INPECTION REQUEST (IR)

ORIGINATOR : TOP BUILDER CO LTD


MAURITIUS YIHAI PAILLES GARDEN
PROJECT :
PHASE 1A - APARTMENT C

Reinforcement for Beams and Slab 3rd Floor Level


INSPECTION REQUEST N°: IR 026 WORK / ELEMENT:
9.900
ISSUE DATE: 1-Dec-22 LOCATION: Second to Third Floor

INSPECTION DATE: 2-Dec-22 INSPECTION TIME: 2.00pm

21/VCEL/YGSC/A-C/CONS-047.0, 047.1, 047.2,


APPROVAL DATE: 5-Dec-22 DRAWING N°:
047.3, 042, 043A, 046 & 022A
PROJECT
ACTION BY: ARCHITECT STRUC. ENGINEER M&E ENGINEER INTERIOR DESIGN Q. SURVEYOR
MANAGER

Tick as
Appropriate √ √
MATERIAL OR WORK ELEMENT REPLIES
The following will be ready for inspection prior to proceed INSPECT & INSPECT & INSPECT &
to concreting. APPROVED NOT APPROVED COMMENTED
1st half - Reinforcement for Beams & Part Slab
1)
Bottom Bars Friday 02nd Dec 2022)
2nd half - Reinforcement for Beams, Slabs Bottom & * Tick as Appropriate
1.1
top bars (Monday 05th Dec 2022) COMMENTS / OBSERVATIONS

PROJECT
DISTRIBUTION: ARCHITECT STR. ENGINEER MEP ENGINEER INTERIOR DESIGN Q. SURVEYOR
MANAGER

Tick as
Appropriate √ √ √

RAISED BY (NAME): J. J. FRANCOIS ANSWERED BY:

CONSULTING
SIGNED FOR MAIN CONTRACTOR : Computer generated document FIRM:

DATE: 1/Dec/22 DATE: