You are on page 1of 17

cilegancia '"(·4CA S A cileganciil

, Archi!ec!s & Engineering Consultan!s fit·OUU

healthcare
Project: Korean Medical Center (KMC Hospital project)

METHOD STATMENT SUBMITTAL


Date: July-20-2022 Reference: EF-0002-EDTC-TS-MST-KMC-EL-00022-00 I
Rev.00 Description: METHOD STATEMENT FOR THE INSTALLATION OF WIRING ACCESSORIES

Location Of Works: (i.e. Floor. room...etc)LGF-RF

Specification Section: Section 2 1

·-- - . ;;;y
Ap1 "'ovS
A
RECEIV ED : Record

The Contractors Authoriz-..J -· '"'u


: Mr. Karim R. Morcos: (J J/"I ) 2 1 JUL 2022
Technical Manager:
1
v ··· ·3
RECEIVED

ACTION: (As Marked)

D App roved dpproved as Noted D Not Approved D Resubmit

Appendix 07 Page 1of 1 LCQ-Jan. 2015 (Rev.O)


The The Client:
DESIGN MANAGEMENT AND BUILD OF eleganc
elegancia Project Name OUT WORKS AND FINISHES OF The Engineer:
KOREAN
MEDICAL CENTRE (LGF+G+S+RF) I \ t :\ \
elegancia Uct,...!
Mt l 'I..\ F•1;i '"":i Cr1t!l ,_, ,,

Project No. EF.0002 Document No.:

Consultant LACASA Architect and Engineering Consultants EF.0002-EDTC-KMC -MST-EL-00019


Main
Contractor Elegancia Fit-out Rev. No. Date

METHOD STATEMENT FOR INSTALLATION OF WIRING


00 16-07-2022
ACCESSORIES

METHOD STATEMENT FOR THE INSTALLATION OF WIRING ACCESSORIES


PROJECT NAME:

KOREAN MEDICAL CENTRE (LGF+G+8+RF)

Document Ref. Number: EF.0002-EDTC-KMC-MST-EL-00019 REV. 00

Prepared by Approved by Approved by (LACASA)


(EEMS) (EEMS Project Manager)
Full Name: RUIN E MENESES Yousef Al Tanbakji

Designation: Snr. QA/QC Engineer Project Manager

Date: 16 July 2022


••I

Signature :
/
'./_
c- \
Status Code:

DD: Draft D Fl: For Information D FC: For Construction

DP: Preliminary liZI FA : For Approval * Externa l Authorization (Client I


Consultant), where required
Distri bution :

COPY NO. COMPANY DESIGNATION


1 EDTC Sr. Project Manager
2 EDTC Technica l Manager
3 EDTC Constr uction Manager
4 EDTC QA/QC Manager
5 LACASA Client Representative
6 EHC Client/Employer

Page
The The Client:
DESIGN MANAGEMENT AND BUILD OF elegancron
elegancia Project Name OUT WORKS AND FINISHES OF The Engineer:
KOREAN

elegancia MEDICAL CENTRE (LGF+G+S+RF) I \C -\ \


,...,, """"' A P "'j ,.•• .,..11

l•<
' Project No. EF.0002 Document No.:

Consultant LACASA Architect and Engineering Consultants EF.0002-EDTC-KMC-MST-EL-000 19


Main
Elegancia Fit-out Rev. No. Date
Contractor
METHOD STATEMENT FOR INSTALLATION OF WIR ING
00 16-07-2022
ACCESSORIES

Table of Contents

1.0 PURPOSE................................................................................................................................................................... 3

2.0 SCOPE........................................................................................................................................................................ 3

3.0 REFERENCES............................................................................................................................................................ 3

4.0 ABBREVAT IONS/DEFEN ITIONS............................................................................................................3

5 .0 RESPONSIBILITIES..................................................................................................................................3

6.0 MANPOWER..............................................................................................................................................4

7.0 PLANT AND EQUIPMENTS................................................................................................................................ 4

8.0 SITE LOGISTICS.......................................................................................................................................4

9.1 WORK PROCEDURE................................................................................................................................................. 5

9.2 PRE-INSTALLATION CHECK......................................................................................................................5

9.3 INSTALLATION PROCEDURE OF WIRING ACCESSORIES.....................................................................5

10.0 QUALITY CONTROL PROCEDURES/ INSPECTIONS.....................................................................................6

11.0 PLANT AND EQUIPMENT'S CONTROL.............................................................................................................6

12.0 HEALTH AND SAFETY ENVIRONMENT..................................................................................................6

13.0 RISK ASSESSMENT (Attached )........................................................................................................................ 7

14.1 INSPECTION TEST PLAN/ INSPECTION CHECK LISTS (Attached)...............................................................7

Pag
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
healthcare
elegancia Proj ect Na me OUT WORKS AND FINISHES OF KOREAN
The Engineer:
MEDICAL CENTRE {LGF+G+8+RF ) I \ (. A A
elegancia I'"'"'' /lr(;."l•tt:;.t:. & Ena1 C¢f'l'l9 Ccn::.u anl'!.

