick
14 Inspection of scaffolding: Failure will allow the use of unsafe scaffolds Enforce inspections as per WSWP.
and leads to potential death, major injuries Task to be executed by designated competent person
to persons and / or property damage H, S All inspections to be entered in a scaffold register
Declare the scaffold safe or unsafe by affixing the
appropriate name plate
15 Statutory inspection: Failure will allow the use of unsafe scaffolds Enforce inspections as per WSWP
and leads to potential death, major injuries Daily before use.
to persons and / or property damage After erection, at least once per week
H, S Following inclement weather
When suspected scaffold had been damaged
When suspected scaffold has been tampered with or
altered.
A + B + C + D
Injury Severity Potential Damage / Loss Frequency or Likelihood Environmental Impact
0 No injury 0 No damage 0 Never happened before 0 No effect
1 Minor – (FAC) 1 Minor < 500 AED, No delay 1 Happened somewhere 1 Minor Effect - Short term < less 1 month
2 Major – (MTC) 2 Major > 500 AED, No delay 2 Happens occasionally 2 Major Effect - Long term > Greater 1 month
3 LTI 3 Major > 10 000 AED, one day delay 3 Happened before
4 Disabling Injuries 4 Serious > 100, 000 AED, >1 day delay 4 Happens regularly
Risk Rating Matrix
5 Fatality 5 Severe > 1, 000, 000 AED, Weeks delay. 5 Daily occurrence
Result Classification:
Critical = 17►15 High = 14►11 Medium = 10►7 Low = 6►0 Risk Rating
Immediate action. Action in 24 hours. Action in a week. ASAP. 16
14
12
Risk Reduction Hierarchy: 10
1. Engineering to reduce risk. 8
6
2. Replacement with lower risk. 4
4 Lack of supervision Poor quality of work, chance for Ensure the availability of full time PE/FM Before &
accident /incident or property H,S 10 competent supervision during 4
lost/damage work
5 Failure to secure tools and Falling materials Major/minor 10 Provide the tie ropes and anchor FM Before &
equipments injuries, potential death, property to a strong point /Supervisor during
H, S 4
damage. Underneath work area should be work
isolated.
6 Fail to barricade the work place Falling materials Major/minor 12 Ensure the work area has been FM Before &
injuries, potential death, property barricaded and warning sign /Supervisor during
damage. placed. work
H.S 4
Watchman should be posted in
necessary positions.
7 Not using Safety harnesses Falling of erectors from height. 12 Full body safety harness must be PE/FM Before &
Major Injuries worn where the working height Supervisor during
Potential death H, S exceeds 1.8 meters. work 3
9 Failure to install access ladders Slipping and falling of employees 10 Ensure installation of steps FM Always
Major Injuries H, S ladders to specifications Supervisor 3
Potential death
10 Failure to install x braces or props Collapsing of scaffolding 10 Ensure installation of x braces FM Always
Major Injuries and props Supervisor
Potential death All faces of the scaffold shall be
H, S 3
braced diagonally, both internally
and externally to adequately
support the scaffold
11 Failure to construct frame work as Collapsing of scaffolding 10 Enforce erecting as per WSWP PE/FM Always
per WSWP Major Injuries Supervisor
Potential death Sole and base plates stand on
level compacted ground
Spacing of ledgers:
No more than 1,8m, 2m.
2.5m and 3m apart
respectively
Ledgers are spaced
* RR = Risk Rating
2. PROCEDURE
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2. Safety boots.
3.3. Overalls.
3.4. Eye protection.
3.5. Hand gloves.
3.6. Full body safety harness
All scaffolding used on the site must comply with
Dubai Municipality Regulations.
Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control Regulation.
Jebel Ali Free Zone Authority Regulations.
Trakhees Environmental, Health and Safety Construction Safety Regulations.
All relevant Guidelines and Policy Circulars.
All scaffolding will be erected under the supervision of a competent and trained person.
