Impact
SEQUENCE OF TASK STEPS POTENTIAL INJURIES OR HAZARDS RECOMMENDED CONTROLS
H, S, E
1. Pre-use inspection and use of all Failure of equipment will cause injuries to Faulty equipment to be repaired/maintained or replaced.
equipment. persons and / or property damage. Guards to be on all Machinery and appropriate PPE to be
Fuel/oil leaks could cause environmental worn.
concerns. H, S, E Engine ran machinery to have fire extinguishers available
locally.
Drip trays/heavy gauge plastic to be used in case of leaks
and spill kit to be within the project for accidental spills.
2. Wear appropriate Personal Protective Failure to use Personal Protective Equipment
Equipment. will cause injuries to employees.
Gloves.
Safety boots. Enforce the use of Personal Protective Equipment AT ALL
H
Overalls. times
Hard hat.
Hearing protection.
Eye protection
3. Use trained employees only Failure may result in injuries to persons and Enforce the use of competent persons only throughout the
H, S
property damage. project.
4. Setting of crane Failure may result in injuries to persons and Proper procedure must be applied.
property damage. Mobile crane outrigger must be situated properly and stable
in the ground
H,S,E Ensure that the soil on the excavation edge is protected and
will not collapse.
Do not keep the outrigger close to the manhole or chamber.
Isolate the crane area.
5. Crane operation Failure may result in injuries to persons and H,S, Crane must be inspected and certified by third party.
property damage. Enforce the use of competent operator and rigger.
Do not operate during bad weather condition.
Cordoned off the lifting area.
HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 3 of 13
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 007
Job Description: Crane Usage
Environmental concern Excessive Noise & Oil, fuel spillage Noise levels to be monitored and
restricted to social able timings
where ever practicably possible.
Ensure the regular maintenance
to the equipment.
Keep the diesel drums in the
bonded area or drip tray.
Avoid spillage when filling diesel.
Ensure the provision of fire
fighting equipment.
5 Presence of bad weather Potential Death, Major/Minor impact Never operates crane under the PE/FM/ Before
condition injuries. Collapse of equipment or falling bad weather condition such as supervisor work
of loads to persons high wind pressure, rains
Consider the weather condition
and update on the weather
H, S 10 6
forecast information
Ensure the availability and
accuracy of wind speed meter on
the equipment do not operate
above 35 KPH
6 Unsafe lifting and rigging / Potential Death, Major/Minor impact Gradual acceleration and PE/FM/ Before
Detached of slings injuries. deceleration and slow movement Mechanic and
caused by movement Falling of suspended loads to person to must be ensure by the operator during
for fast braking / persons Rigger to ensure path of the work
Defective lifting gears movement is kept free from
possible obstruction and / or
persons
Never swing the loads towards
the people below, assign
watchman
H, S 13 Enforce the use of guide rope on 6
both ends of the loads if
necessary.
All lifting gears must be inspected
and certified by third party before
use.
Riggers must also inspect the
lifting gears before use and they
must be alert on possible failure
of the gears.
Do not use damage sling and
shackles
Enforce the use of competent
riggers
Ensure that the slings are
properly tied on the loads and
stable
Ensure that the slings are
capable on the weight of the
loads; check the load capacity on
the certificates.
7 Working at height - Potential Death, Major/Minor impact Use full body harness while on FM/ Always
Unsafe scaffolding or injuries. edge and ensure the presence of Supervisor
working platforms / Striking of loads into people or platform competent rigger in the same Operative
Unguarded slab edge. resulting collapses of scaffolds/platforms area
and chance for accident / incident or Enforce the use of guide rope to
property damage. control the load movement and
avoid strike to operatives
Operatives must be aware and
alert on the incoming loads
Ensure the provision of standard
H,S 8 edge protection guardrails and 5
toe boards
Provide safe working platform
Ensure that the scaffolding to be
use is comply with the standard
requirements guardrail and toe
boards, safe access and egress
Scaffolding must be erected by
certified scaffolding erectors.
Scaffolding / working platform
must be inspected before use
1. OBJECTIVE
1. To prevent injuries to employees and / or property damage incidents.
2. PROCEDURE
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2. Safety boots.
3.3. Overalls.
3.4. Eye protection.
3.5. Safety harness
1. Must have PPE – safety footwear, gloves, hardhat, goggles, safety harness, protective clothing etc.
Hazards
Harm
Potential Death, Minor/major cuts and contusion, loss of limbs, fractures, damage to respiratory system, electric shock.
Persons in danger
1. Labour / Staff.
2. Riggers , Operators
3. Other workers/visitors in vicinity, eg. Passers - by in walkways etc.
Control measures
The Certificate will be no older than 12 months, when arriving on site and will cover following:
All Cranes will be fitted with the following Safety Devices - As per the Code of Construction Safety Practice of 61/1991 (chapter 6.4 A)
A Brake or other device capable of holding the maximum mass should the power fail, or which is such that it will automatically prevent the
uncontrolled downward movement of the load when the raising effort is interrupted; and
A Limiting device which will automatically arrest the driving effort when:
The Hook or Load attachment point of the Power Driven lifting machine reaches its highest safe position; and in the case of a Winch
Operated lifting machine with a lifting capacity of 5000 kg or more: the load is greater than the rated mass load of such machine.
No user shall use or permit any person to use a Jib-Crane with a lifting capacity of 5000 kg or more at a minimum Jib radius, unless it is
provided with:
A load indicator that will indicate to the operator of the Jib-Crane the mass of the load being lifted, provided that such a device shall not
require manual adjustment from the application of the load, to the Jib-Crane, until the release of the load.
A Limiting Device which will automatically arrest the driving effort whenever the load being lifted is greater than the rated mass load of the
Jib-Crane.
The user shall ensure that every lifting machine is operated by an Operator specifically trained for a particular type of lifting machine;
provided that in case of fork lift trucks with a lifting capacity of 750 kg or more, and Jib-Cranes with a lifting capacity of 5000 kg or more at
minimum Jib-radius; the user shall not require or permit a person to operate such lifting machine unless the operator is in possession of a
certificate of training, issued by a person or organisation approved for the purpose by the chief inspector.
No Crane will be used at arrival on Site before copies of all documentation have been handed over to the Safety Co-ordinator and the
Crane have been checked by a person dually authorised by him and signed off as acceptable.
2. No Crane will be used without a pre-use check and findings entered on an approved checklist. (See Crane Inspection Checklist).
No crane operator will be allowed to operate a crane without proof of training and certification by an.