HAT‐HSE‐PR‐01‐01 RISK 

REGISTER
Project Name: RISK Prob x Impact MATRIX
Issued By: HSE Department 1 to 6 Acceptable
1st Issue Date: 01/01/2020
Crane Operation 8 to 12 Moderate
Last Issue Date: N/A 15 to 25 Unacceptable
Risk Identification Details Risk Analysis before control Existing Controls for Risk  Risk Analysis  after control Risk Treatment  (should be transfer to  exissting control after execution)
Impact/Severity  Risk Rank Impact/Severity  Risk  Planned

Probability/Li

Probability
Human HSE

Human HSE
kelhood

Risk Level 
Environme

Environme
Classificati

Classificati
Level (PxI)
Operation

Operation
Repution

Repution
Financial

Financial
Strategy

Strategy
Process Steps/ Hazard / Environmental Aspect   Action  Follow up 
#

Assets

Assets
Legal

Legal
Causes Effects / Impact  Existing Controls Responsible Treatment Action

(SxI)

on

on
nt

nt
Subject details  Expected Risk  Start Finish Owner

Before 
Crane to be inspected by project Lifting Supervisor  Lifting  vehicles 
and  HSE department  Supervisor / HSE access 
the site

Acceptable
Moderate
Simultaneous activities (Interface) of other  Lack of Safety Signs or Caution tapes, 
Set up / transfer of  Personal Injury Supervisor shall discuss with the Supervisor in 
1 workers in area  Lack of Supervision , Lack of inspection  3 3 2 2 9 2 2 0 0 4
equipment charge of other workers a suitable time to  Before 
& individuals training
commence the crane set up and lifting activities. If  PA / Rigging  vehicles 
work is to proceed, Supervisor is to make the  Supervisor access 
workers aware of any additional hazards and  the site
precautions to be taken

Before allowing 
Inspection and color coding of rigging gear
access to scaffold
Maintenance / 
shall be current. Rigging gear shall be inspected  HSE Before beginning 
Damaged lifting equipment Lack of inspection and pre check  prior to use to ensure that the gear has not suffered  work / ongoing 
any damage as a result of previous use. monitoring

Selection of rigging  Damage to asset,  All lifting equipment should have valid certificate. PA / HSE Ongoing monitoring

Acceptable
moderate
equipment required for  equipment and / or 
2 3 3 2 2 9 2 3 0 0 6 Baskets / cages 
use personal injury Damaged equipment to be destroyed to prevent 
Manual Handling Lack of Training and  supervision PA / HSE provided before 
further use.
beginning work

All equipment used in the unloading of material and 
equipment shall have been inspected and certified 
Lack of supervision and safety 
as fit for use on the project. All cranes shall have  Maintenance /  Before lifting 
Struck by caught between monitoring , lack of  work site lightining 
been site inspected and have an approval certificate  HSE materials to height
and area clearness.
in the cab of the crane and an approval sticker 
attached to it.

Operator to check adequate clearance including 

Acceptable
Moderate
Personnel or structure and other equipment  Lack of lifting area isolation by caution  Equipment damage /  PA / Rigging 
slewing. Co‐ordinate crane movements with rigger.  Before accessing 
in area struck by extending out riggers tapes and hard barricading , Lack of  Personal Injury 3 3 2 2 9 Supervisor /  2 3 0 0 6
Cranes slew radius is to barricaded to restrict entry  platform
safety supervision Operator
by unauthorized personnel

All persons involved in the lift should be trained,  Before access and 
PA / HSE
experienced & competent  in their roles (LS). ongoing

The SWL shall be clearly marked on the crane and 
Lack of competence and specialized  Crane Operator Ongoing monitoring

Acceptable
Moderate
Mechanical / crane failure/ Unauthorized  Equipment damage /  should not be exceed (LS).
persons ,   Lack of lifting area isolation 
personnel setting up cranes or slinging loads Personal Injury 3 4 2 2 12 2 3 0 0 6
by caution tapes and hard barricading ,  Conduct pre‐start checks on crane prior to 
Lack of safety supervision commencing work. Report any faults to Supervisor / 
Supervision shall not instruct or permit any  PA / Rigging 
Ongoing monitoring
unauthorized personnel to be involved in setting a  Supervisor
crane up, issuing signals to the operator or slinging 
any loads

The ground bearing pressure to be tested (LS). PA / HSE Ongoing monitoring

Acceptable
moderate

Move crane(s) into  Lack of land testing and maintaining, No  Equipment damage /  Do not locate crane near or on recently backfilled 


Soft ground conditions
position and set up ready  civil calculation has been done before  Personal Injury 3 4 2 2 12 uncompact ground without placing steel mats under  2 3 0 0 6
3 the outriggers or tracks to adequately spread the  PA / Rigging 
for work  operating   Ongoing monitoring
load.  Do not position out riggers or tracks over  Supervisor
underground services such as cable trenches, 
sewers, pits or manholes.