Project No. EF.0002 Document No.:

Consultant LACASA Architect and Engineering Consultant s EF.0002-EDTC-KMC-MST-EL-00019

Main
Elegancia Fit-out Rev. No. Date
Contracto r

MET HOD STATEMENT FOR INSTALLAT ION OF WIRING 16-07-2022


00
ACCESSORIES

1.0 PURPOSE
This method statement gives guide lines contained herein to ensure that the job execution complies with the
requirement of the project requirements, specification and the Authorities concerned and serves the intended
purpose to satisfactory level. <l""'1-
2.
SCOPE
0
This Method Statement covers the nature and type of work for the Installation and insulation of HVAC GI Duct and
accessories. This procedure is to be read in conjunction with the relevant Inspection and Tes la·n (ITP) cle and
detail, outlining the responsibility and the quality verjfication to be performed by various parties.

3.0
REFERENCES f>'Y J- - \ )
• Project Specifications I Qatar Construction Specification :2014 "Electrical Works"
• Project HSE Plan
• Project Quality Plan
• Approved Material Submittal
• Approved Shop Drawing I IFC Drawing
4.0 ABBRE VATIONS/DEFENITIONS
QCS Qatar Construction Specifications
HSE Health, Safety and Environment
QA/ QC Quality Assurance and Quality Control
ITP Inspection and Test Plan
ERP Emergency Response
Plan KR Kharamaa Regulation
GI Galvanized Iron
SIR Site Inspection Request
MIR Material Inspection Request
ICL Inspection Checklist
5.1 RESPONSI BILITIES.

5.2 Project Manage r (EEMS) : Ensure that works are carried out in accordance with this method statement and
all necessary safety and protective equipment are provided a long with properly trained and qualified
personnel dedicated to work on task.
5.3 Constructio n Manager ( EEMS) : In charge shall be responsible for coordination and supervision of
construction works (activities) and construction groups, ensuring that works shall be done as per project
specification and approved drawings,and all safety measures are implemented .
5.4 QA QC Engineer ( EEMS) : Obtain consent for applicable ITP prior to use. Ensure that all inspections and tests
are carried out as per project requirement and in turn are recorded. Ensure that all equipment related are
calibrated. Maintain all quality records relevant to verification of records
5.5 Project Engineer/Site Engineer: Shall be responsible for all site activities and closed supervision for the
installation of all works . To carry out the work as approved method statement. He is also responsible to
ensure adequate equipment and tools to carry out the work and assure that disposal of debris will be as per
approved designated dis posal point.
5.6 Surveyo r (EEMS) : Responsible for all su rvey works related to levels for formation levelof blinding,
coordinates with site engineer to ensure that all required information has been provided to proceed with the
works complying with the project specification/standards.
5.7 Genera l Foreman {E EMS) : Shall be supervising closely the activities designated to them ensuring that a ll
instructions and procedures according to this method statement and Risk Assessment are str ictly followed.
5.8 Safety Officer {EEMS): Responsible for day-to-day activities on maintaining safety on site complying with
the requirements of project HSE Plan Cooperate wit h the Project team to create and maintain safe
working conditions. Assist Site Engineers and Foremen to organize the work area to perform their duties with
maximum efficiency and minimize risk to them or to equipment. Inspect equipment and tools before use to
ensure correct storage and proper utilization. Exercise emergency authority to prevent or stop unsafe
acts. Investigate

3
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia

\'
healthcare
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN I \ (
The Engineer:
MEDICAL CENTRE (LGF+G+8+RF)
N .,,r:.&E; or "r .....
elegancia '""""' Project No. EF.0002 Document No.:

Consultant LACASA Architect and Engineering Consultants EF.0002-EDTC-KMC-MST-EL-00019


Main
Elegancia Fit-out Rev. No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF WIRING


00 16-07-2022
ACCESSORIES

accidents that have occurred within incident areas. Ensure preparation and implementation of Site Safety and
Health Plan (SSHP). Maintain record of all injuries and damages on site. Submit HSE reports as require.
6.1 MANPOWER

• Project/Site Electrical Engineer


• QA/QC Engineer - Electrical
• Supervisor/Foreman - Electrical
• Charge Hand - Electrical
• Skilled workers - Electricians
• Unskilled workers - Helper, Electricians
7.1 PLANT AND EQUIPMENTS
All equipment or tools brought on to premises will be of sound construction and will meet the
statutory requirements applicable to these tools or equipment.

