THASITHA PROJECTS
To mitigate hazards and risks, we will ensure that the appropriate safety signage is provided, communication relating to hazards is provided to Workers, proof
of induction is available, safety talks are conducted, ensure competent supervision of high risk activities, records of training of EHS Reps, Fire Wardens, First
Aiders, Operators are available. Issue PPE and maintain records of issue and usage. Identify safer methods of performing hazardous activities, job safety
assessments, etc
Electrical Electrical (Shock/ Short Circuit) Contact with Only accredited, trained person to work on electrification of site.
exposed conductors or a device that is incorrectly Use properly insulated tools. Use qualified & trained staff. Safe
or inadvertently grounded, such as when a metal work procedure / lock out procedure to be available and followed
ladder comes into contact with power lines. when working on electrical machinery and / or equipment.
Alternating current is very dangerous because it Ensure that the connections (DB Boards, cables to equipment,
can stop the heart. equipment, etc.) are tight. Do not use multiple extension cords
Electrical (Fire) Use of electrical power that for supplying power to different pieces of electrical equipment to
results in electrical overheating or arcing to the prevent overloading and fires.
point of combustion or ignition of flammables, or Bond containers when dispensing flammable liquids from one
electrical component damage. container to the next to reduce the risk of static discharge.
Electrical (Static) Flowing liquids can generate Certificate of Compliance to be issued before the electrical
static electricity. installation is handed over for use, or if alterations and
modifications have been done.
Access to live equipment is to be controlled.
Lock-out A safe method to prevent the motion, Ensure that circuits are locked out when there is a possibility that
Secured electrification or activation of equipment while the equipment could be activated remotely or from another
this equipment is being worked on. location.
(Electricians)
conditions
Task or means a mitigate the (1 – (High, Task or conditions means a
for Risks to
activity source of or Risk. (Also refer 25) Medium activity for Risks source of or
task or
exposure to to the applicable or low) to task or exposure to
activity
danger. (OHS Safe Work activity danger.
18-07-2017
Title: EHS MANAGEMENT PLAN THASITHA PROJECT
1. Likelihood index
4 – Highly Likely
3 – Likely
2- Moderate
1- Low
18-07-2017
Title: EHS MANAGEMENT PLAN THASITHA PROJECT
2. Frequency Index
FEW 1 1 2
MODERATE NO. 1 2 3
MANY 2 3 3
3. SEVERITY INDEX
2 – 3 Minor risk of injury, illness not a lost time, non disruptive property damage, quality/production problems resulting in loss between R1 000-00 – R10 000-00.
4 – 5 Risk of a lost time injury without permanent disability, disruptive property damage quality / production or other losses between R10 000-00 – R50 000-00.
18-07-2017
Title: EHS MANAGEMENT PLAN THASITHA PROJECT
6 – Risk of permanent disabling injury, loss of life/body part or other losses exceeding R50 000-00.
RISK ASSESSED
High – 18 - 25
Medium – 9 - 17
Low – 1 - 8
Factors to be Considered
- Complexity of task
- Any rating above 8 will require actions to address issues e.g. procedures, guarding, training etc.
PRIORITY GUIDE
Once a risk rating has been calculated, the following scheme should be used to assign priority of action. It should be noted that if action is not taken within the time
specified, then the continued toleration of the residual ‘downside’ risk should be explicitly authorized. The suggested level of seniority for authorization is as shown
below.
to 14 or below
3 4 – 14 Specific action to deal with risk PD
daily
4 2–4 Plan in keeping with all other PD
priorities
18-07-2017
18-07-2017
THIS MATRIX MUST BE USED TO RATE THE CRITICALITY OF TASKS
1. SEVERITY INDEX
2 – Minor risk of injury, illness not a lost time, non disruptive property damage, quality/production problems resulting
in loss between R1 000-00 – R10 000-00.
4 – Risk of a lost time injury without permanent disability, disruptive property damage quality / production or other
losses between R10 000-00 – R50 000-00.
6 – Risk of permanent disabling injury, loss of life/body part or other losses exceeding R50 000-00.
2. Frequency Index
FEW 1 1 2
MODERATE NO. 1 2 3
MANY 2 3 3
3. Probability Index
-1 Low probability
0 Moderate probability
+1 High probability
Factors to be Considered
- Complexity of task
- Any rating above 8 will require actions to address issues e.g. procedures, guarding, training etc.
PRIORITY GUIDE
Once a risk rating has been calculated, the following scheme should be used to assign priority of action. It should be
noted that if action is not taken within the time specified, then the continued toleration of the residual ‘downside’ risk
should be explicitly authorized. The suggested level of seniority for authorization is as shown below.
18-07-2017
toleration of residual risk
Rating
1 Greater than 8 Cessation until the residual risk is PD
reduced to 8 or below - unless
exposure is authorized as
indicated.
2 6–8 Take action to reduce residual risk PD
to 6 or below
3 4–6 Specific action to deal with risk PD
daily
4 2–4 Plan in keeping with all other PD
priorities