Project Name: Construction of Fire Water Tank Job In-charge Muhammad Zeeshan
required to perform the List the identified hazards with List the controls measures required. Department/
task. In the sequence that each step. S L R.R L/M/H person to
they are to be carried out. implement it
1 Mobilization of Un-inducted, Un-trained Appoint only those workers who are 4 3 12 Medium Project Manager
equipment, Tools, and /Unskilled workforce. well trained and authorized. HSSE Supervisor
Manpower Non-Inspected tools and Educate all workers about safe Site Engineer
equipment. working environment.
Unfamiliarity with No one shall be in line of fire while
emergency procedures. doing job or heavy equipment &
Unawareness of site- vehicle operation.
specific hazards. Use only pre-inspected tools.
Unawareness of restricted Staff/workers must be inducted prior
areas. to commence job.
Moving of pedestrian on Trained and skilled workforce shall be
vehicle route may lead to selected for safe and smooth
personal injury / fatality. execution.
Over-speeding leading to Site specific hazards must be shared
to workforce i.e., heavy equipment &
vehicle collapse.
vehicle operation.
Vehicle movement on non- Only trained and assessed personnel
JOB SAFETY ANALYSIS
Document No. Release Date Revision Page
HSE-FRM-002 August 31, 2018 00 1 of 1
Elite Engineering Pvt. Ltd.