Professional Documents
Culture Documents
SHEET
40,000.00 40,000.00
20,000.00 20,000.00
14.02 7,171.23
85.28 2,548.17
3,157.59 17,050.99
10,372.34 41,593.08
7,316.38 109,745.70
9,936.00 24,840.00
9,623.46 158,017.21
246.96 6,816.10
695.42 15,021.07
143.15 102,509.72
25.64 78,689.16
2,684.11 823,753.36
3,511.76 1,077,759.14
156.77 400,939.28
156.77 240,563.57
13,940.65 713,064.25
107.22 219,372.12
423.52 216,630.48
5,424.31 5,424.31
4,261,508.94
553,996.16
4,875,505.10
5,003,350.37
4,261,508.94
4,815,505.10
SCHEDULE OF QUANTITY AND ABSTRACT OF COST
Project: Constrcution of Academic Building for Bal Ma.Vi.
Job Title: ELECTRICAL WORK Fy 75-76
Location: Banganga Municipality-1, Bairiya
The rates quoted hereunder are inclusive of
1. Supplying the items along with accessories to the site.
2. Fixing them in position as per specifician, drawing and approval of electrical site incharge.
3. Testing ,Comissioning &
4. Maintenance upto the guaranted period as per agreement Fiscal Year :- 074/075
SN Particulars QTY TotalUnit Rate Amount
A. LUMINAIRES ( FIXTURES) G.F. 1st 2nd
accessories ,screws,gripes,pvc tape, choke, starter,
Tube, bulbs, holder, flexible wire etc all complete.
Sub-Total 382.20
C Construction of Building
Footings
F5 1500X1500 12 1.5 1.5 1.75 47.25
F4 1800X1800 4 1.8 1.8 1.75 22.68
F3 2100X2100 14 2.1 2.1 1.75 108.04
F2 2280X2280 4 2.28 2.28 1.75 36.38
F1 2600X2600 4 2.6 2.6 1.75 47.32
Ramp
For boundary wall(retaining) 2 9.971 0.28 0.45 2.51
Total 291.79
Sub-Total 175.08
Supplying and laying dry stone soling in
foundation in proper line and level, all complete
5 as per specifications, design and instruction of
the Engineer.
Footings
F5 1500X1500 12 1.5 1.5 0.15 4.05
F4 1800X1800 4 1.8 1.8 0.15 1.94
F3 2100X2100 14 2.1 2.1 0.15 9.26
F2 2280X2280 4 2.28 2.28 0.15 3.11
F1 2600X2600 4 2.6 2.6 0.15 4.05
38
For Lower Tie beam 9"X9"
Along Grid 1-1 1 2 0.38 0.15 0.11
Along Grid 2-2 1 18 0.38 0.15 1.02
Along Grid 3-3 1 12.18 0.38 0.15 0.69
Along Grid 4-4 1 0.9 0.38 0.15 0.05
Along Grid 5-5 1 12.9 0.38 0.15 0.73
Along Grid A-A and J-J 2 4.1 0.38 0.15 0.46
Along Grid B-B, D-D, G-G and I-I 4 0.46 0.38 0.15 0.10
Along Grid C-C and H-H 2 3 0.38 0.15 0.34
Along Grid E-E and GRID F-F 2 3.65 0.38 0.15 0.41
Ramp
For boundary wall(retaining) 2 9.971 0.28 0.15 0.84
Inclined portion 2 6.99 1.19 0.15 2.50
Levelled Platform 2 1.78 1.19 0.15 0.64
Sub-Total 73.68
P.C.C. ( Plain cement concrete ) with cement:
sand:aggregate -1:3:6 including machine mixing,
6 curing, laying, finishing etc. all complete as per
specification, design and drawings and instruction
of site incharge. (M10)
Footings
F5 1500X1500 12 1.5 1.5 0.1 2.70
F4 1800X1800 4 1.8 1.8 0.1 1.30
F3 2100X2100 14 2.1 2.1 0.1 6.17
F2 2280X2280 4 2.28 2.28 0.1 2.08
F1 2600X2600 4 2.6 2.6 0.1 2.70
For Lower Tie beam 9"X9"
Along Grid 1-1 1 2 0.38 0.075 0.06
Along Grid 2-2 1 18 0.38 0.075 0.51
Along Grid 3-3 1 12.18 0.38 0.075 0.35
Along Grid 4-4 1 0.9 0.38 0.075 0.03
Along Grid 5-5 1 12.9 0.38 0.075 0.37
Along Grid A-A and J-J 2 4.1 0.38 0.075 0.23
Along Grid B-B, D-D, G-G and I-I 4 0.46 0.38 0.075 0.05
Along Grid C-C and H-H 2 3 0.38 0.075 0.17
Along Grid E-E and GRID F-F 2 3.65 0.38 0.075 0.21
Ramp
Base fo Ramp (retaining wall) 2 9.971 0.28 0.075 0.42
Sub-Total 17.35
Ramp surface
Inclined portion 2 6.99 1.19 0.075 1.25
Levelled Platform 2 1.78 1.19 0.075 0.32
Sub-Total 23.26
RCC Works
P.C.C. ( Plain cement concrete ) for R.C.C with
cement: sand:aggregate -1:1.5:3 including
8 machine mixing, curing, laying, finishing etc. all
complete as per specification, design and
drawings and instruction of site incharge. (M20)
Footings
F5 1500X1500 12 0.62 7.43
F4 1800X1800 4 0.87 3.50
F3 2100X2100 14 1.18 16.46
F2 2280X2280 4 1.38 5.51
F1 2600X2600 4 2.06 8.24
Columns
Upto Plinth Level (+000 lvl)
Column 350X350 38 0.35 0.35 1.15 5.35
Above Plinth
E5,F5,E4,F4 4 0.35 0.35 6.4 3.14
All Except E5,F5,E4,F4 34 0.35 0.35 3.2 13.33
Lintel Band
Ground Floor
Along Grid 3-3 1 28.35 0.23 0.1 0.65
Along Grid 5-5 1 28.35 0.23 0.1 0.65
Along Grid A-A and J-J 2 8.6 0.23 0.1 0.40
Along Grid C-C and H-H 2 6.6 0.115 0.1 0.15
Along Grid E-E and GRID F-F 2 8.25 0.115 0.1 0.19
Stair cover walls
Grid 5-5 and Grid 4-4 2 3.15 0.23 0.1 0.14
Grid E-E and Grid F-F 2 3.3 0.23 0.1 0.15
Concrete bench
Bench 6 3.15 0.4 0.1 0.76
bench support 12 0.1 0.1 0.525 0.06
Bench back support (railing) (125X100) 6 3.15 0.1 0.125 0.24
Total 151.52
Straightening,cleaning,cutting,fabricating,bending
,placing as per design and details for RCC
elements including supplying and binding the
Torsteel reinforcement with annealed wire for
tying the reinforcement for all sizes of bars at
9 22171.99
each junction including all waste and cut
pieces,provision for spacers chairs,providing and
placing cement mortar(1:1) cover blocks to keep
the bars in the intended position at all level, all
complete as per drawing,specification and
instruction of the Engineer.