• Electrical Too lbox


• Safety Ladder I Scaffolding
• Electric Drilling Machine
• Measurement Tape I Spirit Level I Water Levelling Pipe
• Hacksaw Cutter
• Warning Tapes, boards, barriers,lighting as required
• Hammer I Cleaner I Lubricants
• Duct Insulation Toolbox
• Marker
• Screw Driver
• Painting/Brush
• Metal Sheet Cutters
• Sha rp knife/cutter
8.1 SITE LOGISTICS
• All the Wiring accessories shall be loaded and transported by a delivery truck,crane, or fo rklift to store and
shifted a nd loaded to the specific workplace location and accompanied by experienced riggers.
• EEMS sha ll safegua rd the accessibility of all th e roads arou nd the project to avoid delay or accident.
• Safety officer shall be present during loading and unloading of the materials.
9.1 WORK PROCED URE

9.1 PRE-INSTALLATION CHECK

• Ensure that all safety requirements are in place in accordance with project safety plan & Qatar
Aut hority Health & Safety codes of practice.
• All the wiring accessories materials will be transported to the site by the supplier and care shall be
taken by the storekeeper to ensure the materials are not damaged during transport.
• All the wiring accessories materials to be stored properly immediately after receiving in site.

• Special care shall be taken by the storekeeper to protect the materials from physical damage and
distortion. Material should be stored on site before installation shall be properly secured.
• On receipt of the material at site, QA/QC Engineer I Site Electrical Engineer shall inspect the
material internally and inspection shall be offered to the Consultant for approva l through
material inspection request (MIR) form.
• Ensure that wiring accessories materia ls used have passed receiving ins pection in accordance
with QAQC procedures and are not damaged or defective.

4 I
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
healthcare
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN
The Engineer:
MEDICAL CENTRE (LGF+G+8+RF ) I\CA A
elegancia I'"""' flf >t•tcasS E111J'l('Ct!l"IC}CO;i;vl!.<1n1'i

Project No. EF.0002 Document No.:

Consultant LACASA Architect a nd Engineering Consulta nts EF.0002-EDTC-KMC-MST-EL-00019


Main
Elegancia Fit-out Rev. No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF WIRING


00 16-07-2022
ACCESSORIES

• Ens ure that all electricians and helpers are aware of the correct materials handling and installation
procedure to ensure best quality of workmanship.
• Ens ure that wiring accessories materials sha ll be fr ee from damaged and cleaned prior for
installation.
• Work shall be carried out by the site perso nnel under strict supervision and guidance of the
concerned Supervisor s/ Foreman {Electrical) and Site Electrica l Engineer.
• Obtain work permit, if requir ed.
• Ensure the work area is clean and safe to take-up the activities.

• Prior start to installation, refer to the approved shop drawings and details related to the
installation area.
• Installation of wiring accessories materials s hall be coordinated with other services for a fit for
purpose installation.
• Supervisor/ Foreman {Electrical) shall ensure equipment and correct tools are avai lable
for installation to achieve compliance with the contra ct requirements.
• Where further information I clarification in respect of Contract drawings are required the
matter shall be referred to the Contractor by means of a Request for Information {RFI).
• Work shall be carried out by the site personnel under strict s upervision and guidance of the
concerned Supervisors/ Foreman {Electrical) & Site Electrical Engineer .
• Site Inspection Request {SIR) will be prepared, signed I stamped by the Subcontractor and shall be
submitted to Main Contractor/ Consultant for witness and approval.

9.2 PROCEDURE/ METHO D TO BE EMPLOYED:

• Ensure prior to start of wiring accessories insta llation wiring and megger test is approved
by Engineer.
• Ensure and select the Wiring Accessories as per spec ific requirement as indicated in the
approved shop drawings and material submittal.
• After first coat of paint on wall/ceiling/floor wiring accessories will be installed as per approved
shop drawing& coordination drawing.
• All installation will be in accordance with IEE regulation/KR regulation and approved shop drawings.

