Composite Works at PTA Unit for Capacity Expansion of PX & PTA Project
Unit: PX Area: PX 1&2 Location: IOCL Panipat – PTA PLANT - Cooling Water Pipeline Fabrication & Erection
Job Title: JSA done by:
Material handling by Farhana F-15 Crane SN. Name Designation Department
1. Rakesh Mahajan RCM L&T
2. Sandip Patil HSE – Manager L&T
3. Saiyad Riyazali HSE Officer L&T
Job to be Executed By 4. Hari Om Gupta Mech Engg L&T
Department Contractor 5. Kuldeep Singh HSE Advisor Worley
.
JSA Reviewed By (HOD’s Name & Designation) Name Designation
Sl. No. Activities Hazards Recommended Actions /Procedures & Control Compliance Checked By
Measures Status Name of Officer
(Complied/ Not with Sign. date
complied) & time
1. Material handling by Farhana F-15 Crane
Vehicle accident Work permit from the client, with all
Topple of vehicle concurring parties signatures approval must
Striking object be obtained prior to start of work and display
Traffic blockage work permit at site
20 km/h speed limit will be followed while
(Personal Injury / Property coming inside
Damage) Flagman /Banks man deployed with flag
along with vehicle.
Overhead and nearby utilities are identified &
adequate precaution are taken.
Traffic instructions as per the site
requirement are strictly followed.
All drivers to possess valid driving license
with heavy driving permit.
PESO Approved Spark arrester ensured (if
required).
Check for the fitness for vehicle operators /
drivers
Ensured Form-11
Vehicle inspection shall carry out prior to
deploy at site
Crane / Farhana Vehicle accident The area should be levelled and check the
JOB SAFETY ANALYSIS
Composite Works at PTA Unit for Capacity Expansion of PX & PTA Project
Sl. No. Activities Hazards Recommended Actions /Procedures & Control Compliance Checked By
Measures Status Name of Officer
(Complied/ Not with Sign. date
complied) & time
F-15 Crane Striking by overhead/ compaction of the area before starts the job.
positioning for nearby utilities. Give proper supports, so that the level can be
lifting Chances of toppling the maintained.
cranes \ Hydra. Overhead utilities and nearby utilities are
Collision, with other properly identified and cleared before starts
cranes & Vehicles. the work or proper distance shall be
maintained from the same.
(Personal Injury / Property The crane should be positioned so that there
Damage) will enough room for the lift and to avoid
collision hazards.
Lifting & shifting of Fall of material / Material lifting area should be barricade
structural /pipes toppling of vehicle. properly.
by Crane, Farhana Collision of material Unauthorized entry will be strictly prohibited.
F-15 Crane with structure. Used lifting equipment must be certified by
competent person & before starting physical
(Personal Injury / Property inspection should be done by concerning
Damage) supervisor or authorized personal on regular.
Rigger shall be provided to ensure no
personnel enter the load movement area.
As per the load to be lifted radius and angle
of boom is calculated in advance to ensure
load being lifted is with-in the crane / P&C
limit
Edge protection must be ensured.
Failure of load bearing Lifting equipment should be of adequate
part, from structural strength and stability for the load. Stresses
components of the induced at mounting or fixing points must be
crane / Farhana F-15 considered.
Crane itself or an Similarly, every part of a load, anything
accessory fitted to it. attached to it and used in lifting must be of
This may be due to adequate strength
overloading or The structure integrity of the crane should be
degradation of the load maintained; check for any signs of corrosion
bearing part due to Pre-use check by operator should be carried
damage. out
Use (wear) or faults
(corrosion)
Collision / Fall of
material or person
(Personal Injury /
Property Damage)
Rigging of the pipe Mechanical failure, Proper tag / guy rope to be used.
lifitng Failure of slings / D – Used lifting equipment must be certified by
shackles. competent person & before starting physical
JOB SAFETY ANALYSIS
Composite Works at PTA Unit for Capacity Expansion of PX & PTA Project
Sl. No. Activities Hazards Recommended Actions /Procedures & Control Compliance Checked By
Measures Status Name of Officer
(Complied/ Not with Sign. date
complied) & time
Loss of load from inspection should be done by concerning
failure of lifting tackles, supervisor or authorized personal.
incorrect hook fittings, Monthly inspection of colour code shall
slinging procedure provide for lifting tools tackles.
Fall of material / Inspection prior to use shall be done.
person. Lifting tackle-chains, slings, wire ropes,
eyebolts and shackles-should be tested /
(Personal Injury / Property examined daily.
