JOB SAFETY ANALYSIS FOR CIVIL

HSEQ-RECS-01
CONSTRUCTION WORKS
Rev.A Dated:25.08.2018
Job Title: Upgrade of Bulk Oil Storage Depot at Daulatpur Project
Page 1 of 6

Depot / Location: Daulatpur, Sindh


REQUIRED & RECOMMENDED PERSONAL PROTECTIVE EQUIPMENT: Safety Shoes, Safety Helmet, Coverall, Goggles, Cotton Gloves, Safety
Harness
Basic Job Steps Potential Hazards Recommended Action or Safety Procedures Responsibility
Vehicle entry permit & Cold work permit
Shifting of Tools and Accident, Only inspected vehicle to be used PUMA HSE /
Equipment’s Injury & Fatality Civil Staff /
Only authorized person will drive the vehicle.
Property Damage Contractor
During driving speed limit does not exceed 20 Km per hour.
Use of personal protective equipment (Safety Shoes, Safety
Helmet, Goggles & gloves)
Barricading of work area
Proper placement of tools & equipment
Safety orientation of entire staff prior to start of the job
Identification & communication of job associated hazards to all
concerned at site
Full time availability of Contractor / PUMA Supervisor at site
Housekeeping during and after work
Demarcation and barricading of the area
Personal injury. Safety sign boards PUMA HSE /
Excavation & Earth Filling Falling into pit, Civil Staff /
Use of Personal Protective Equipment (coverall, safety shoes,
Tripping from loose Contractor
gloves).
earth/stones.
Tilting of Equipment. Proper placement of tools and equipment’s
Safety orientation of entire staff prior to start of job.
Identification and communication of job associated hazards to
all concerned at site.
Housekeeping during and after work.
Full time availability of Contractor / PUMA Supervisor
Loader operator must be trained.
JOB SAFETY ANALYSIS FOR CIVIL
HSEQ-RECS-01
CONSTRUCTION WORKS
Rev.A Dated:25.08.2018
Job Title: Upgrade of Bulk Oil Storage Depot at Daulatpur Project
Page 2 of 6

Trained banks man must be present to execute the activity.


Un authorized people shall be kept away from excavation
area.
Safe and proper ladders must be used for working.
Vehicle operator must be trained.
Compaction of Earth Personal injury. Trained banks man must be present to execute the activity. PUMA HSE /
Falling into pit, Civil Staff /
Un authorized people shall be kept away from excavation
Tripping from loose Contractor
area.
earth/stones.
Tilting of Equipment. Safe and proper ladders must be used for working.
Safety orientation of entire staff prior to start of job.
Identification and communication of job associated hazards to
all concerned at site.
Housekeeping during and after work.
Full time availability of Contractor / PUMA Supervisor
Vehicle operator must be trained.
Laying & Compaction of Sub Personal injury. Trained banks man must be present to execute the activity. PUMA HSE /
Base Falling into pit,
Safe and proper ladders must be used for working.
Civil Staff /
Tripping from loose Contractor
earth/stones. Safety orientation of entire staff prior to start of job.
Tilting of Equipment. Identification and communication of job associated hazards to
all concerned at site.
Housekeeping during and after work.
Full time availability of Contractor / PUMA Supervisor
Accident, Use of personal protective equipment (Safety Shoes, Safety
Sand Cushion and Paver Work Injury & Fatality Helmet, Goggles & gloves) PUMA HSE /
Property Damage Barricading of work area Civil Staff /
Contractor
Proper placement of tools & equipment
Safety orientation of entire staff prior to start of the job
Use pavers carefully
JOB SAFETY ANALYSIS FOR CIVIL
HSEQ-RECS-01
CONSTRUCTION WORKS
Rev.A Dated:25.08.2018
Job Title: Upgrade of Bulk Oil Storage Depot at Daulatpur Project
Page 3 of 6

Remove all material and debris material from the site and conduct
good house keeping.
Remove unnecessary barriers.
Place material at designated area.
Ensured proper stacking area to store material.
Junkyard must be made for waste management.
Ground Surface must be Levelled.
Full time availability of Contractor Supervisor at site
Vehicle operator must be trained.
Laying & Compaction of Bolder Accident, Trained banks man must be present to execute the activity. PUMA HSE /
& Sub Base (Hard Standing Injury & Fatality
Safe and proper ladders must be used for working.
Civil Staff /
Area) Property Damage Contractor
Safety orientation of entire staff prior to start of job.
Use of Personal Protective Equipment (coverall, safety shoes,
gloves).
Identification and communication of job associated hazards to all
concerned at site.
Housekeeping during and after work.
Full time availability of Contractor / PUMA Supervisor
Trained personnel must perform the activity PUMA HSE /
Cutting & Laying Reinforcement Personnel injury (cutting Use of personal protective equipment (Safety Shoes, Safety Civil Staff /
Steel of Fingers) Due to Helmet, Goggles & gloves) Contractor
untrained workers
Barricading of work area
Electrocution
Injury due to tripping Proper placement of tools & equipment
/falling Safety orientation of entire staff prior to start of the job
Identification & communication of job associated hazards to all
concerned at site
Housekeeping during and after work
Operator must be trained. PUMA HSE /
Concrete Work Personnel injury due to Banks man must execute the activity. Civil Staff /
JOB SAFETY ANALYSIS FOR CIVIL
HSEQ-RECS-01
CONSTRUCTION WORKS
Rev.A Dated:25.08.2018
Job Title: Upgrade of Bulk Oil Storage Depot at Daulatpur Project
Page 4 of 6