Sub-Total 22171.99
Footings
F5 1500X1500 12 1.5 4 0.2 14.40
F4 1800X1800 4 1.8 4 0.2 5.76
F3 2100X2100 14 2.1 4 0.2 23.52
F2 2280X2280 4 2.28 4 0.2 7.30
F1 2600X2600 4 2.6 4 0.2 8.32
Columns
Upto Plinth Level (+000 lvl)
Column 350X350 38 0.35 4 1.15 61.18
Columns With two Beams (Up to Plinth) 16 0.23 0.35 -2 -2.58
Columns With Three Beams (Up to Plinth) 10 0.23 0.35 -3 -2.42
Column with Four Beams (Up to Plinth) 6 0.23 0.35 -4 -1.93
Ground floor columns 38 0.35 4 3.08 163.59
stair cover 4 0.35 4 2.78 15.57
Deductions for ground floor
Columns With two Beams (Ground Floor) 6 0.23 0.275 -2 -0.76
Columns With Three Beams (Ground Floor) 17 0.23 0.275 -3 -3.23
Column with Four Beams (Ground Floor) 14 0.23 0.275 -4 -3.54
Lintel band
Ground Floor sides
Along Grid 3-3 1 28.35 2 0.1 5.67
Along Grid 5-5 1 28.35 2 0.1 5.67
Along Grid A-A and J-J 2 8.6 2 0.1 3.44
Along Grid C-C and H-H 2 6.6 2 0.1 2.64
Along Grid E-E and GRID F-F 2 8.25 2 0.1 3.30
Total 1017.33
Up to Plinth Level
Along Grid 1-1 1 3.15 0.23 1.02 0.74
Along Grid 2-2 1 28.35 0.23 1.02 6.65
Along Grid 3-3 1 28.35 0.23 1.02 6.65
Along Grid 4-4 1 3.15 0.23 1.02 0.74
Along Grid 5-5 1 28.35 0.23 1.02 6.65
Along Grid A-A and J-J 2 8.6 0.23 1.02 4.04
Along Grid B-B, D-D, G-G and I-I 4 2 0.23 1.02 1.88
Along Grid C-C and H-H 2 8.6 0.23 1.02 4.04
Along Grid E-E and GRID F-F 2 10.25 0.23 1.02 4.81
subtotal 36.19
Ground Floor
Along Grid 3-3 1 25.2 0.23 2.8 16.23
Along Grid 5-5 1 28.35 0.23 2.8 18.26
Along Grid A-A and J-J 2 6.6 0.23 2.8 8.50
Deductions
Doors D1 -8 1.05 0.23 2.1 -4.06
Windows W1 -12 1.82 0.23 1.52 -7.64
Windows W2 -1 1.82 0.23 1.52 -0.64
Sub-Total 38.38
Ground Floor
Along Grid C-C,E-E,F-F and H-H 4 6.6 0.115 2.8 8.50
Total 8.50
Providing and laying 12.5 mm thick cement sand
plaster (1:4) in external and internal surfaces in
wall, columns, skirting, facias, cornices etc. in
perfect line, level and plumb, grooving in plaster
13 wherever shown in drawings including chiselling,
raking out joints, cleaning, soaking, necessary
scaffolding, curing etc, all complete as per design
drawing, specification and instruction of
Engineer.
A Outer Plaster
Below plinth including riser of steps 1 79 0.45 35.55
Ground floor(3200 lvl) 1 75.5 3.2 241.60
Deductions
Window W1 -12 1.82 1.52 -33.20
W2 -1 1.82 1.52 -2.77
D1 -8 1.05 2.1 -17.64
Top floor (Staircase Cover)
1 12.9 2.8 36.12
D1 -1 1.05 2.1 -2.21
Sub-Total 257.46
B Internal Plaster
Ground Floor
Classroom 1 and Classroom 4
Grid 5-5 and Grid 3-3 4 7.123 2.8 79.78
Grid A-A and Grid C-C , GRID J-J & H-H 4 7.31 2.75 80.41
Deduction
Windows W1 -8 1.82 1.52 -22.13
D1 -4 1.05 2.1 -8.82
Classroom 2 and Classroom 3
Grid 5-5 and Grid 3-3 4 7.24 2.8 81.09
Grid E-E and GRID F-F 2 7.31 2.75 40.21
Deduction
Windows W1 -4 1.82 1.52 -11.07
D1 -4 1.05 2.1 -8.82
Column Grid(2-2) 10 0.35 4 2.8 39.20
Column Grid(1-1)) 2 0.35 4 2.8 7.84
Raised Level
Classroom 1and 4 2 6.88 7.07 0.225 21.89
Classroom 2 and 3 2 7 7.07 0.225 22.27
Varandah 2 31.85 2 0.225 28.67
staircase room 1 9.3 3.15 0.225 6.59
Deductions
Ramp
Inclined portion 2 6.99 1.19 0.23 3.75
Levelled Platform 2 1.78 1.19 0.23 0.95
Subtotal 84.12
Sub-Total 332.60
Sub-Total 704.97
Ground Floor
W1 75X100 section 12 11.24 0.075 0.1 1.01
W2 75 X 100 section 1 11.24 0.075 0.1 0.08
D1 75X100 section 8 5.25 0.075 0.1 0.32
Top Floor
D1 75X100 section 1 5.25 0.075 0.1 0.04
Sub-Total 1.45
NO.