• Wir ing accessories are fixed at height as shown in approved shop drawing/architectura l lay out
and coordination drawing and KR regulation.
• Clearance must be provided as per distance shown in approved shop drawing.

• Ensure setting out and s pacing between backboxes are approved by architect/Electrica l engineer
prior to proceeding with installation of wiring accessories.
• Ens ure a ll back boxes are flushed w ith plaster finish and suitable extension box shall be used in case
of gap .
• Face plate shall be install e d on ly after prop er finishing and final painting around the
wiring accessories.
• Face plate w ill be installed in s uch a way that all four edges in continuous contact with finished wall.

• A lignment of accessories will be checked after fixing by using spirit level.

• Sea ling between accessor ies and wall sha ll be properly done .

• Prior to wire termination on the sockets/switches outlets back box shall be cleaned properly.

sI7
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
health<;are
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN
The Engineer:
MEDICAL CENTRE (LGF+G+8+RF) L \ CA A
elegancia I'"'''" An,;;>11t«t$ &Enq.r'l('Cllr19Coi'Svlt;int<;

Project No. EF.0002 Document No.:

Consultant LACASA Architect and Engineering Consultants EF.0002-EDTC-KMC-MST-EL-00019


Main
Elegancia Fit-out Rev. No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF WIRING


00 16-07-2022
ACCESSORIES

• The earthing termina lconnected to earth continuity conductor of the final sub circuit shall be
provided at every switch socket position.
• Ratings of switches and sockets should be as per approved drawings as well as specifications a nd
material submittal.
• The termina l capacity of the socket outlet should be 2x4 mm sq. and 3x2.S sq.mm rigid cable.
Constr uction of the plug is such that it can be inserted in one orientation. Earth pin makes first
breaks last.
• Pre-equipped floor boxes shall be installed flush with floor flushing.

• Ensure the conduiting to the floor boxes done properly prior to casting of screeding.

• Location and orientation of floor boxes shall be as per architectural approved layouts.

• Ensure enough distance between water source and power outlets are maintained in accordance with KR
regulations .
• While termination of socket polarity should be considered.

• A ll wiring devices/accessories should be protected after insta llation.

• All switches, sockets and other outlets shall be identified with relevant circuit reference and DB
reference. MEP Contractor to obtain approval for the sample labelling.
• In wet areas and externa l locations only weatherproof type switches wit h specified IP ratings shall be
installed as applicable and as per project specification.

10.1 QUALITY CONTROL PROCEDURES/ INSPECTIONS:

10.2 General
• Before Starting repair QA/QC must ensure that the location must be identified, marked, and cleaned.
• QA/QC to ensure that all activities done in proper standards before submitting the site Inspection
Request (SIR) for Consultant's Approval.
• QA/QC must ensure before proceeding any activities inspection approval are obtained from the Engineer.

10.3 Inspection Test Plan


• Installation activities will follow as per the approved Inspection Test Plan (Refer to Section 14)

11.1 PLANT AND EQUIPMENT'S CONTROL:


• Only competent/trained person shall use t he tools/equ ipment's.
• All tools and equipment shall be in good work ing condition.
• Labors and Helpers shall be instr ucted and trained in the safe use of the equipment.

12.1 HEALTH AND SAFETY ENVIRONMENT:


Implementation of Health & Safety mechanisms and checks sha ll be done as per contract agreement and the approved
project safety manual. The safety officer sha ll carryout the necessary routine inspections.

12.2 Safety Lightings: Sa fety lights will be used in case of power failure ensu ring good illumination for the personnel.
12.3 Task Lightings Adequate lightings will be provided ensuring the good illumination of the work ing area.
Task lighting will be connected to the nearest site distribut ion board which is RCD protected.

6 I7
The Contractor TheClient:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
heollhcMo
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN The Engineer:
MEDICAL CENTRE (LGF+G+S+RF) I \ (,. A ,\
elegancia 11....l
"-".t•Jer:.. & e ,,;u- l"'j Cr,('l!"l ra ti

Project No. EF.0002 Document No.:

Consulta nt LACASA Architect and Engineering Consultants EF.0002-EDTC-KMC-MST-EL-00019


Main
Elegancia Fit-out Rev. No. Date
Contractor

METHOD STATEMENT FOR INSTALLATION OF WIRING


00 16-07-2022
ACCESSORIES

12.3 Emergency Arrangements: Site general safety procedure will be followed. In case of emergency the safety
officer w ill stop the works. He will put in to action the emergency arrangements as described in the
safety manua l.