contacting with moving Area must be levelled & compacted. Contractor


parts, hot surfaces. All moving parts of mixing machines should be properly
Property Loss guarded /fenced.
Skin allergy contacting
Hot surfaces should also be protected.
with cement,
Respiratory problem with Engine exhaust must be positioned opposing working crew.
smoke & cement powder. A Fire extinguisher must be located near by.
Personnel handling cement must wear Dust mask
Use of personal protective equipment (Safety Shoes, Safety
Helmet, Goggles & gloves)
Barricading of work area
Proper placement of tools & equipment
Safety orientation of entire staff prior to start of the job
Identification & communication of job associated hazards to all
concerned at site
Housekeeping during and after work
Use brick carefully PUMA HSE /
Bricks Masnory Work Personnel Injury due to Remove all material and debris material from the site and conduct Civil Staff /
hitting of brick good house keeping. Contractor
Road accident Remove unnecessary barriers.
Tilting of equipment Place material at designated area.
Fall of material due to Ensured proper stacking area to store material.
improper platform Junkyard must be made for waste management.
Ground Surface must be Levelled.
Work on proper platform.
Use of personal protective equipment (Safety Shoes, Safety
Helmet, Goggles & gloves)
Safety orientation of entire staff prior to start of the job
Use dust mask. PUMA HSE /
Plaster work Eye injury / Use safety goggles Civil Staff /
Respiratory problems Use Gloves Contractor
JOB SAFETY ANALYSIS FOR CIVIL
HSEQ-RECS-01
CONSTRUCTION WORKS
Rev.A Dated:25.08.2018
Job Title: Upgrade of Bulk Oil Storage Depot at Daulatpur Project
Page 5 of 6

Injury Due to falling During erection of platform, other activities must be stopped to
objects reduce the risk of accidents.
Collapsing of Platform Use of Safety Harness & other mandatory PPE’S.
structure due untrained Platform must be levelled, guard rail must be provided, proper
& substandard working. working plat form with ladder.
Safety orientation of entire staff prior to start of the job

Proper path to be made prior to movement of equipment. PUMA HSE /


Ceramic Tile Personal injury due to Use dust mask. Civil Staff /
Tripping/falling Use safety goggles Contractor
Eye injury / Use Gloves
Respiratory problems Guard should be provided to Grinders
Barricading of work area
Proper placement of tools & equipment
Safety orientation of entire staff prior to start of the job
Full time availability of Contractor / PUMA Supervisor at site
Housekeeping during and after work

Use dust mask. PUMA HSE /


Painting & Finishing work Eye injury Use safety goggles Civil Staff /
Air Pollution Use Gloves Contractor
Inhalation of paint fumes During erection of platform, other activities must be stopped to
Personal injury/property reduce the risk of accidents.
loss due to fire Use of Safety Harness & other mandatory PPE’S.
Collapsing of Platform Platform must be levelled, guard rail must be provided, proper
structure due untrained working plat form with ladder.
& substandard working. Safety orientation of entire staff prior to start of the job

Door & Window Installation Remove all material and debris material from the site and conduct PUMA HSE /
Work Eye injury good house keeping. Civil Staff /
Air Pollution Remove unnecessary barriers. Contractor
JOB SAFETY ANALYSIS FOR CIVIL
HSEQ-RECS-01
CONSTRUCTION WORKS
Rev.A Dated:25.08.2018
Job Title: Upgrade of Bulk Oil Storage Depot at Daulatpur Project
Page 6 of 6

Inhalation of wood or Place material at designated area.


aluminium dust Ensured proper stacking area to store material.
Personal injury/property Junkyard must be made for waste management.
loss due to fire Ground Surface must be Levelled.
Collapsing of Platform Trained operator must operate the equipment.
structure due untrained Proper inspection of tools.
& substandard working. Use of Safety Harness & other mandatory PPE’S.
Personal injury. Platform must be levelled, guard rail must be provided, proper
Property Loss due to working plat form with ladder.
uninspected tools Safety orientation of entire staff prior to start of the job