D1 8 0.924 2.063 15.25
Sub-Total 15.25
Ground Floor
W1 (38X75) 48 0.36 1.394 24.09
W2 (38X75) 4 0.36 1.394 2.01
Sub-Total 26.10
Ramp
Vertical post @ 1.5 m c/c 50 mm 7 1.05 7.35
Horizontal Handrail 50 mm 1 10.035 10.04
Horizontal Handrail 25 mm 2 9.685 19.37
Sub-Total 36.76
Staircase Railing
Vertical post @ 1.5 m c/c 50 mm 12 1.05 12.60
Horizontal Handrail 50 mm 1 6.68 6.68
Horizontal Handrail 25 mm 2 11.72 23.44
Sub-Total 42.72
Total 79.48
25 40 mm MS pipe trust for foor covering no length total len unit wt total wt
along x-dir 2 4.85 9.7 3.56 34.53
along y-dir 3 5 15 3.56 53.40
Total wt 87.93
Unit Remarks
m2
m3
m3
m3
m3
m3
m3
kg
Kg
sq.m
cum
cum
cum
sq.m
cum
sq.m
sqm
sq.m
sq.m
cum
sq.m
sq.m
kg
sqm
RM
RM
sqm
kg
S.No. Description Number Length Number Diameter Weight
1 Footings
F1 4 2.65 34 12 320.35
F2 4 2.33 30 12 248.53
F3 14 2.15 28 12 749.15
F4 4 1.85 24 12 157.86
F5 12 1.55 20 12 330.66
2 Column
Up to Ground Roof
A2, A3, B2, C2, D2, E1, F1, G2, H2,
12 7.52 4 20 891.73
I2, J2, J3
12 6.32 4 20 749.51
E4, F4, E5 3 7.52 4 20 222.93
3 6.32 4 20 187.37
E2, F2, B3, C3, D3, E3, F3, G3, H3, 17 7.52 4 20 1263.28
I3, A4, C4, H4, J4, B5, H5, I5
17 6.08 4 16 653.76
A5, C5, J5 3 6.32 4 20 187.37
3 7.04 4 16 133.57
D5, G5 2 7.04 4 16 89.05
2 6.08 4 16 76.91
F5 1 6.62 4 25 102.22
1 7.52 2 20 37.15
1 8.12 2 25 62.68
Up to First Roof
E4, F4, E5 3 2.44 4 20 72.24
3 1.52 4 20 45.15
F5 1 1.52 4 25 23.51
1 2.44 2 20 12.04
1 2.44 2 25 18.81
Lateral Ties
Main Ring 38 1.28 49 10 1471.2
Pop Ring 38 0.92 49 8 676.75
3 Beam
Foundation Beam
Grid 5-5,3-3 and 2-2 3 34.75 4 12 370.66
Grid 4-4 and 1-1 2 4.59 4 12 32.64
Grid A-A,C-C,H-H and J-J 4 10.74 4 12 152.74
Grid B-B, D-D,G-G and I-I 4 3.44 4 12 48.92
Grid E-E and F-F 2 13.46 4 12 95.71
Stirrups
Grid 5-5,3-3 and 2-2 3 0.88 213 8 222.15
Grid 4-4 and 1-1 2 0.88 26 8 18.07
Grid A-A,C-C,H-H and J-J 4 0.88 67 8 93.17
Grid B-B, D-D,G-G and I-I 4 0.88 19 8 26.42
Grid E-E and F-F 2 0.88 81 8 56.32
Plinth Beam
Grid 5-5,3-3 and 2-2 3 34.75 4 12 370.66
Grid 4-4 and 1-1 2 4.59 4 12 32.64
Grid A-A,C-C,H-H and J-J 4 10.74 4 12 152.74
Grid B-B, D-D,G-G and I-I 4 3.44 4 12 48.92
Grid E-E and F-F 2 13.46 4 12 95.71
Stirrups
Grid 5-5,3-3 and 2-2 3 1.02 281 8 339.69
Grid 4-4 and 1-1 2 1.02 33 8 26.59
Grid A-A,C-C,H-H and J-J 4 1.02 94 8 151.51
Grid B-B, D-D,G-G and I-I 4 1.02 25 8 40.29
Grid E-E and F-F 2 1.02 113 8 91.06
First Floor Beam
Grid 5-5,3-3,4-4 and 2-2 4 34.75 4 12 494.22
Grid 1-1 1 5.07 6 16 48.07
Grid 2-2,3-3,4-4 and 5-5 4 35.95 5 16 1136.19
Grid A-A,C-C,H-H and J-J 4 11.22 6 16 425.52
Grid B-B, D-D,G-G and I-I 4 11.22 6 16 425.52
Grid E-E and F-F 2 14.18 6 16 268.89
Stirrups
Grid 5-5,3-3,4-4 and 2-2 4 1.22 281 8 541.74
Grid 1-1 1 1.22 33 8 15.9
Grid A-A,C-C,H-H and J-J 4 1.32 94 8 196.07
Grid B-B, D-D,G-G and I-I 4 1.32 94 8 196.07
Grid E-E and F-F 2 1.32 113 8 117.85
Extra Bar
First Floor Beam
Grid 2-2 1 1.245 2 12 2.21
Grid 3-3 1 1.245 4 12 4.42
Mid Extra 1 2.1 2 12 3.73
Grid 4-4 1 1.245 2 12 2.21
Mid Extra 1 2.1 4 12 7.46
Grid 5-5 1 1.245 4 12 4.42
Mid Extra 1 2.1 2 12 3.73
Grid A-A,C-C,H-H and J-J 4 3.9825 2 12 28.32
Mid Extra 4 2.175 1 12 7.73
Another Edge 4 1.5075 1 16 9.52
Grid B-B, D-D,G-G and I-I 4 3.9825 2 12 28.32
Another Edge 4 1.5075 1 16 9.52
Grid E-E and F-F 2 2.72 2 12 9.67
Mid Extra 2 2.175 1 12 3.86
Another Edge 2 1.2675 1 12 2.25
4 Slab
First Floor Slab
Along X-Axis
Between Grid 5-5 and 4-4