Damage)
Wrong signalling, Ensure qualified / experienced signal man /
Collision / Fall of rigger to be engaged with visible vest, flag.
material or person Only one man gives the signal to operator or
lifting crew.
(Personal Injury / Property Walkie talkie used for communication
Damage)
Use of lifting Tools Failure of lifting tools & All the lifting gears to be 3rd party certified,
& Tackles tackles Form-11(Competent Person)
Fall of material or Should be marked with SWL and tag no &
person colour coded as per client colour code
Equipment shall be daily checked before use
(Personal Injury / Property All damage lifting gears shall be destroyed or
Damage) return to store immediately.
No home-made tackles to be used.
Tandem lifting of Unbalance, All the lifting gears to be 3rd party certified,
the pipe with 2 Shifting of CG, Form-11(Competent Person)
nos. Farhana F-15 Load imbalance Trade verification of the equipment operator
Crane Toppling of the Farhana Crane / P&C should not use in pulling of
F-15 Crane material / pipes.
Striking, slip & trip Work Permit must be obtained before
Collision / Fall of starting the unloading/ lifting work.
material or person Prepare lifting plan for tandem lifting as
consider as critical lift.
(Personal Injury / Property Proper PPE's & barricading should be
Damage) ensuring before starting the work.
Overhead power lines proper distance must
be maintained.
Root / Ground survey shall be done before
lifting the materials
Use tag ropes on each side for avoid over
swinging.
Lifting plan shall be discussed with the
operators
JOB SAFETY ANALYSIS
Composite Works at PTA Unit for Capacity Expansion of PX & PTA Project
Sl. No. Activities Hazards Recommended Actions /Procedures & Control Compliance Checked By
Measures Status Name of Officer
(Complied/ Not with Sign. date
complied) & time
Supervisor / foreman shall monitor the job
continuously
The persons who are holding the tag ropes
shall keep safe distance from the material.
Evacuate the area and rigger shall ensure all
the area while shifting the materials.
Only single signalman shall give the signal for
both Farhana F-15 Crane operators
Conduct toolbox talk prior to start of the
activity in every shift
Fire & Explosion, Regular Gas Monitoring
Property Damage & Provide Area Zone Monitor & multi gas
Personal Injury. detectors
Insulate All Live Valve & Flanges with Fire
Blanket
Insulate OWS Funnel/Chamber
Check & removal Flammable material in
surround area.
Water sprinkling under the booth
Use fire Blankets to avoid sparks to go out
Provided Fire Extinguisher, Fire hoses
Covering material with fire blanket wherever
necessary.
Provide Fire Watcher at Hot work Locations
with Red Jacket
2. Night work at site
Poor Illumination Ensure adequate Illumination level & should
Slips, trips & Falls. be checked on regular basis.
Fatigue
Insects/reptiles Ensure proper illumination arrangements at
work location.
Vehicle parking at
roadside Ensure the working crew shall take rest at
rest shelter only.
(Personal Injury / Ensure to use only designated work access.
Property Damage) Ensure no lone work at night.
Emergency contact no. must be displayed at
strategic locations.
Ensure to use full sleeve dress to avoid insect
stings.
Ensure the vehicle parked at designated
location with wheel stopper.
Ensure valid work Permit for night work.
Ensure proper supervision in Night shift.
JOB SAFETY ANALYSIS
Composite Works at PTA Unit for Capacity Expansion of PX & PTA Project
Sl. No. Activities Hazards Recommended Actions /Procedures & Control Compliance Checked By
Measures Status Name of Officer
(Complied/ Not with Sign. date
complied) & time
Ensure no one work more than 12 hrs
3. Housekeeping
Materials obstruction Ensure the area kept clean
Ergonomic
Secure all the equipment after the work is
Sharp object
completed
Waste material should be disposed at
designated place
Work material must not blocking the road /
emergency access way
Buddy system implementation
Use correct manual lifting method
Eliminate/secure any sharp edges
Wear proper hand gloves
HOD of Concerned
Note:
1. To make JSA process effective, the defined job shall be broken down into sequential steps. Actions / activities for each steps
shall be logical & linked with previous & forward action steps. All possible hazards associated with each job step shall be
JOB SAFETY ANALYSIS
Composite Works at PTA Unit for Capacity Expansion of PX & PTA Project
deliberated among team members and recorded carefully. JSA recommendations / control measures for each hazard / job step
should be validated by team members & recorded in the Part-A of JSA sheet. Use additional JSA sheets as per requirements.
1. Review of JSA shall be done by HOD of respective
Operation Department and HOD of Concerned Maintenance Department. After review, respective HOD to put his signature with
name & date.