Professional Documents
Culture Documents
Daftar
Peralatan Tenaga Kerja Bahan - Bahan
No. Uraian Jumlah No. Jabatan Jumlah No. Bahan
Catatan :
Menyetujui : Diperiksa :
Satker PIPS Gerbangkertosusilo Konsultan Supervisi
PENGAWAS LAPANGAN PT. WAHANA ADYA
HALAMAN:
Daftar
Bahan - Bahan
Volume
22 Bottom
44 Middle
Dibuat oleh :
Kontraktor
WASKITA KARYA
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
6 6 6
Signature
Inspection Result
4 4 4
5 5 5
6 6 6
Signature
Inspection Result
NIPPON KOEI CO.,LTD., PROJECT : : Contraction/Repair of sabo dam for rehabilitation of mt. kelud urgent sabo project
CONSULTANT :
AND ASSOCIATION CONTRACT : Package 5
LOCATION :
WASKITA NINDYA
CONTRACTOR : DATE :
Joint Operation (JO)
WEATHER : Bright. Cloudy. Rainy
ACTIVITY
KONSULTAN : WAHANA ADYA KONSULTAN PROYEK : Construction/Repair of Sabo Dam for Rehabilitation
ATTENDANTS:
3. STATION :
STATEMENT:
CONSULTANT : NIPPON KOEI CO., LTD., PROJECT : Construction/Repair of Sabo Dam for Rehabilitation
ATTENDANTS:
3. STATION :
4. ELEVATION : El.+516.057
STATEMENT:
LOCATION :
WASKITA NINDYA
CONTRACTOR : WEEKS : DATE. : -
Joint Operation (JO)
DATE : SHEETS :
NUMBERS EQUIPMENT
No. KINDS
IN USE KIND/TYPE NUMBER
I Material
II Equipment
LOCATION :
MAN POWER
No. KIND OF USE MATERIAL REMAKS
POSITION PERSONS
LOCATION :
WASKITA NINDYA
CONTRACTOR : MONTHS : DATE. : -
Joint Operation (JO)
DATE : SHEETS :
NUMBERS EQUIPMENT
No. KINDS
IN USE KIND/TYPE NUMBER
I Material
II Equipment
LOCATION :
MAN POWER
No. KIND OF USE MATERIAL REMAKS
POSITION PERSONS
Yes No N/A
1. Water
Free from impurities
2. Sand
a) Washed before use
b) Free from organic matters and other contamination
c) Sieved by 5 mm sieve before use
3. Stone
a) Free from crack/seam
b) Appropiate max. stone size (30 cm and 2/3 of wall thickness)
c) Angular stone
4. Placing of Masonry
a) Proper cement/sand mix proportion for joint mortar
b) Moistened stone before use
c) Hitting and consolidation of stone by steel hammer
d) Width of joints in face stone not exceeding 3 cm
5. Pointing
a) Chipped joint mortar to a depth of 3 cm
b) Proper cement/sand mix proportion ( 1 : 2 )
c) Cleaned surface of joint mortar using wire brush
d) Sufficient filling of surface joint mortar
6. Plastering
a) The depth of plastering is proper with technical spesification
b) Proper cement/sand mix proportion ( 1 : 3 )
c) Width of list plastering is 15 cm
8. Remarks
…………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………….
Yes No N/A
b) Sand
c) Cement
d) Watering
4. Equipment :
a) Concrete Mixer
c) Water pump
5. Man Power
a) Foreman
b) Skilled Labour
c) Common Labour
6. Application Assits
a) Roof gutter
b) Protector ratch
8. Remarks
…………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………….
CONSULTANT : NIPPON KOEI CO., LTD., PROJECT : Constraction/Repair of Sabo Dam for Rehabilitation
Yes No N/A
1. Concrete Test
a) Slump within tolerance
b) Time Limitation (1.5 hrs. from mixing plant)
c) Air contents within limits ( 6% ± 2% )
d) Concrete temperature (below 320C)
e) Cylinders/cubes taken ( min. 3 nos.)
2. Concrete Placement
a) Means of placing
- Crane & bucket - Chute
- Pumping - Conveyor belt
- Buggy - Other
c) Concrete vibration
- Backup vibrator on site
- No horizontal movement on concrete
- Sufficient vibrating for consolidation
- Vibrate around rebar and embedments
- Penetrate into previous layer by 15 cm
- Vibrating in one position for no more than 15 sec.
d) Finish
- Brooming - Trowel
- Rough - Float finish
e) Concrete placed :……………………………………………………………………………… m3
f) Minimum time before removal of form : …….……….……………………………………… days
g) Minimum time of curing : ………………………..…………………………………………… days
3. Remarks
…………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………….
Yes No N/A
1. Formwork Preparation
c) Forms clean
3. Remarks
…………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………….
STATUS
No. Description Remarks Finished Targets
Approved Repaired Reject
ACTIVITY
CONSULTANT : NIPPON KOEI CO.,LTD., AND ASSOCIATION KELUD URGENT SABO PROJECT
CONTRACT : Package 5 ,
LOCATION :