Edge bar 5 15.01 4 10 185.3
Mid Bar 14 17.13 2 10 296.07
Top Bar 14 2.1 2 10 36.29
Edge bar 7 15.01 4 10 259.43
Between Grid 4-4 and 3-3
Edge bar 7 33.17 2 10 286.65
Mid Bar 10 35.95 2 10 443.82
Top Bar 10 8.4 2 10 103.7
Edge bar 7 33.17 2 10 286.65
Between Grid 3-3 and 2-2 15 33.17 2 10 614.25
Between Grid 1-1 and 2-2 12 5.17 2 10 76.59
Cantilever 5 33.17 4 10 409.5
Along Y-Axis
Between Grid A-A to B-B
Edge bar 4 11.32 2 10 55.9
Mid Bar 12 16.925 1 10 125.37
Top Bar 7 2.19 1 10 9.46
Edge bar 8 11.32 2 10 111.8
Between Grid B-B and C-C
Edge bar 8 11.32 2 10 111.8
Mid Bar 10 16.925 1 10 104.47
Top Bar 6 2.19 1 10 8.11
Edge bar 8 11.32 2 10 111.8
Between Grid C-C and D-D
Edge bar 8 11.32 2 10 111.8
Mid Bar 10 16.925 1 10 104.47
Top Bar 6 2.19 1 10 8.11
Edge bar 8 11.32 2 10 111.8
Between Grid D-D and E-E
Edge bar 8 11.32 2 10 111.8
Mid Bar 10 16.925 1 10 104.47
Top Bar 6 2.19 1 10 8.11
Edge bar 8 11.32 2 10 111.8
Between Grid F-F and G-G
Edge bar 8 11.32 2 10 111.8
Mid Bar 10 16.925 1 10 104.47
Top Bar 6 2.19 1 10 8.11
Edge bar 8 11.32 2 10 111.8
Between Grid G-G and H-H
Edge bar 8 11.32 2 10 111.8
Mid Bar 10 16.925 1 10 104.47
Top Bar 6 2.19 1 10 8.11
Edge bar 8 11.32 2 10 111.8
Between Grid H-H and I-I
Edge bar 8 11.32 2 10 111.8
Mid Bar 10 16.925 1 10 104.47
Top Bar 6 2.19 1 10 8.11
Edge bar 8 11.32 2 10 111.8
Between Grid I-I and J-J
Edge bar 8 11.32 2 10 111.8
Mid Bar 10 16.925 1 10 104.47
Top Bar 6 2.19 1 10 8.11
Edge bar 8 11.32 2 10 111.8
Between Grid E-E and F-F 22 8.94 2 10 242.81
Cantilever 5 11.25 4 10 138.88
5 Staircase
Ground Floor
Main Bar 10 8.804 1 12 78.25
Extra Bar 10 1.798 1 12 15.98
10 4.44 1 12 39.46
Distribution Bar 151 1.625 1 8 96.93
Main Bar 10 8.368 1 12 74.38
Extra Bar 10 1.798 1 12 15.98
10 4.44 1 12 39.46
Distribution Bar 147 1.625 1 8 94.37
Nosing Bar 19 1.625 1 10 19.05
Nosing Chair 76 0.768 1 8 23.05
6 Band
Ground Floor
Lintel Band
Along Grid 3-3 1 28.35 2 8 22.4
Along Grid 5-5 1 28.35 2 8 22.4
Along Grid A-A and J-J 2 8.6 2 8 13.59
Along Grid C-C and H-H 2 8.6 2 8 13.59
Along Grid E-E and GRID F-F 2 10.25 2 8 16.19
Stair cover walls
Grid 5-5 and Grid 4-4 2 3.15 2 8 4.97
Grid E-E and Grid F-F 2 3.3 2 8 5.21
Sill Band
Along Grid 3-3 1 28.35 2 8 22.4
Along Grid 5-5 1 28.35 2 8 22.4
Along Grid A-A and J-J 2 8.6 2 8 13.59
Along Grid C-C and H-H 2 8.6 2 8 13.59
Along Grid E-E and GRID F-F 2 10.25 2 8 16.19
Stair cover walls
Grid 5-5 and Grid 4-4 2 3.15 2 8 4.97
Grid E-E and Grid F-F 2 3.3 2 8 5.21
7 Concrete Bench
Dividing Bars 6 1.825 4 10 27.03
In Bench
Main Bar 6 0.55 2 12 5.86
Distribution Bar 6 3.15 4 8 29.86
Beam Bar 6 3.85 4 12 82.13
Beam Stirrups 6 0.41 22 8 21.38
Upper Band 6 3.85 2 8 18.25
Band Stirrups 6 0.275 22 8 14.34
Total 22171.99
0
Remarks
Banganga municipality
Office of Municipal Executive
Banganga,Kapilvastu
Banganga
RATE ANALYSIS for FY 2077/078
Mode Of Execution= contract
1. EARTHWORK
Unskilled m.d. 0.70 515.00 360.50
All type of Excavation work in soft clay & silty soils including disposal
Equipment
upto 10m lead and 1.5m lift
3%of labour 10.82
Item No. per Sub-Total 371.32
1.1 1 cu.m. Contract Rate 1.15 427.01
Norms - 2(1) page 4
Unit Rate Excluding VAT per cu.m. 427.01
Earthwork in excav. : soft soil
2. BRICK WORKS
Skilled m.d. 0.50 750.00 375.00
Unskilled m.d. 1.00 515.00 515.00
Dry brick laying (soling) in sand a) flat
Brick nos. 420.00 16.17 6790.54