13.0 RISK ASSESSMENT (Attached)

14.0 INSPECTION TEST PLAN/ INSPECTION CHECKLISTS (Attached)

Page 7 1 7
elegancia elegancia 1
group
"'lc:f' I

DESIGN MANAGEMENT AND BUILD OF FIT OUT WORKS AND FINISHES OF


PROJECT: SCOPE OF WORKS: INSTALLATION OF WIRING ACCESSORIES ITPNO.: EF.0002· ·KMC-ITP·El 00019
KOREAN MEDICAL CENTRE (LGF+G+S+R F)

MANAGED Bv: I QA/QC Engineer ITP REVISION No.: I 00 ITP REV.DATE: I 16JULY 2022

PROCESS ACTIVITY HOLD (H) AND WITNESS (W} POINTS

I
CONTROL REFERENCE TO SPECIFIED REQUIREMENTS SPECIFIED REQUIREMENTS
FREQUENCY DOCUMENTS
TYPE SUB ElEGANCIA LACASA 3•• PARTY FOR INSPECTION TEST APPROVAL & TOLERANCE
o DESCRIPTION
I CON. EEMS FIT-OUT /LAB

A DOCUMENTATIQN
I
v 1 Verify Approval of Drawing, Related H H H H - I • Approved Shop Drawing • Approve d Shop Drawing

I
As per Projec t
Documents, Calculation & Method • Approved Method Statement Specification and • Approved Method
Statement Drawing Statement

v 2 Verify Approval of Accessories H H I


I
H H - I • Material ApprovalSubmittal As per Project Material Approval Submittal
I Specificat ion QCS (MAR)
I
I 2014, Section 21,

I Kharamaa Regulat on

v 3 Verify Approval Material H


H I H
H - I • Material Approval Submittal As per Project Material Approva lSubmittal
Specification QCS

I
(MAR)
2014, Sect ion 21,
Kharamaa Regulation
!
B HSE
I
I
v 1 Verify that Risk assessment is in place H M M H - c HSE PLAN QCS 2014 RISK ASSESMENT
I and operators are wearing proper PPE .

f
I
MATER IAL INSPECTIQN
--
1 Material Delivered on Site-Check H H H - c • Project Specification & QCS 2014 As per manufacturer's Material Inspect ion Request

A I
verification, • Approved Material Submittal guidelines, QCS 2014 (MIR), Delivery Note,Material
Section 21 Test Certificate (as
-Wiring Accessories

I
applicable),Country of Or igin
I (as applicab le)
I
I
/".. D PRE-INSTALLATIQN CHECKS I
i I
1 Preparation of tools/ Equipment and s s I s s - c • Project Specification & QCS 2014 As per approved MAR, Site Inspection Request (SIR)
I materials at site • Approved Method Statement MST, and Shop

I I
Draw ing, Kharamaa
Regulation

r INSTALLATION & TESTING •


: I

·-·· ···-- ·------····- ..·-·--------------··- ··--·------------------- ,_ .1..__ .. 1


,, , _ _____ .._ -- -------·---··-- ----·--·-·-·--·-
elegancia eleganci I
group

DESIGN MANAGEMENT AND BUILD OF FIT OUT WORKS AND FINISHES OF


PROJECT:
KOREAN MEDICAL CENTRE (LGF+G+8+RF)
SCOPE OF WORKS: I INSTA LLATION OF WIRING ACCESSOR IES ITP NO.: I EF.0002· ·-KMC-ITP-EL-00019

MANAGED Bv: I QA/ QC Engineer ITP REVISION No.: I 00 ITP REV. DATE: I 16JULY 2022

PROCESS AtTIVITY HOLD (H) AND WITNESS (W) POINTS


I
REFERENCETO SPECIFIED SPECIFIED REQUIREMENTS
CONTRO
L TYPE
I SUB ! 3'0 PARTY FREQUENCY
REQUIREMENTS FOR INSPECTION &TOLERANCE
DOCUMENTS

10
I
DESCRIPTION ELEGANCIA CON.
i FIT-OUT
EEMS LACASA
/LAB TEST APPROVAL

I/A 1 Installation of Wiring Accesso ries H H H H - F • Project Spec ification & QCS 2014 As per approved MAR, Site Inspection Request (SIR)
MST,and Shop
I • Approved Material Submittal Inspection Check Sheet No.

