You are on page 1of 13

DOC No DS/CA006P02/00022

PAGE No 1 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

Index:
Form 1 Task Analysis Initiation
Form 2 Risk Assessment Process As per Risk Assessment Procedure.
Form 3 Written Safe Work Procedure Result

Compiled by the following team:


NAME DESIGNATION SIGNATURE
Project Manager
Construction Manager
Site Engineer
Safety Officer
Risk Assessment Review 1 Review 2 Review 3 Review 4
Review Date: Date : Date : Date:

Name and Signature


of person reviewing :

AUTHORISATION
Prepared by: Approved by
Signature Date Signature Date
HSE Manager Project Manager

TASK ANALYSIS - FORM 1

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 2 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

Impact
SEQUENCE OF TASK STEPS POTENTIAL INJURIES OR HAZARDS RECOMMENDED CONTROLS
H, S, E
1. Pre-use inspection and use of all Failure of equipment will cause injuries to  Faulty equipment to be repaired/maintained or replaced.
equipment. persons and / or property damage.  Guards to be on all Machinery and appropriate PPE to be
Fuel/oil leaks could cause environmental worn.
concerns. H, S, E  Engine ran machinery to have fire extinguishers available
locally.
 Drip trays/heavy gauge plastic to be used in case of leaks
and spill kit to be within the project for accidental spills.
2. Wear appropriate Personal Protective Failure to use Personal Protective Equipment
Equipment. will cause injuries to employees.
Gloves.
Safety boots.  Enforce the use of Personal Protective Equipment AT ALL
H
Overalls. times
Hard hat.
Hearing protection.
Eye protection

3. Use trained employees only Failure may result in injuries to persons and  Enforce the use of competent persons only throughout the
H, S
property damage. project.
4. Setting of crane Failure may result in injuries to persons and  Proper procedure must be applied.
property damage.  Mobile crane outrigger must be situated properly and stable
in the ground
H,S,E  Ensure that the soil on the excavation edge is protected and
will not collapse.
 Do not keep the outrigger close to the manhole or chamber.
 Isolate the crane area.
5. Crane operation Failure may result in injuries to persons and H,S,  Crane must be inspected and certified by third party.
property damage.  Enforce the use of competent operator and rigger.
 Do not operate during bad weather condition.
 Cordoned off the lifting area.
HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 3 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

 Ensure the visibility at all times.


 Ensure the availability and accuracy of wind speed meter on
the equipment and do not operate above 35 KPH.
6. Slinging and Slewing Faulty of equipment resulting injuries to  Gradual acceleration and deceleration and slow movement
person property damage. must be ensure by the operator.
 Rigger to ensure path of movement is kept free from
possible obstruction and / or persons.
H,S  Riggers must be ensure that the loads are properly hooked
on the slings.
 Never swing the loads towards the people below, assign
watchman.
 Enforce the use of guide rope on both ends of the loads.
7. Lifting and Installation works on heights – Failure will result injuries to person and  Provide safe working platform.
roofs, slab edge, walls, and columns property damage.  Standard edge protection on slab must be provided
 Ensure proper wiring and connections are in place.
 Check the voltage intended to the machinery.
H,S,  Operatives must be aware and alert on the incoming loads.
 Enforce the use of guide rope to control the load movement
and avoid strike to operatives.
 Use full body harness while on edge and ensure the
presence of competent rigger in the same area

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 4 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

RISK ASSESSMENT – FORM 2


Risk Rating Calculation
A + B + C + D
Injury Severity Potential Damage / Loss Frequency or Likelihood Environmental Impact
0 No injury 0 No damage 0 Never happened before 0 No effect
1 Minor – (FAC) 1 Minor < 500 AED, No delay 1 Happened somewhere 1 Minor Effect - Short term < less 1 month
2 Major – (MTC) 2 Major > 500 AED, No delay 2 Happens occasionally 2 Major Effect - Long term > greater 1 month
3 LTI 3 Major > 10 000 AED, one day delay 3 Happened before
4 Disabling Injuries 4 Serious > 100, 000 AED, >1 day delay 4 Happens regularly Risk Rating Matrix
5 Fatality 5 Severe > 1, 000, 000 AED, Weeks delay. 5 Daily occurrence
Risk Rating = A + B + C + D.
Result Classification: Risk Rating
16
14

Critical = 17►15 High = 14►11 Medium = 10►7 Low = 6►0 12


10
Immediate action. Action in 24 hours. Action in a week. ASAP. 8
6
4
Risk Reduction Hierarchy: 2
0
1. Engineering to reduce risk. 1
5
2. Replacement with lower risk. 2
3
4
4
3
3. Isolation of risk – Barricading or Guarding. Potential Impact
5
6
2
Probability
(C)
7
4. Reduction of exposure to risk. (A / B / D) 8
9 1
5. PPE and Training

