You are on page 1of 4

GENERAL CONTRACTING CO.L.L.

RISK ASSESSMENT

Risk

compliance
Job steps/

Conseque
/Potential
identified

Remarks
might be
Residual
Activities

Hazards

Control
Hazard

Risks /
Rating/

Harm/
Sl no

Legal
nces

E/I/R
Who
Mitigation action to be taken/ Hazard/Risk Risk
Risk level Control Method
L S R L S R
Serious injury due  Proper Training for Stacking, handling &
to the accidental Transportation works.
Improper manual  Tool box talk on proper manual handling
1 Stacking contact with 3 2 L
handling, lack of proper No 3 5 H R  Adequate house keeping
training machinery/Materi  Proper Supervision
al  Workers are capable for doing job &
adequate Working platform area
 Proper training for rigging works &
procedures.
Death, Serious
 Tool box talk on proper manual handling,
Improper manual body injury,
Delivery using handling, lack of proper Using of vehicles/ Equipment’s
Serious injury due
boom loader & training and skills for  Always secure blocks while on delivery on
2 to accidental 4 2 M
cranes: standard rigging Yes 4 4 H R upper levels using cranes & provide nylon net
procedures. Accidental contact with
secured & fix to avoid collapse of blocks
contact with the delivery machinery
 Maintain always good housekeeping
trailer & cranes, collapse  Proper supervision
 Adequate signal man with approved by 3rd
party certificate for vehicle and operator
GENERAL CONTRACTING CO.L.L.C

RISK ASSESSMENT
Risk

compliance
Job steps/

Conseque
/Potential
identified

Remarks
might be
Residual
Activities

Hazards

Control
Hazard

Risks /
Rating/

Harm/
Sl no

Legal
nces

E/I/R
Who
Mitigation action to be taken/ Hazard/Risk Risk
Risk level Control Method
L S R L S R
 All vehicles / equipment’s must be equipped
with all safety materials (reverse alarm,
warning light, license, vehicle certificate &
Approved 3rd party certificates….)
 Proper training and supervision
Falling from the
 Adequate supervision must be provided
height,
 Platform must be erected as per standard
Collapse of
 Ladders should be provided on the scaffolding
working platform
for easy access.
Working at height Short-term and
 Workers should not carry loads while using
Unsafe platform long term health
the ladders.
Inadequate supervision problems ,
 Materials should not be stored in front of any
Block installation Unsafe manual handling Unsafe manual
2 No 3 3 M R&I access. 2 2 L
work Excess material loading handling cause
 MSDS should be followed for the chemical.
on platform injury, dropping
 Appropriate PPE should be worn during the
falling materials of material from
work.
top,
 Housekeeping to be carried out regularly.
Falling material
 Materials should be handled ergonomically.
can harm people
 Blocks must be handled with proper PPE’s.
/property at
 Avoid direct contact with unprotected hands,
underneath
knees and wet concrete
GENERAL CONTRACTING CO.L.L.C

RISK ASSESSMENT
Risk

compliance
Job steps/

Conseque
/Potential
identified

Remarks
might be
Residual
Activities

Hazards

Control
Hazard

Risks /
Rating/

Harm/
Sl no

Legal
nces

E/I/R
Who
Mitigation action to be taken/ Hazard/Risk Risk
Risk level Control Method
L S R L S R

 All electrical system & electrically operated


hand tools must conform to Standards.
Concrete dust
Death or burns  Only electrician must install & maintain
installation, skin
Cutting of concrete due to electrical tool and electrical lines.
absorption, lack of
blocks using Power electrocution, cut,  All electrical equipment must be tested, &
4 proper training & skills, 3 3 M
tools: laceration body & No 3 5 H R inspected
Accidental contact with
serious injury  Proper training for Scaffolding works
rotating disk & electrical
 HSE Induction training conducted
hazards while using
 Tool box talk on proper manual handling
 Adequate house keeping
 Well supervision

 Adequate hygiene facilities should be


provided
 Workers must be aware of hazards & control
Mixing & Acute & chronic
Concrete dust of the materials being used
application of chest pain,
inhalation, skin  Cement dust should be controlled by applying
5 concrete mortar dermatitis, eye No 3 5 H R 3 3 M
absorption, in contact appropriate measures.
for concrete blocks pain due to
with harmful substance  All required personal protective equipment
foreign body
must be worn
 Adequate housekeeping must be maintained
 Adequate supervision
GENERAL CONTRACTING CO.L.L.C

RISK ASSESSMENT
Health and Safety
1. In case of Near Miss, Accidents or Emergencies call – (HSE Incharge--__________)
2. This Standard Risk Assessment may be revised to suit the site condition.
3. All persons will familiarize themselves and conform to project HSE rules and requirements and wear Basic PPE (Hard Hat, High-Viz Vest and Steel Toe Safety Shoes) at all
times – use additional PPE required by the job.
4. Only trained and certified operators shall operate vehicles and mobile construction machinery. Proof of competence will be available with the operator at all times for site
verification
5. Use of mobile phones during working hours is prohibited, except for emergency reporting only.
6. No eating, smoking and sleeping at the construction worksite. Use the facilities provided on site
7. Do not use defective PPE, tools, machinery, or equipment – get them replaced before you start your work
8. Report all near misses and accidents immediately to HSE Incharge and your work leader
9. Work leaders are accountable for the behavior of their operatives
10. Conduct a Tool Box Talk, Risk Assessment Review or issue safety instructions before the start of the day’s work.
11. Copy of this Risk Assessment available on site
Environmental
1. All waste materials will removed daily from the work area and transferred to the designated waste skip
2. All Hazardous waste shall be immediately removed as per UAE regulation and dispatched slip maintained.

1-Improbable 1-Negligible Likelihood X


2-Remote 2-Minor Severity E-Eliminate Reviewed by : PE/SO Approved by : PM
Severity

Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I-Isolate


4-Probable 4-Serious Medium 7-12
R-Reduce
5-Frequent 5-Catastrophic Low 1-6