I
I
• Approved Method Statement Drawing EEMS-KMC-EL-0019
I
I
I
!
I
HOLD (H) AND WITNESS (W) APPROVED
NOTES PREPARED APPRO VED
CONTROL TYPES
POINT PARTIES
FREQUENCY
RE . ,. / (CONSULTANT)

A =Approval
WIR - Inspection Request Form
LACASA
Consultant-LACASA I= Initially
""- ...?
y
R-Review Elegacia Fit-out R = Randomly --.:::::::..
T = Testing Elegancia Fit- QA/QC Mngr./ C=
W - Witness Point YOUSEF AL MARY JOY MUHAMMED
I= Inspection out Engineer Continually RUIN.E.MENESES
TA NBAKJI PARTUSA AR SHAD
S = Supervision H - Hold Point Elegancia MEP Elegancia Electro- F = Final at End
(EEMS) mechanical Services
V = Verificatio S - Surveillance
SUR Surveyor SNR. QA/QC PROJECT
1 RESP. PERSON: SNR.QA/QC LACASA
Point T-Testing ENGINEER MANAGER
SC Sub-Contrac tor
I M - Monitoring LAB/ 3'• Party Laboratory/ 31
20 -1--zrz/
I
• DATE:
Party
DESIGN MANAGEMENT AND BUILD OF FIT
_L\ CASA
elegancia OUT WORKS AND FINISHES OF KOREAN l\rchitects & Engineenng Consu1tan1s
healthcare MEDICAL CENTRE (LGF+G+8+RF )
elegancla elegancia
INSPECTION CHECKSHEET .... "

SIR No.
I
CHECK SHEET FOR INSTALLATION OF WIRING Rev No.
ACCESSORIES
Date

Description of Work:

LevelI Location:

Checked
Checked by
by
SR# ITEM Remarks
Elegancia
EEMS LACASA
Fit-out

Check the installa tion is as per approved shop/Co


1
ordination drawing/ID Drawing

Check delivered materials are approved and free from any physical
2
damage

Check the type and rating of wiring accessories installed as


3
indicated on the relevant drawing (i.e manufacturer, no.of poles and
rating)
Check the wiring accessories proper ly installed on the wall, Ceiling or
4
frame as per the approved insta llation detail.

5 Prior to installa tion ensure wall finish is completed

6 Check mounting accessories and ceiling caps fixed properly

7 Check the Installation as per approved fix ing location

8 Ensure back boxes switches are earthed as per KM regulation.

Check wiring accesso ries are terminated with wire


9
tightened properly.

Ensure megger test of wires I cables are done prior to terminating to


10
the devices.

Ensure face plate is flushed properly with finishe d wall and there is
11
no gap visible around it

12 Ensure the gap between two switc hes are maintained properly

13 Ensure Installation height is maintained as per the standards.

Ensure wiring devices installed above false ceiling is accessing for


14
future maintenance.

Notes:

For Elegancia Fit-out For LACASA


For EEMS QA/QC:
QA/QC: Date Representative : Date:

Name: Sign: Name: Sign Name Sign:

INSTALLATION OF WIRING ACCESSORIES KMC-EF.0002-EEMS-EL-0019


>elegancia I elegancia
group

ELEGANCIA ELECTROMECHANICAL SERVICE

The Employer I The Engineer The Contracto


r

• LA elegancia
M·out

elegancia CASA
healthcare Archite cts & Engineering
Consultants
DESIGN MANAGEMENT AND BUILD OF FIT OUT WORKS AND
Project:
FINISHES OF KOREAN MEDICAL CENTRE (LGF+G+S+RF)

Discipline: D D Architectural D D Others


Structural MEP
MRI No. Rev. No. Date:

Material Description :

Manufacturer:

Supplier:

Material Submittal Number:

Local Purchase Order (LPO) Number:

Delivery Date:
Documents/specification/Drawings BOQ etc.,
for reference:
Identificat ion of Suppliers: Lot No.:

Quantity Ordered: Quantity Received: Val idity Date:

State of Packing:

Documents received with the delivery:

Samp les to be Oves


taken: MAIN

CONTRACTOR :
EEMS Elegancia Fit-out LACASA

Signature:

Name:

Date:

Consultant's Comments:

Action to be taken:

A - Approved D B - Approved with Comments D C - Resubmit D


D- Rejected D
CONSULTANT:
Version 01Date:15-Jun-2021
Form Title:
Document Ref.: EEMS-IMS-PM-3303( Page 1of 1
Material Receiving Inspection -
MRI
The Employer : The Engineer : The Contractor :

elegancia L A CAS A elegancia


healthcare _fil.s:,b.ilacts &...E.ngi.o.eeriog-.C..onsulta o.ts --
Project: KOREAN MEDICAL CENTER

MATERIAL INSPECTION REQUEST


Date Request Prepared: Material Request Reference Number: Revision No.