RISK ASSESSMENT – FORM 2 (continued)


HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 5 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

Impact HOW IS HAZARD TO BE BY Result


No HAZARD IDENTIFIED RISK ASSOCIATED WITH HAZARD H, S, E RR BY WHOM RR
DEALT WITH WHEN
1  Faulty hand tools Bruises, cuts. Gloves, trowels in good Supervisor Before &
condition. during
 Mechanical guards not Entanglement, Skeletal Damage. the use
in place Guards in place and equipment of
H,S,E 13 regularly maintained. equipme 6
nt
 Unwanted Fuel/Oil Contamination of the soil, atmospheric Care to be taken refuelling and
Spillages pollution, risk of fire. drip trays/heavy gauge plastic to
be in place as required.
2 Injury to project Potential Death, Major/Minor Skeletal Following PPE to be worn Supervisor Before &
employees damage, cuts and bruises to all parts of appropriately to the task – during
the body, asthma. Gloves. work
Safety boots.
H,S 10 5
Overalls.
Hard hat.
Hearing protection.
Eye protection
3 Un trained employees Poor quality of work, chance for Provided trained/competent PE/FM Always
H,S 7 5
accident /incident or property lost/damage worker and supervision
4 Equipment close to Potential Death, Major/Minor impact Mobile crane outrigger must be PE/FM/ Before
opening / excavation / injuries. Collapse of equipment to situated properly and stable in Mechanic work
manhole persons. the ground
Ensure that the soil on the
excavation edge is protected and
H,S,E 12 7
will not collapse
If can be avoid, do not keep the
mobile crane close to the
excavation
Consult on the local authority

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 6 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

regarding the underground utility


might exist in the area such as
high voltage cables, high
pressure pipelines
Do not keep the outrigger close
to the manhole or chamber.

Mobile crane driver / operator


Manoeuvring of Road traffic accident involving must hold the valid driving
Equipment pedestrians and nearby operatives license and vehicle registration
Equipment to be inspected by
approved third party and checked
by operator prior to use
Operator and riggers must have
the valid third party certificate of
competency
Speed limit of 25kmph on site to
be imposed
Reverse alarm and flagman
required for manoeuvring onsite.
to the equipment.

Environmental concern Excessive Noise & Oil, fuel spillage Noise levels to be monitored and
restricted to social able timings
where ever practicably possible.
Ensure the regular maintenance
to the equipment.
Keep the diesel drums in the
bonded area or drip tray.
Avoid spillage when filling diesel.
Ensure the provision of fire
fighting equipment.

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 7 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

5 Presence of bad weather Potential Death, Major/Minor impact Never operates crane under the PE/FM/ Before
condition injuries. Collapse of equipment or falling bad weather condition such as supervisor work
of loads to persons high wind pressure, rains
Consider the weather condition
and update on the weather
H, S 10 6
forecast information
Ensure the availability and
accuracy of wind speed meter on
the equipment do not operate
above 35 KPH
6 Unsafe lifting and rigging / Potential Death, Major/Minor impact Gradual acceleration and PE/FM/ Before
Detached of slings injuries. deceleration and slow movement Mechanic and
caused by movement Falling of suspended loads to person to must be ensure by the operator during
for fast braking / persons Rigger to ensure path of the work
Defective lifting gears movement is kept free from
possible obstruction and / or
persons
Never swing the loads towards
the people below, assign
watchman
H, S 13 Enforce the use of guide rope on 6
both ends of the loads if
necessary.
All lifting gears must be inspected
and certified by third party before
use.
Riggers must also inspect the
lifting gears before use and they
must be alert on possible failure
of the gears.
Do not use damage sling and

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 8 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

shackles
Enforce the use of competent
riggers
Ensure that the slings are
properly tied on the loads and
stable
Ensure that the slings are
capable on the weight of the
loads; check the load capacity on
the certificates.

