JOB SAFETY ANALYSIS

Document No. Release Date Revision Page


HSE-FRM-002 August 31, 2018 00 1 of 1
Elite Engineering Pvt. Ltd.

Project Name: Construction of Fire Water Tank Job In-charge Muhammad Zeeshan

Location: PSO Depot Faisalabad Date: 26 October 2023


Task
Bottom Laying installation of Fire Water Tank PPEs Required: Safety Helmet, Safety Shoes, Gloves, Safety Visible Jackets, Coverall
Description:

Job Activities Risk Rating


Risk Level Responsible
S x L =R
List the key job steps Hazards Preventive Measures Authority
Step

required to perform the List the identified hazards with List the controls measures required. Department/
task. In the sequence that each step. S L R.R L/M/H person to
they are to be carried out. implement it
1 Mobilization of  Un-inducted, Un-trained  Appoint only those workers who are 4 3 12 Medium Project Manager
equipment, Tools, and  /Unskilled workforce. well trained and authorized. HSSE Supervisor
Manpower  Non-Inspected tools and  Educate all workers about safe Site Engineer
equipment. working environment.
 Unfamiliarity with  No one shall be in line of fire while
emergency procedures. doing job or heavy equipment &
 Unawareness of site- vehicle operation.
specific hazards.  Use only pre-inspected tools.
 Unawareness of restricted  Staff/workers must be inducted prior
areas. to commence job.
 Moving of pedestrian on  Trained and skilled workforce shall be
vehicle route may lead to selected for safe and smooth
personal injury / fatality. execution.
 Over-speeding leading to  Site specific hazards must be shared
to workforce i.e., heavy equipment &
vehicle collapse.
vehicle operation.
 Vehicle movement on non-  Only trained and assessed personnel
JOB SAFETY ANALYSIS
Document No. Release Date Revision Page
HSE-FRM-002 August 31, 2018 00 1 of 1
Elite Engineering Pvt. Ltd.

shall be deputed for power tools and


designated path may lead critical roles.
to vehicle accident,  10km/hr. speed limit shall be
personal injury/Fatality. maintained all the time.
 Flagman to escort all vehicles to
 Emergency exits blockage designated /Communicate traffic rout
due to parking at wrong layout to all drivers, operators, and
place. workers.
 Un-tied load/materials  Educate all drivers about safe parking
of vehicles in case of an emergency.
 Use hand trolley pallet trolly for load
transportation.
 Conducting TBT before starting the
task.
 Supervisors ensure that all the workers
 Upper limb disorder
have proper training and information
 Low limb disorder
about the load.
 Back injury Project Manager
Manual Loading  Never attempt the heavy load
2  Hand and foot injury 4 3 12 Medium HSSE Supervisor
Unloading manually.
 Permanent disability Site Engineer
 Seek more people help and an
 Personal Injury
engineering aid to handle heavy loads.
• Property damage
 Trained workers performed the task
under supervision.
 Maintain good housekeeping in the
area to avoid slip trip and fall.
 Use required PPE’s and Barrication.
3 Loading / Offloading  In-competent crew, Poor  Pre-mobilization inspection of rigging 4 3 12 Medium Project Manager
and choice of rigging gears gears shall be conducted and apply HSSE Supervisor
Rigging / Lifting monthly color code as per color code Site Engineer
JOB SAFETY ANALYSIS
Document No. Release Date Revision Page
HSE-FRM-002 August 31, 2018 00 1 of 1
Elite Engineering Pvt. Ltd.

Operation. stacking/storage may lead scheme.


to accident.  Pre- Site Assessment to be done
 Accident due to failure of before crane placing at work location.
lifting equipment.  Use two taglines (Manila rope) to
 Over-loading or over- control the load never use bare
speeding of crane and hands.
trailers.  Ensure the hands-free techniques
 Ergonomics-WRULDs. while mechanical installation.
 Extreme weather conditions  Allocate only 3rd party certified crane
(Heat, Rain and High wind). operator with valid license.
 Personal injury.
 Use 3rd party certified rigging gears
 LOF.
for lifting activity.
 Dropped objects.
 Map the crane movement and boom
 SIMOPS.
radius including crane boom positions
 Non-compliance of
during lifting and crane movement.
procedural requirements
 Lifting, offloading activity shall be
performed as per approved lifting
plan.
 Lifting area shall be barricaded and
awareness signage must be displayed
to educate crew.
 Restrict un-authorized entry towards
rigging and lifting area.
 Implement dropped object plan while
suspended load in progress.
 No lifting by crane activity to be
performed at wind speed equal or
JOB SAFETY ANALYSIS
Document No. Release Date Revision Page
HSE-FRM-002 August 31, 2018 00 1 of 1
Elite Engineering Pvt. Ltd.