Material Trade Name: Manufacturer : Supplier:


-
-- ---"
Related Material Approval Submittal: B.O.Q Section:

-
Location Of Use:
---

---
Date Of Delivery: DeliveD'. Note Number: Attachments/Enclosures:

DDel very Note DCertificate of Origion


0MaterialTest Report 00thers

QA/QC Manager Inspection And Approva l :

The Contractor Authorized Signature: Date:

The Engineer Comments:

-
Checking and Approval by the Consultant I Sub-Consultant I Employer shall not relieve the Contractor of his Obligation in
Accordance with the Contract Documents, Requirement of Safety, and Local Authorities Regulations .

Status:

D Approved 0Approved as Noted DNot Approved 0Resubmit

Inspection By: Date: For The Engineer Date:

Appendix 05 Page 1 of 1 LCQ-Jan.2015 (Rev .O)


The Employer · Tbe Eogioeer lbe Cootractor :

elegancia
healthcare
L A AS A elegancia
C
Project Name : Korean Medical Centre (LGF+G+8+RF)

SITE INSPECTION REQUEST


Request Date: Request Reference no. Rev. No.
---
DCheck List Attached
Oshop drawing Attached
Date I Time Requested: This Inspection Requires The Following Disciplines :

--- 0Mechanical Engineer OCivil Engineer

0Electrical Engineer 0..................................


-
The Contractor QA/QC Engineer Approval The Contractor Safety Engineer Approval

- -

Contractors Authorized Signature Date:

I
Inspection Comments :
- Checking and Approval by the Engineer/ Employer shall not relieve the Contractor of his Obligations to Perform the Works in accordance with the
Contract Documents, Requirement sot Safety, and Local A uthorities rules & Regulations .

- The inspected works are assumed to be coordinated with all trades (e.g. structural, architectural, MEP, aluminum, glazing ,interior design, elevators

I'"'"''""" ., I'" Eog;"'"

I
Appe ndix 04 Page 1 of 1 LCQ-Jan. 2015 (Rev.O)
Document Reforenco
INTEGRATED MANAGEMENT SYSTEM
elegancia HAZARD IDENTIFICAT ION & RISK ASSESSMENT
PROCEDURE
Rev. No. Rev.Date
14/Jul120 22

Page Number
HAZARD IDENTIFICATION & RISK AS SESSMENT (HIRA)
1of 1

HIRANo:
HIRA- RISK ASSESSMENT : METHOD STATEMENT FOR THE INSTALLATION OF WIRING AREA I PROJECT: KOREAN MEDICA L CENTRE
0023 ACCESSORIES

Elrctrical Tool Box CLIENT : ELEGA NCIA HEALTH CARE


TASK/ Electric Drilling Machine
OPERATION I INSTALLATION OF WIRING EQ i:N Measurement Tape/ Spirit Level/ Water Levell ng
ACCESSORIES Pipe
ACTIVITY IN USE:Screw Drivers
DESCRIPTION:

W ITHOUT CONTRO LS Who affected?


I What could be
A 8

..
0
z
HARM/CONSEQUENCE (Direct involvement I interven tion
e.
w Method Statement I Site

(What can happen I go


0 ffi
TASKS HAZARDS ASSOCIATED WITH wrong) related to the activity) 0
CURRENT CONTROLS I ADDITIONAL & or SITE CONTROLS u
(What one does in EACH TASK g" SAFEGUARDS (What additional could we do
U)

logical
')
"
steps) (What can hurt one I R s Tick No. iii (What do we do to prevent to reduce the risk?)
others?) "'z incdents?) z
0 :11 Clurs tick Pua. 0
u ":::; 0
u
Ensure all personnelto attend safety
induction
Collision between

I
Employee,vistors and proper training
Procedure not Unsafe work ng pract ce. ncorect use vehictes/plants/equipmenVpedestrians at Use proper use of PPE as per the work
, consultants and Strict compliance of PTW and will be visible
of followed/understood during tools/equipments site leading to major njury.fatality and requirement Discuss method statement and risk.
deployment of new persons at site clients in
property damages the work area assessment
Carry out too box ta k prtor to start of the
work/activity