Sand cu.m. 0.71 3424.70 2431.54
Item No. per Sub-Total 10112.08
2.1 10 sq.m. Contract Rate 1.15 11628.89
Norms - 11(15a) page 65
Unit Rate Excluding VAT per sq.m. 1162.89
Brick soling - flat
Rubble masonry work including supply of hard stone blocks preparing Unskilled m.d. 5.00 515.00 2575.00
cement sand mortar and construction of the wall upto 5 m high haulage cement m.t. 0.159 17520.60 2785.77
distance upto 10 m a) cement Sand cu.m 0.45 2672.27 1202.52
sand mortar 1:4 block stone " 1.00 3293.72 3293.72
bond st. " 0.10 3293.72 329.37
Item No. per Sub-Total 11311.39
3.2 1 cu.m. Contract Rate 1.15 13008.10
Norms - 6a(2) page 25
Unit Rate Excluding VAT per cu.m. 13008.10
Stone work in c.m. - 1:4
4. WOODEN WORKS
Skilled m.d. 0.22 750.00 163.04
Unskilled m.d. 0.02 515.00 11.20
Supplying and fixing of precast RCC frame of size (100 mm*75 mm) RCC frame rm 1.00 852.80 852.80
holdfast nos. 1.00 15.00 15.00
screw nos. 1.00 1.00 1.00
Item No. per Sub-Total 1043.04
4.1 1 R.m. Contract Rate 1.15 1199.50
Norms - 10(1) page 49
Unit Rate Excluding VAT per R.m. 1199.50
Sal Wood work - chaukhat
5. CONCRETE WORKS
Skilled m.d. 1.00 750.00 750.00
Concreting of foundation, vertical faces walls (cement concrete) including
Unskilled m.d. 4.00 515.00 2060.00
supply of materials and haulage distance upto 30m.
cement m.t. 0.22 17520.60 3854.53
a) P.C.C.(1:3:6) gravel_1 cu.m. 0.65 2323.84 1510.50
Gravel_1 =40 mm gravel round gravel_2 cu.m. 0.24 2323.84 557.72
Gravel_2 =20 mm gravel round sand cu.m. 0.47 2672.27 1255.97
Item No. per Sub-Total
9988.72
5.1 1 cu.m. Contract Rate 1.15
Norms-7.2(c) page 30
Unit Rate Excluding VAT per cu.m. 11487.02
P.C.C. - 1:3:6 with round aggregate
75 mm thick plain cement concrete of ratio 1:2:4 with cement punning all Skilled m.d. 1.25 750.00 937.50
finish for floor Unskilled m.d. 3.00 515.00 1545.00
Note :- cement m.t. 0.26 17520.60 4555.35
Sieved gravel round sand cu.m. 0.34 2672.27 908.57
gravel 20 mm cu.m. 0.68 2323.84 1580.21
Item No. per Sub-Total 9526.64
RATE ANALYSIS for FY 2077/078
Mode Of Execution= contract
Form Works
Making Wooden form work for slab and floor including supply and Skilled m.d. 1.72 750.00 1290.00
selection of materials fixing, nailing according to drawings, applying Unskilled m.d. 2.57 515.00 1323.55
Primer, placing separa- tors, dismantling forms and hauling upto 30 m Wood cu.m. 0.066 35280.00 2319.66
distance Nails kg 2.50 90.00 225.00
(Salvage value after using 6 times 0.25%i.e. 0.526*0.75/6)
Item No. per Sub-Total 5158.21
5.8 10 sq.m. Contract Rate 1.15 5931.94
Norms-8(2.a) page 37
Unit Rate Excluding VAT per sq.m. 593.19
Form work for slab
6. ROOFING WORKS
Skilled m.d. 1.10 750.00 825.00
Unskilled m.d. 1.25 515.00 643.75
CGIsheet sq.m. 12.00 659.29 7911.46
26 gause C.G.I. sheet roofing works with supply of materials all complete
nutbolt nos. 30.00 6.75 202.50
J-hook nos. 25.00 19.00 475.00
bit.washer nos. 55.00 2.00 110.00
Item No. per Sub-Total 10167.71
6.1 10 sq.m. Contract Rate 1.15 11692.87
Norms-9(1) page 46
Unit Rate Excluding VAT per sq.m. 1169.29
CGI sheet roofing - 26 #
Making various types of false ceiling in sal Wood frame of size Skilled m.d. 23.00 750.00 17250.00
50mm*75mm (with 600*900 mm frame size) using 4 mm commercial Unskilled m.d. 2.30 515.00 1184.50
plyWood Wood cu.m. 0.45 165816.00 74617.20
plyWood sq.m. 37.50 258.24 9684.00
Ceiling size : 9.75 x 3.65 = 35.68 sq.m.