7 Working at height - Potential Death, Major/Minor impact Use full body harness while on FM/ Always
Unsafe scaffolding or injuries. edge and ensure the presence of Supervisor
working platforms / Striking of loads into people or platform competent rigger in the same Operative
Unguarded slab edge. resulting collapses of scaffolds/platforms area
and chance for accident / incident or Enforce the use of guide rope to
property damage. control the load movement and
avoid strike to operatives
Operatives must be aware and
alert on the incoming loads
Ensure the provision of standard
H,S 8 edge protection guardrails and 5
toe boards
Provide safe working platform
Ensure that the scaffolding to be
use is comply with the standard
requirements guardrail and toe
boards, safe access and egress
Scaffolding must be erected by
certified scaffolding erectors.
Scaffolding / working platform
must be inspected before use

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 9 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

and ensure tagging system is in


place
Do not keep materials close to
the edge of the platform
Ensure that the platform is
protected from any falling object
Toolbox talk and training must be
conducted related to the working
at heights
Isolate the area below.
WRITTEN SAFE WORK PROCEDURE – FORM 3

1. OBJECTIVE
1. To prevent injuries to employees and / or property damage incidents.

2. PROCEDURE
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2. Safety boots.
3.3. Overalls.
3.4. Eye protection.
3.5. Safety harness

Prior to work commencement

1. Must have PPE – safety footwear, gloves, hardhat, goggles, safety harness, protective clothing etc.

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 10 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

2. Must have appropriate tools and equipment in good condition.


3. Must have weatherproof covers for materials and equipment, waste containers, warning tape.
4. Consider risks and hazards in work area. Refer any concerns to supervisor. Are relevant permits in place?
5. Check if it is necessary to secure area adjacent to work. Refer to supervisor if appropriate.
6. Arrange for transport of materials and equipment to site via supervisor.
7. Ensure materials and equipment are secure or removed when site unattended, eg overnight or during breaks.

Hazards

1. Manual handling of materials and equipment – LITE to be considered at all times.


2. Slips and trips from untidy work area.
3. Falling of materials.
4. Collapse of existing structures, eg scaffolding, working platform, equipment.
5. Hazards associated with equipment used for lifting of materials, eg. Cranes, etc.
6. Contact with sharp edges of materials.
7. Consideration of weather and ground conditions must be made. If in doubt refer supervisor.
8. Environmental damage.
9. Fire hazard.
10. Electrical hazard.
11. Working at heights.
12. Bad weather condition.

Harm
Potential Death, Minor/major cuts and contusion, loss of limbs, fractures, damage to respiratory system, electric shock.

Persons in danger

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 11 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

1. Labour / Staff.
2. Riggers , Operators
3. Other workers/visitors in vicinity, eg. Passers - by in walkways etc.

Control measures

Crane Load Test Certificates

The Certificate will be no older than 12 months, when arriving on site and will cover following:

1. Ropes (certificates will be identifiable to the specific crane).


2. Hooks.
3. Slew Brakes.
4. Outriggers and Pads.
5. Boom and Guides.
6. Anti Two-block Device.
7. Load Indicating System.
8. Boom Sheave Wheels Condition
9. Crane Brakes and Air System.
10. Load test certificate (identifiable to the specific crane).

All Cranes will be fitted with the following Safety Devices - As per the Code of Construction Safety Practice of 61/1991 (chapter 6.4 A)

HSE/QUALITY SYSTEM DOCUMENTATION


DOC No DS/CA006P02/00022
PAGE No 12 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

A Brake or other device capable of holding the maximum mass should the power fail, or which is such that it will automatically prevent the
uncontrolled downward movement of the load when the raising effort is interrupted; and
A Limiting device which will automatically arrest the driving effort when:

The Hook or Load attachment point of the Power Driven lifting machine reaches its highest safe position; and in the case of a Winch
Operated lifting machine with a lifting capacity of 5000 kg or more: the load is greater than the rated mass load of such machine.

No user shall use or permit any person to use a Jib-Crane with a lifting capacity of 5000 kg or more at a minimum Jib radius, unless it is
provided with:

A load indicator that will indicate to the operator of the Jib-Crane the mass of the load being lifted, provided that such a device shall not
require manual adjustment from the application of the load, to the Jib-Crane, until the release of the load.
A Limiting Device which will automatically arrest the driving effort whenever the load being lifted is greater than the rated mass load of the
Jib-Crane.

The user shall ensure that every lifting machine is operated by an Operator specifically trained for a particular type of lifting machine;
provided that in case of fork lift trucks with a lifting capacity of 750 kg or more, and Jib-Cranes with a lifting capacity of 5000 kg or more at
minimum Jib-radius; the user shall not require or permit a person to operate such lifting machine unless the operator is in possession of a
certificate of training, issued by a person or organisation approved for the purpose by the chief inspector.

Acceptance of cranes on site

No Crane will be used at arrival on Site before copies of all documentation have been handed over to the Safety Co-ordinator and the
Crane have been checked by a person dually authorised by him and signed off as acceptable.

1. Copies of all documentation will be kept in the Crane at all times.


HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 13 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name:   Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage

2. No Crane will be used without a pre-use check and findings entered on an approved checklist. (See Crane Inspection Checklist).

No crane operator will be allowed to operate a crane without proof of training and certification by an.

HSE/QUALITY SYSTEM DOCUMENTATION