You are on page 1of 26

Engineering, Procurement and Construction

(EPC) for New Nassiriya Depot Project

DATE: 2023
Job Safety Analysis JSA No:
& (Work Method Statement)
PRINCIPAL CONTRACTOR: CPP CONTRACTOR NAME: CPP
PROJECT: EPC for New Nasiriya Depot Project
LOCATION: FIBRICATION WORKSHOP
1
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

THIS JSA IS TO BE REVIEWED ON:


JOB DESCRIPTION: PAINTING , COATING AND SANDBLASTING.
PLANNED HIGH RISK CONSTRUCTION ACTIVITY:
Work at Heights Work on Roof Entering Excavation Using a Confined Space
Using a Hazardous Substance Work Over Water Bodily Injury

2
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

EMERGENCY ACTION:
In the event of injury is a member of the work team First Aid Qualified? R YES NO If yes, their Name? ALI MUDHAFER
Point where an injured person may receive treatment: MINOR INJURY: at the work place SERIOUS INJURY:
JSA STATEMENT DEVELOPED BY: REVIEWED BY THE FOLLOWING PERSONNEL: Mei Hong

3
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Certifica
No Name Signature Position No Name Signature Position Date.
te No.
1 ALI MUDHAFER HSE 1
2 SUN MANAGER 2
3 3

4
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Approved by: Position: JSA Review Date:

P.P.E REQUIREMENTS EQUIPMENT & TOOLS FOR JOB TAGGING & SIGNS PERMITS &
INSTRUCTION
Use Use Use Use

5
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Sandblasting Men Working MSDSs


Safety Harness Hearing Protection R Machine
R Fire Blanket
Above (Manufacturers Safety
Data Sheet)

Static Line BA Hand Tools R Excavator Barrier Mesh Instruction Manuals

Steel Capped Boots Airline Shovel Winch Flagging Procedures R

6
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Paint Spray Extension


Hard Hat Dust mask R Machine
R Leads
Personal Locks Work Instructions R
R
Confined Space Personal Danger
Face Mask R Harness
Compactor Power Source
Tags
R Hot Work Permit
Clear Safety
Glasses
R Gloves – PVC R Drill Crane Out of Service Tags Cold Work Permit R

7
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Gloves – Hyflex
Monologues
(Nitrile)
Grinder MEWP Information Tags R Excavation Permit

Gloves – Leather Confined Space


Face Shield Scaffold Fans Warning Signs R
R Riggers Permit
Fire Vacuum
Sun Screen
Extinguisher
R Cleaner

8
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

9
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

HAZARD PROMPT – “check ”. Identify the job hazards and assess the RISK personnel may be exposed to before safeguards are implemented:

10
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

N/A N/A N/A N/A N/A N/A


RLow RLow RLow RLow RLow N/A RLow
Electrical Me Vehicles Me Pressure Me Weather Me Radiation Me Heat RLow Biological Me
d d d d d Med d
Hig Hig Hig Hig Hig High Hig
h h h h h h

11
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

N/A N/A N/A N/A N/A N/A N/A


RLow RLow RLow RLow RLow RLow RLow
Dehydration
Me Me Me Me Rotating Me Me Me
Chemical Height Access Bacteria Hot Entrapment
Equipment d
d d d d Work/Sun d d
Hig Hig Hig Hig Hig Hig Hig
h h h h h h h

12
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

N/A N/A N/A N/A N/A N/A


N/A
RLow RLow RLow Lo Low RLow RLow
w Moving Hot / Cold
Tools Me Depth Me Vibration Me Dust RMed Me Lighting Me
d d d RMed Equipment Objects
d d
Hig
Hig Hig Hig Hig h Hig Hig
h h h h h h

13
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

N/A N/A N/A N/A


N/A N/A N/A
RLow Lo RLow RLow RLow
Low
w Lifting
RLow Overhead Manual
Gases Me Weight RMed Noise Slip / Trip Me Me Med
d RMed d
Equipment Me Hazards
d
Handling
Hig d Hig
Hig h Hig Hig High Hig h
h h h h

14
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

RISK SCORE CALCULATOR


Use The Risk Score Calculator To Determine The Level Of Risk Of Each Hazard
What would the What is the LIKELIHOOD of an occurrence? Hierarchy of Controls
SEVERITY Almost Can the hazard be Eliminated or removed
Of an occurrence be? Very Likely Likely Unlikely Very Unlikely
Certain from the work place?

15
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Disaster High 25 High 20 High 15 Medium 10 Medium 5


Can the product or process be substituted for
Multiple Fatalities a less hazardous alternative?
Very Serious High 20 High 16 High 12 Medium 8 Low 4
Can the hazard be engineered away with
Major Illness or Injury, disability guards or barriers?
Serious Can Administration Controls be adopted
Serious but non-permanent injury or ill health High 15 High 12 Medium 9 Medium 6 Low 3 i.e. procedures, job rotation etc
Work days lost
Substantial Can Personal Protective Equipment &
Medical attention needed. Medium10 Medium 8 Medium 6 Low 4 Low 2 Clothing be worn to safe guard against
No work restrictions. hazards?
16
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Minor Medium 5 Medium 4 Low 3 Low 2 Low 1


Minor cuts & bruises or sickness

Hazard / Risk Work Method Statement New risk


Job Step For score
No. Exposure Risk
After
Action
What are the hazards of each job Score Control of Hazard Exposures controls
By
What you do, NOT how you do it
step? applied
What hazard controls will be used?
17
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Who will check the effectiveness of the controls?


What checks will be undertaken? E.g. (Inspection &
ongoing monitoring)
1 Preparing Materials for start the work Back injury, ankle sprain and muscle 6 - Change the object – for example, repack a heavy load 2 Site
pain (musculoskeletal disorder) into smaller, more manageable parcels superviso
- Use mechanical aids- like wheelbarrows, trolleys, r, work
conveyor belts, cranes or forklifts.
leader
- Change the nature of work- offer frequent breaks or
multitask.
18
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

- work shift/ work rotation


- Wear proper PPE
- Working area must be free from the obstacles
Proper PPEs includes proper masks , plastic layer
Breathing problems on the ground to prevent the spilling and fire 5 HSE
2 Coating and painting process Spilling oil and painting materials 8
Flammable materials extinguishers and skilled dealing with the
materials using gloves and etc…

19
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Secure the Environment. Eliminate tripping and falling


hazards. ...
Check the Blasting Equipment. Look for cracks and
WORKER
other damage. ... 2
3 Blasting High levels of dust and noise 6 Ensure Protective Gear Is Available. Give your
S
blasting workers the proper protective garments. ...
Use Proper Clean-up Procedures

20
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

IF IT’S NOT SAFE – DON’T DO IT THAT WAY!

21
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

Job Safety Analysis DATE: 2023

& JSA No:


COMPANY
(Work Method Statement)

22
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

SIGN ON SHEET
Name Signature Date Name Signature
ALI MUDHAFER 23
Sun 23

23
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

24
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

25
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot Project

IF IT’S NOT SAFE – DON’T DO IT THAT WAY!