JOB SAFETY ANALYSIS SHEET

JSA Team: Approved by: Date: SPECIFIC ACTIVITY BEING ASSESSED:


MIH,MYM (ECPL) 16.05.2008 Disassembling, Assembling and Extension of
MN, MDA, MIK (DEL) Crane Boom

PPE: Safety Helmet, safety Shoes, Gloves, Safety Goggle, Safety Harness Job Location: E & P Yard

ACTIVITY POTENTIAL LIKELY CAUSES CONSEQUENCES CONTROL MEASURE


HAZARD
(What I am going (What can go (What can cause it to go (What will happen if the (What can be done to prevent it from going wrong?)
to do?) wrong?) wrong?) Hazard is released?)
Inspection of Falling of load Sinking of ground Serious personnel injury - Proper compaction of ground that could withstand the
ground Crane collapse Damage to property Max load of boom.
Inspection of Falling Failure of Crane Serious injuries / Fatality - Crane, Slings, Shackles, belts and all lifting
Crane, Lifting load/Falling Failure of lifting gears Property damage tackles shall be 3rd Party certified.
gears object - Crane operator to be valid 3rd party certified.
Slinging to Falling object Under rated lifting gears Personnel injury / - Slinging of the boom to be verified by visual
Boom Yielding of lifting Uncertified lifting gears Fatality inspection.
tackles Inappropriate sling fixing Property damage - Only Trained & authorized personnel shall work.
Falling personnel Improper fall protection - All personnel working at height shall be
protected against falling i.e. shall use full body
harness.
- Certified / inspected lifting gears shall be used
- Safety harness shall be used while working at
boom for slinging, assembling and de-
assembling.

Falling of load / - Failure of Crane Serious injuries / Fatality - Safety Talk shall be conducted to explain JSA
Lifting & Unbalancing of - Failure of lifting Property damage with all participants before lifting
placing of crane point of hook - Only authorized personnel should perform the
boom on Falling of - Improper lifting task.
ground personnel - Inadequate Placing - Designated signalman wearing high visibility
of CRANE jacket to be allowed to give signals to the crane
JOB SAFETY ANALYSIS SHEET
- High wind velocity operator.
- Improper fall - Crane outriggers shall be extended fully.
protection - Ground shall have hard surface & Outrigger pads
to be used.
- Area around the work place shall be barricaded to
stop unauthorized entry.
- No body should stay under suspended load or
move through the operating radius of boom.
- The weight of the load shall be taken smoothly
without allowing it to jerk.
- The entire activity shall be performed under the
supervision of a qualified Supervisor.
- Use at least two tag lines to control swinging of
lifted object.

De-Assembling Falling of load / - Failure of Crane Serious injuries / Fatality - Only authorized personnel should perform the
& Assembling Unbalancing of - Failure of lifting Property damage task.
of boom. crane point of hook - Designated signalman wearing high visibility
Falling of - Improper lifting jacket to be allowed to give signals to the crane
personnel - Inadequate Placing operator.
of CRANE - Crane outriggers shall be extended fully.
- High wind velocity - Ground shall have hard surface & Outrigger pads
- Improper fall to be used.
protection - Area around the work place shall be barricaded to
stop unauthorized entry.
- No body should stay under suspended load or
move through the operating radius of boom.
- The weight of the load shall be taken smoothly
without allowing it to jerk.
- Work shall not be performed in case of high wind
velocity i.e. 25km/hr
- Safety harness shall be used while working at
boom for slinging, assembling and de-
assembling.
- Proper stand shall be used for access to boom for
JOB SAFETY ANALYSIS SHEET
work.
- Dismantled boom will be placed on boom stand
properly.
- House keeping will be done before and after the
completion of job.

Note:

1) Un-concerned personnel should stay at least 10 Ft. away from lifting area.