listi, Killa L.S. 50.00
Item No. per Sub-Total 102785.70
RATE ANALYSIS for FY 2077/078
Mode Of Execution= contract
7. STEEL WORKS
Skilled m.d. 1.076 750.00 807.00
G.I. barbed wire 12 # fencing with supply of materials and fitting all
Unskilled m.d. 5.380 515.00 2770.70
complete
barb.wire Rm 110.00 16.04 1764.64
1kg = 7m Nails L.S. 50.00
Item No. per Sub-Total 5392.34
7.1 100 m Contract Rate 1.15 6201.19
Norms-24(6) page 164
Unit Rate Excluding VAT per Rm. 62.01
Barbed wire 12# fencing
Supply, fixing and fitting of MS grill with painting over Primer all grill kg 1.000 152.97 152.97
complete
Item No. per Sub-Total 152.97
7.2 1 kg Contract Rate 1.15 175.92
Supply, fixing and fitting iron angle with painting over Primer all Ms angle kg 1.000 152.97 152.97
complete
Item No. per Sub-Total 152.97
7.4 1 kg Contract Rate 1.15 175.92
Supply, fixing and fitting of collipsible shutter with painting over Primer Rolling shutter kg 1.000 169.92 169.92
all complete
Item No. per Sub-Total 169.92
7.5 1 kg Contract Rate 1.15 195.41
8. PLASTERING WORKS
Skilled m.d. 15.00 750.00 11250.00
12.5 mm thick cement sand plastering works in ceiling
Unskilled m.d. 20.00 515.00 10300.00
a) Cement sand ratio - 1:3 cement m.t. 0.625 17520.60 10950.37
sand cu.m 1.28 2672.27 3420.51
Item No. per Sub-Total 35920.88
8.1 100 sq.m. Contract Rate 1.15 41309.01
Norms-12(1.b) page 67
Unit Rate Excluding VAT per sq.m. 413.09
12.5mm cem. plaster in c.m. - 1:3 ceiling
12.5 mm thick cement sand plastering works Skilled m.d. 12.00 750.00 9000.00
Unskilled m.d. 16.00 515.00 8240.00
a) Cement sand ratio - 1:4 cement m.t. 0.538 17520.60 9426.08
sand cu.m 1.46 2672.27 3901.52
Item No. per Sub-Total 30567.60
8.2 100 sq.m. Contract Rate 1.15 35152.74
Norms-12(1.c) page 67
Unit Rate Excluding VAT per sq.m. 351.53
RATE ANALYSIS for FY 2077/078
Mode Of Execution= contract
12.5 mm thick cement sand plastering works Skilled m.d. 12.00 750.00 9000.00
Unskilled m.d. 16.00 515.00 8240.00
a) Cement sand ratio - 1:6 cement m.t. 0.382 17520.60 6692.87
sand cu.m 1.57 2672.27 4195.47
Item No. per Sub-Total 28128.33
8.3 100 sq.m. Contract Rate 1.15 32347.58
Norms-12(1.d) page 67
Unit Rate Excluding VAT per sq.m. 323.48
1/2" cement plaster in c.m. - 1:6
20 mm thick cement sand plastering works Skilled m.d. 14.00 750.00 10500.00
Unskilled m.d. 19.00 515.00 9785.00
a) Cement sand ratio - 1:3 cement m.t. 0.960 17520.60 16819.77
sand cu.m 1.95 2672.27 5210.93
Item No. per Sub-Total 42315.70
8.4 100 sq.m. Contract Rate 1.15 48663.06
Norms-12(4.a) page 68
Unit Rate Excluding VAT per sq.m. 486.63
20 mm cement plaster in c.m. - 1:3
Flush cement pointing works in cement sand ratio 1:3 Skilled m.d. 10.50 750.00 7875.00
Unskilled m.d. 12.00 515.00 6180.00
a) In brick masonry cement m.t. 0.155 17520.60 2715.69
sand cu.m 0.32 2672.27 855.13
Item No. per Sub-Total 17625.82
8.5 100 sq.m. Contract Rate 1.15 20269.69
Norms-14(1.c) page 74
Unit Rate Excluding VAT per sq.m. 202.70
Flush cement pointing 1:3 - in brick wall
9. PAINTING WORKS
Skilled m.d. 1.875 750.00 1406.25
2 coat white washing with gum in new surface
Unskilled m.d. 1.375 515.00 708.13
a) in ceiling Chuna kg 22.00 40.00 880.00
Gum Adhesive kg 0.88 180.00 158.40
Item No. per Sub-Total 3152.78
9.1 100 sq.m. Contract Rate 1.15 3625.69
Norms-13(1.b) page 70
Unit Rate Excluding VAT per sq.m. 36.26
2 coat white washing a) in ceiling
Items Descript.
Unit Unitper
Rate Excluding VAT Quantity
sq.m. U.Rate Amount
184.62
1 coat Enamel painting
110mm (4") dia. HDPE Pipe laying with butt welded joints including plumber m.d. 1.50 750.00 1125.00
fittings Helper m.d. 1.50 515.00 772.50
4 kg/Sq.m. ( 1.703 Kg/m) Unskilled m.d. 3.00 515.00 1545.00
6 Kg/Sq.m. (2.454 Kg/m) Fuel litre 0.50 114.13 57.07
10 Kg/Sq.m. ( 3.801 Kg/m) Pipe r.m. 50.00 511.08 25553.79
Miscellaneous 2.51% of Unskilled 38.78
Item No. per Sub-Total 29092.13
10.5 50 r.m. Contract Rate 1.15 33455.95
RATE ANALYSIS for FY 2077/078
Mode Of Execution= contract
12. MISCELLANEOUS
Skilled m.d. 1.43 750.00 1072.50
Unskilled m.d. 0.143 515.00 73.65
25mm th. SalWood Eaves board work
Wood m3 0.275 165816.00 45599.40
Killa L.S. 50.00
Item No. per Sub-Total 46795.55
12.1 10 Sq.m. Contract Rate 1.15 53814.88
Norms - 2041 Item 10.19 (Page 56)
Unit Rate Excluding VAT per Sq.m. 5381.49
25mm th. SalWood Eaves board work
Sub-Total 382.2
Earthwork in excavation in
trenches,foundation etc. in all kinds of soil
including timbering and pumping out water
from the trenches(if necessary)dressing of
2 sides,ramming of bottom,lift up to
2m,stacking of excavated material 30m,clear
from the edge of foundaion trench all
complete as per specification,drawing and
instruction of Site Engineer.