Obstructed vision of crane operator and  Lack of supervision and safety 
Competent banks man should be appointed (LS). PA / HSE Ongoing monitoring

Acceptable
Moderate

signalman resulting in personnel being  monitoring , lack of  work site lightining 
Personal Injury
struck  by, caught between or damage to  and area clearness , lack of roads  3 4 2 2 12 2 3 0 0 6
materials or other equipment in area supervision, Lack of Communication  Adequate communication shall be maintained  Crane Operator 
Always
between Lifting team and operators between the operator & the banks man (LS).  / Banks man

Damage to asset, 
Climate and weather precautions and   Check wind speed on crane indicator, if not fitted  Operator / 
Windy conditions equipment and / or  Before staring hot 
measurements are not rightly detected  crane operator shall determine whether it is suitable  Rigging 
personal injury works
before operating  conditions for lifting. Refer to Operators Manual. Supervisor / PA

Page 1
HAT‐HSE‐PR‐01‐01 RISK REGISTER
Project Name: RISK Prob x Impact MATRIX
Issued By: HSE Department 1 to 6 Acceptable
1st Issue Date: 01/01/2020
Crane Operation 8 to 12 Moderate
Last Issue Date: N/A 15 to 25 Unacceptable
Risk Identification Details Risk Analysis before control Existing Controls for Risk  Risk Analysis  after control Risk Treatment  (should be transfer to  exissting control after execution)
Impact/Severity  Risk Rank Impact/Severity  Risk  Planned

Probability/Li

Probability
Human HSE

Human HSE
kelhood

Risk Level 
Environme

Environme
Classificati

Classificati
Level (PxI)
Operation

Operation
Repution

Repution
Financial

Financial
Strategy

Strategy
Process Steps/ Hazard / Environmental Aspect   Action  Follow up 
#

Assets

Assets
Legal

Legal
Causes Effects / Impact  Existing Controls Responsible Treatment Action

(SxI)

on

on
nt

nt
Subject details  Expected Risk  Start Finish Owner

Acceptable
moderate
Check boom length and angle against the cranes 
3 4 2 2 12 load radius chart and do not exceed this weight.   2 3 0 0 6
Damage to asset, 
Lack of working radius crane exposed to  Ensure that the load indicator installed in the crane  Operator / 
Shortage at Lifting plan and operating  equipment and / or 
stability or structural failure is calibrated and functional.  Check working radius  Rigging  Ongoing basis
field surveing  personal injury
from point of pick up to through to point of  Supervisor / PA
installation. Move crane position as required.  Refer 
to manifest to check weight of load.

Lack of supervision and safety 
Non‐essential personnel in area monitoring , lack of  work site lightining  Restrict access into working area. PA / HSE
and area clearness.

A lifting plan should be in place and risks should be 
communicated to all those involved in the work  PA / HSE
activity(LS).

Lifting 
All loads over 10T require a dedicated and 
supervisor / PA / 
appropriate lifting plan.
HSE

Dropped objects resulting in personnel 
being struck or other equipment or  Lack of lifting area isolation by caution  Lifting area to be barricaded & only persons with 
materials being damaged tapes and hard barricading. direct input are allowed to enter the  lifting area  PA / HSE
(LS).

Restrict access to the slew path area. All personnel 
are to remain clear from load path until the load is 
PA / Rigging 
lowered and rested on ground. All pipes once 
Damage to asset,  Supervisor

Acceptable
Moderate
positioned on skids or timber shall be adequately 
equipment and / or 
3 4 2 2 12 chocked to prevent unexpected movement 2 3 0 0 6
personal injury

Taglines to be used on all loads carried over 
Lifting operation shoulder height. Load is to be slewed at a slow and  Rigger
4
constant speed
Failure at lifting and rigging calculations , 
Swinging loads
Load is not rightly tied at right lifting 
angle 
In case of windy condition the lifting operation  lifting super 
should be stopped at wind speed 25 KMPH visor / HSE

A test lift shall be carried out  prior to lifting the load 
Crane Operator
(LS).

Failure at lifting and rigging calculations , 
Load unbalanced Load is not rightly tied at right lifting 
angle , lack of rigging compantence , no  Take load up on the crane and lift clear of trailer 
compatant specialized persons or team  deck. Ensure load is lifted evenly, if not lower back 
onto deck and make necessary adjustments. Once  Rigging 
the load is lifted from the trailer move the truck out  Supervisor / PA
from under the load if the truck cab does not have 
to pass under the suspended load

Damage to gear resulting from lack of  Lack of lifting area inspection and  All pipes are to be placed on timber supports and 


Rigging 
clearance under pipe to remove slings maintaining , Lack of supervision , Lack  Equipment damage spaced accordingly to ensure adequate space under  0 0 During hot works
Supervisor 
of lifting area isolation  and between the pipes to remove slings

table
erate

3 4 2 2 12 2 3 6

Page 2
HAT‐HSE‐PR‐01‐01 RISK REGISTER
Project Name: RISK Prob x Impact MATRIX
Issued By: HSE Department 1 to 6 Acceptable
1st Issue Date: 01/01/2020
Crane Operation 8 to 12 Moderate
Last Issue Date: N/A 15 to 25 Unacceptable
Risk Identification Details Risk Analysis before control Existing Controls for Risk  Risk Analysis  after control Risk Treatment  (should be transfer to  exissting control after execution)
Impact/Severity  Risk Rank Impact/Severity  Risk  Planned

Probability/Li

Probability
Human HSE

Human HSE
kelhood

Risk Level 
Environme

Environme
Classificati

Classificati
Level (PxI)
Operation

Operation
Repution

Repution
Financial

Financial
Strategy

Strategy
Process Steps/ Hazard / Environmental Aspect   Action  Follow up 
#

Assets

Assets
Legal

Legal
Causes Effects / Impact  Existing Controls Responsible Treatment Action

(SxI)

on

on
nt

nt
Subject details  Expected Risk  Start Finish Owner

3 4 2 2 12 2 3 6

Mode

Accep
Dropped objects resulting from loose 
materials being placed too close to edges of  Lack of lifting area isolation by caution  Damage to vehicle and  Ensure all loose packing material is removed from  Before staring hot 
Rigger(s) 0 0
the trailers. tapes and hard barricading Personal Injury the trailer before the pipes are lifted from the truck works