1. Must have PPE – safety footwear, gloves, hardhat, goggles, face musk, protective clothing etc.
2. Must have appropriate tools and equipment in good condition.
3. Must have weatherproof covers for materials and equipment, waste containers, warning tape.
4. Consider risks and hazards in work area. Refer any concerns to supervisor. Are relevant permits in place?
5. Check if it is necessary to secure area adjacent to work. Refer to supervisor if appropriate.
6. Arrange for transport of materials and equipment to site via supervisor.
7. Ensure materials and equipment are secure or removed when site unattended, eg overnight or during breaks.
Hazards
1. Manual handling of materials (Lifting and shifting of materials) LITE to be considered at all times.
2. Fall from height, while on erection
3. Slips and trips and fall( eg: Un stacked materials, uneven scaffold planks etc)
4. Falling materials (eg: Scaffold components, tools and equipments etc)
5. Collapse of scaffold( eg: insecure ties and bracing , substandard materials etc)
6. Hazards associated with equipment used for lifting of materials, eg. Cranes, forklift, etc.
7. Contact with sharp edges of materials.
8. Working at heights.
9. Adverse weather conditions. If any doubts refer to the supervisor.
10. Unsafe stacking of materials.
Harm
Potential Death, Minor/major cuts and contusions, loss of limbs, fractures, concussion to fatality, property damage
Persons in danger
1. Scaffold erectors
2. Co-workers
3. Other workers/visitors in the vicinity
4. Public.
Control measures
A SCAFFOLD FRAMEWORK
1.1 Scaffold stands to be firmly supported and secured against displacement and to be kept vertical.
1.2 Stands to be spaced not more than 1.8 m, 2.4 m and 3 m apart in case of high and low mass loads, respectively, if
constructed from steel.
1.4 Transoms to be spaced not more than 1.5 m, 1.8 m and 2.4 m apart in the case of high, medium and low mass loads
respectively.
2. High, medium and low mass loads shall mean mass loads not more than 375, 250 and 125 kg/m2 respectively.
3.2 Secured at suitable vertical horizontal distances to the object on which work is designed to be completely self-
supporting.
3.3 So constructed that it has a factor of safety of not less than four
3.4 Inspected by a competent, trained and appointed person at least once per week, after inclement weather
B SCAFFOLD PLATFORM
1. Platforms constructed with timer must consist of solid boards at least 228 mm wide by 38 mm thick.
4 Boards must be placed in such a manner that tools and materials are prevented from falling through and toe-boards to be
fitted at all times.
6 Any platform which is more than 2 m above the floor or ground level is provided on all sides with:
6.2 Toe-boards, which shall be at least 150 mm high from the level of the platform and which shall be affixed that there is
no open space between the toe-board and the platform, will also be installed on the work face if the gap is of such
width that material or equipment can fell through.
6.3 All platforms must be kept free from waste, projecting nails or any other obstruction and is maintained in a non-
slippery state.
7 A safe and convenient access must be provided. Ladders must be fitted on the inside of the scaffold framework, ladders to
be staggered on each platform.
8 Dismantling of scaffolding must be done under the supervision of a competent, trained and appointed person.
9 A competent, trained and appointed person must pass all scaffolding erected as safe.
C INSPECTION
1. After erection, the appointed Scaffold Building Supervisor must inspect the scaffold.
2. Ensure it is safe and complies with Safety Codes, Procedures and Regulations.
3. Declare the scaffold safe for use by affixing SAFE TO WORK nameplate to scaffold.
4. Ensure that the inspection and every subsequent inspection are entered on to the SCAFFTAG.
D STATUTORY INSPECTIONS
HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 20 of 20
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PRODEDURE
Project Name: Festival Living Stream-02 HSE-RA 008
Job Description: Scaffold Erection and Dismantling.
N.B. Working on scaffolding is classed as elevated work and all persons there for shall make use of a SAFETY HARNESS when