Footings
F5 1500X1500 4 1.5 1.5 1.75 15.75
F4 1800X1800 4 1.8 1.8 1.75 22.68
F3 2100X2100 14 2.1 2.1 1.75 108.04
F2 2280X2280 4 2.28 2.28 1.75 36.38
F1 2600X2600 12 2.6 2.6 1.75 141.96
Total 353.22269
Sub-Total 282.11687
Supplying and laying dry stone soling in
foundation in proper line and level, all
4
complete as per specifications, design and
instruction of the Engineer.
Footings
F5 1500X1500 4 1.5 1.5 0.15 1.35
F4 1800X1800 4 1.8 1.8 0.15 1.94
F3 2100X2100 14 2.1 2.1 0.15 9.26
F2 2280X2280 4 2.28 2.28 0.15 3.11
F1 2600X2600 12 2.6 2.6 0.15 12.16
Sub-Total 102.64
Footings
F5 1500X1500 4 1.5 1.5 0.1 0.9
F4 1800X1800 4 1.8 1.8 0.1 1.29
F3 2100X2100 14 2.1 2.1 0.1 6.17
F2 2280X2280 4 2.28 2.28 0.1 2.07
F1 2600X2600 12 2.6 2.6 0.1 8.11
For Lower Tie beam 9"X9"
Along Grid 1-1 1 2 0.38 0.075 0.05
Along Grid 2-2 1 18 0.38 0.075 0.51
Along Grid 3-3 1 12.18 0.38 0.075 0.34
Along Grid 4-4 1 0.9 0.38 0.075 0.02
Along Grid 5-5 1 12.9 0.38 0.075 0.36
Along Grid A-A and J-J 2 4.1 0.38 0.075 0.23
Along Grid B-B, D-D, G-G and I-I 4 0.62 0.38 0.075 0.07
Along Grid C-C and H-H 2 0.55 0.38 0.075 0.03
Along Grid E-E and GRID F-F 2 3.65 0.38 0.075 0.2
Ramp
Base fo Ramp (retaining wall) 2 9.971 0.28 0.075 0.41
Sub-Total 20.76
Ramp surface
Inclined portion 2 6.99 1.19 0.075 1.24
Levelled Platform 2 1.78 1.19 0.075 0.31
Sub-Total 24.27
RCC Works
Footings
F5 1500X1500 4 0.62 2.47
F4 1800X1800 4 0.87 3.49
F3 2100X2100 14 1.18 16.45
F2 2280X2280 4 1.38 5.5
F1 2600X2600 12 2.06 24.71
Second Floor Beam (6400 mm lvl) Same as First Floor Beam 14.2
Third Floor Beam (9600mm lvl) Same as First Floor Beam 14.2
First Floor slab and staircase same as first floor slab and staircase 5.570
Second Floor slab and staircase same as first floor slab and staircase 5.570
Lintel Band
Ground Floor
Along Grid 3-3 1 28.35 0.23 0.1 2.83
Along Grid 5-5 1 28.35 0.23 0.1 2.83
Along Grid A-A and J-J 2 8.6 0.23 0.1 1.72
Along Grid C-C and H-H 2 8.6 0.115 0.1 1.72
Along Grid E-E and GRID F-F 2 10.25 0.115 0.1 2.05
Stair cover walls
Grid 5-5 and Grid 4-4 2 3.15 0.23 0.1 0.63
Grid E-E and Grid F-F 2 3.3 0.23 0.1 0.66
Concrete bench
Bench 7 3.15 0.4 0.1 0.882
bench support 14 0.1 0.1 0.525 0.0735
Bench back support (railing) (125X100) 7 3.15 0.1 0.125 0.2756
Total 289.47287
Straightening,cleaning,cutting,fabricating,be
nding,placing as per design and details for
RCC elements including supplying and
binding the Torsteel reinforcement with
annealed wire for tying the reinforcement
8 for all sizes of bars at each junction including
all waste and cut pieces,provision for
spacers chairs,providing and placing cement
mortar(1:1) cover blocks to keep the bars in
the intended position at all level, all
complete as per drawing,specification and
instruction of the Engineer.
Sub-Total 0
9 Metal Works
Ramp unit wt
Vertical post @ 1.5 m c/c 50 mm 7 0 1.15 0
Horizontal Handrail 50 mm 1 10.035 0 0
Horizontal Handrail 25 mm 2 10.035 0 0
Sub-Total 0
Staircase Railing
Vertical post @ 1.5 m c/c 50 mm 7 0 1.15 0
Horizontal Handrail 50 mm 1 10.035 0 0
Horizontal Handrail 25 mm 2 10.035 0 0
Footings
F5 1500X1500 4 1.5 4 0.2 4.8
F4 1800X1800 4 1.8 4 0.2 5.76
F3 2100X2100 14 2.1 4 0.2 23.52
F2 2280X2280 4 2.28 4 0.2 7.29
F1 2600X2600 12 2.6 4 0.2 24.96
Columns
Upto Plinth Level (+000 lvl)
Column 350X350 38 0.35 4 1.15 61.18
Columns With two Beams (Up to Plinth) 16 0.23 0.35 -2 -2.57
Columns With Three Beams (Up to Plinth) 10 0.23 0.35 -3 -2.41
Column with Four Beams (Up to Plinth) 6 0.23 0.35 -4 -1.93
Lintel band
Ground Floor sides
Along Grid 3-3 1 28.35 2 0.1 5.67
Along Grid 5-5 1 28.35 2 0.1 5.67
Along Grid A-A and J-J 2 8.6 2 0.1 3.44
Along Grid C-C and H-H 2 8.6 2 0.1 3.44
Along Grid E-E and GRID F-F 2 10.25 2 0.1 4.1
Total 2325.9475
Providing and laying first class burn bricks
1:6 C/S in 10mm thick cement sand mortar
with one side fair finish, including cost of
scaffolding,curing filling and raking out joints
11
wherever required, and transportation upto
30m using approved size and quality bricks
as per drawings, specifications and the
instruction of site Engineer,all complete.