greater than 32 km/hrs.


 Communications means like hand
signals and whistles to be used.
 In Toolbox talk it will be Remind all
the workers never to be under
suspension load.
 10 Questions of Lifting & Hoisting
shall be ensured.
 Pre-Task Briefing shall be conducted
by activity supervisor prior to start
operations.
 Right tools for right job shall be
performed and utilized.
 Tool log shall be maintained, and
damaged tool shall be sent back, and
defective do not use tag shall be
installed.
 Strictly follow equipment preventive
maintenance plan for timely change
of any equipment parts i.e., engine
oil, Filter, operator cabinet operation
panel.
 Restrict unauthorized personnel and
no one shall be under suspended
load.
 All the mandatory PPEs must be
warned by involved workers.
JOB SAFETY ANALYSIS
Document No. Release Date Revision Page
HSE-FRM-002 August 31, 2018 00 1 of 1
Elite Engineering Pvt. Ltd.

 Appoint only those personals for


manual handling whose body weight
is proportionate to the load to be
lifted.
 All PPEs marked in PTW to be
provided to the workers.
 Prepare method statement, JHA,
Emergency rescue plan and obtain
work permit authorization properly.
Apply for JHA, Work permit & or high-
risk activity checklist certificate
according to activity table.
4 Hot Work  Damage faulty tools and  Inspection welding machine and power 4 3 12 Medium Project Manager
Equipment tool for safe operation tag. HSSE Supervisor
 Fire  Proved machine with Earth leakage Site Engineer
 Burn circuit breakers (ELCB).
 Electrical shock  Entry of non-certified tools and
 Personnel injury equipment not allowed.
 Fumes  Ensure that welding team is
• Spark experienced and trained.
 Ensure the work area free from
flammable / toxic material by safe
(isolation, depressurizing, draining,
venting, flushing, purging as required).
 Keep extinguishing equipment in ready
condition.
 Take hot work permit and follow
JOB SAFETY ANALYSIS
Document No. Release Date Revision Page
HSE-FRM-002 August 31, 2018 00 1 of 1
Elite Engineering Pvt. Ltd.

instructions as per PTW.


 Wear long sleeved Safety Shoes.
 Ensure Coverall, Leather Apron.
 Enclose the hot work area through
fireproof & fire blanket tarpaulin.
 Conduct pre-work TBT to instruct about
job and its precautions.
 If immovable, then cover it with a fire
blanket.
 Perform gas test and record the
reading.
• Fire watchman has his training card
5 Housekeeping &  Cuts, Bruises and  After job completion keep all tools in 2 3 6 Low Project Manager
Waste Management  Abrasion their designated place. HSSE Supervisor
• Dust  Keep barricades where required or Site Engineer
• Tripping Hazards remove them after the activity is Admin Manager
• Manual handling complete.
 Ensure that emergency paths and
access egress routes are clear from
material / equipment.
• Housekeeping to be performed on daily
basis prior to start the job, during break
and after completion of job.
• Checklist to be maintained on daily
basis.
• Access & Passageways should be clear
from any obstruction.
JOB SAFETY ANALYSIS
Document No. Release Date Revision Page
HSE-FRM-002 August 31, 2018 00 1 of 1
Elite Engineering Pvt. Ltd.

• Warning signs should be posted.


Note: Emergency Response Team shall be stand by all through the day , until the activity performed safely.

Project Engineer: ______Muhammad Zeeshan____ Signature: ____________________________ Date: _____________________

HSE Representative: _____FIAZ HUSSAIN_____ Signature: ___________________________ Date: ______________________