Up to Plinth Level
Along Grid 1-1 1 3.15 0.23 0.47 0.34
Along Grid 2-2 1 28.35 0.23 0.47 3.06
Along Grid 3-3 1 24.85 0.23 0.47 2.68
Along Grid 4-4 1 3.15 0.23 0.47 0.34
Along Grid 5-5 1 28.35 0.23 0.47 3.06
Along Grid A-A and J-J 2 8.6 0.23 0.47 1.85
Along Grid B-B, D-D, G-G and I-I 4 2 0.23 0.47 0.86
Along Grid C-C and H-H 2 28.35 0.23 0.47 6.12
Along Grid E-E and GRID F-F 2 30 0.23 0.47 6.48
Ground Floor
Along Grid 3-3 1 28.35 0.23 2.8 18.25
Along Grid 5-5 1 28.35 0.23 2.8 18.25
Along Grid A-A and J-J 2 8.6 0.23 2.8 11.07
Deductions
Doors D1 -9 1.05 0.23 2.1 -4.56
Windows W1 -12 2.35 0.23 1.25 -8.1
Windows W2 -2 2.35 0.23 1.2 -1.29
First Floor same as ground floor 33.62
Second Floor same as ground floor 33.62
Sub-Total 160.94
Providing and laying first class burn bricks
1:4 C/S in 10mm thick cement sand mortar
with one side fair finish, including cost of
scaffolding,curing filling and raking out joints
12
wherever required, and transportation upto
30m using approved size and quality bricks
as per drawings, specifications and the
instruction of site Engineer,all complete.
Ground Floor
Along Grid C-C,E-E,F-F and H-H 4 6.6 0.115 2.8 1.28
First Floor same as ground floor 1.28
Second Floor same as ground floor 1.28
Paraphet wall
First Floor 1 35.65 0.115 0.75 3.0748125
Second Floor 1 35.65 0.115 0.75 3.0748125
Top Floor 1 83 0.115 0.75 7.15875
Total 17.148375
Ground Floor
W1 75X100 section 12 10.95 0.075 0.1 0.98
W2 75 X 100 section 1 10.7 0.075 0.1 0.08
D1 75X100 section 9 5.25 0.075 0.1 0.35
First Floor 1.41
Second Floor 1.41
Top Floor
W2 75 X 100 section 1 10.7 0.075 0.1 0.08
D1 75X100 section 1 5.25 0.075 0.1 0.35
Sub-Total 4.66
Sub-Total 50.33
Ground Floor
W1 (38X75) 48 3.266 0.038 0.075 0.44
W2 (38X75) 4 3.266 0.038 0.075 0.03
First Floor same as ground floor 0.47
Second Floor same as ground floor 0.47
Top Floor
W2 (38X75) 4 3.266 0.038 0.075 0.037
Sub-Total 1.45
1 Outer Plaster
Below plinth including riser of steps 1 47.15 0.45 21.2175
Ground floor(3200 lvl) 1 43.65 3.2 139.68
Deductions
Window W1 -12 1.05 2.1 -26.46
W2 -1 2.35 1.25 -2.93
D1 -8 2.35 1.2 -22.56
First Floor same as Ground Floor 87.73
Second Floor same as Ground Floor 87.73
Top floor (Staircase Cover)
Grid 5-5 1 3.15 2.8 8.82
Ceiling plaster sides 1 92.5 0.1 27.75
ceiling plaster outside 162.78
Sub-Total 483.7575
2 Internal Plaster
Ground Floor Area
Classroom 1 and Classroom 3
Grid 5-5 and Grid 3-3 2 7.123 2.8 39.88
Grid A-A and Grid C-C 2 7.31 2.75 40.2
Deduction
Windows W1 -4 2.35 1.25 -11.75
D1 -2 1.05 2.1 -4.41
Classroom 2 and Classroom 4
Grid 5-5 and Grid 3-3 2 7.24 2.8 40.54
Grid E-E and Grid C-C 2 7.31 2.75 40.2
Deduction
Windows W1 -2 2.35 1.25 -5.87
D1 -2 1.05 2.1 -4.41
Grid E-E and Grid F-F inner side 2 7.42 2.75 40.81
Grid 3-3 outer 1 29.66 2.8 83.04
Deduction
D1 -8 1.05 2.1 -17.64
Column Grid(2-2) 10 0.35 4 2.8 39.2
Column Grid(1-1)) 2 0.35 4 2.8 7.84
Sub-Total 2379.6418
Total plaster 2863.3993
Laying machine mixed 38mm plain cement
concrete in flooring with cement,sand and
stone ballast maximum size 13mm gauge
including setting out,mixing,compacting,
16
curing and finishing etc.to approved
level,lines and dimension all complete as per
specification,drawing and instruction of site
engineeer.
Sub-Total 1230.5145
Sub-Total 1230.5145
Sub-Total 3588.1563
Supplying and applying Emulsion paint
(weather coat)(Two coat paint over one coat
19 primer), all complete as per specification,
design, drawings and instruction of the
Engineer.
Concrete bench
bench support 14 0.1 4 0.525 2.94
Bench back support (railing) (125X100) 7 3.15 0.45 9.9225
Bench front part 1 3.25 0.1 0.325
Sub-Total 1163.563
Unit Remarks
m2
m3
m3
m3
m3
m3
m3
Kg
Kg
kg
sq.m
cum
cum
sq.m
Banganga municipality
Office of Municipal Executive
Banganga,Kapilvastu
Banganga
SUMMARY OF RATE ANALYSIS FOR Buildings FY: 2077/078
13 % vat
3 % contenginecy
Total cost
amount Remarks
96.92
145.33
317.04
2776.23
1882.56
675
5893.09
1432020.797
17.6
172.3
247.5
101.19
10075.1
1112.7
904.2
200.00
10813.64
9496657.204
10928678
1420728.14
327860.34
12677266.48