I
1 . rs,
Installation of Nurse Chances of falling from the work space and iee; vist All hand tools must be !n good cond Task
are inb<iefing to workers and safe use of hand tools that
CallSytem Falling,dripping and physical
injury
E
dripping of tools can make physical injuries of 0' 1..
tion
good condition

mp
Management need to provide
(Panels.Field Devices Eye & hand the workers ;s an s an Provision of adequate supervts ion during the task.
.etc) injuries appropriate tools/equipnients
Severe damag
., Provision and use of suitable PPEs to be in place

Avoid manual handling wherever If the lift is too heavy for one person.alwa ys ask
Muscular pain possjble, Use mechanicalmeansif somebody to assist.
Employee , vistors,
pcssible.
Manual handling of NCS Injuries resulting from manualhandl limb Disorders Assess the situation before you attempt AH workers will be trained in manualhandling techniques.
ng consultants MODERAT
mater als.tools and Sprain tolift any object. W orkers sha ll be givenintermitent break t
s1;ps and tnps and clients E
equipment. Fatigue Workers to be trained on manual me Safety monitoring during the work
handling Provision of safe/ergonomic Safety induction / toolbox talks in regu ar inteivals
work p atform.
Only trained operatives wilt erect, alter 0<
dismantle scaffold.
Fall of personnel from height Guard rails and toe boards will be
Working p atforms will be fully boarded and suitable for
Fall of material from height fitted. No person or materials will be
Employee, the work to be carried out.
Falling from Falling left on the platform whenit is being
vistors. consultan Work ng platform shallhave gua rd railsystem and
Work ;ng at he;ght (Use objects.materials.tools/equipment moved.
hazard ts and clients MODERATE erected and altered by competent scaffokters .
of aluminium Scaffotd) Overturning of saffol tower due to Only ttained operatives wtllerect. alter
Entanglement Acce ss ladders must be provtded to reach elevated work
adverse loading or unstable ground. or
Scaffold Co lapse
Collapse of scaffold tower due to dismantle scaffo
overloadin d.
To ensure the abiity of the tower, the tower
to base ration will not exceed 3.5 times its platforms.
minimum base dimensions outside the buid ng.
Toolbox talk. to operatives on working at height.

Keep all tools clean and dry


Routine inspection must be carried out
Safety induction I toolboxlalk. n regular basis to
remind worker the proper way of using the tools.
Electrocutio
Sever shock. and Employee.vistors Only competent person will use the pcwer tools. AU power tools and haodtools must be propertyinspected
n Eye Injury burn .
Use of hand and power All hand tools and power tools must be in monthly and quaterly color coded prior to use.
tools I Entanglement Damage to eyes and disabliity consultants 12 good
All defect power tools must beimmediately remove
equipment Cuts and Injury to hand and other body and clients conditton at all times
from site and replaced.
bruises parts MEDIUM Management will provide appropriate too s.
All power tools must be used as per
Musculoskeletalinju
ry manufacturer guidelines.
All operatives must be trained and competent to use
any tools.

Operatives should be given proper training on


ladder safety
Employee. vistors. Ladders must beinspected prior to Active supervision on site on daily basis prior to use.
use
Use of ladder
fall
s1;p .trip and Injury and disab
ility
consultants and 0 MODERAT
E Ladders must be secured against fall or held by
3 point of contact must be maintained while usingladder.
Damage of property Damage ladder must beimmedia tely removed from site
clients a person
for replacement and must be colour coded prior to use.
Mandatory PPE must be worn wh le using ladder

sup. tnp and tall


Poor housekeeping Employee , Ensure work areais clean and unwanted
vistors. Housekeep ng should be carried out at regular basis.
Hit I struck by I struck against obj ects or
Housekeeping Improper disposal consultants and 0 MODERA
TE
materia
l
Industrial disposal bins for different watses should be

No waste segregation materials Ensure walkway and emergency exits are


clents free marked clearly and used correcJty.
Env
ronmentalcontamination at all times

water

Employee, vistors,
General Extreme Temperature J Heat Stroke, Heat stress , Heat exhaustion. consultants and 0 MODERAT
Awarenes training on Heat Stress
Availability of faciity on site and co d
Humidity clients E
S d r he shift. Strict compilance to heat stress prevention.
c h u Work. rest cycle shall be folk>wed based on heat index and
h e r p work activ ty levet
e a i a Conduct regula r communication of temperature
d v n r leve1 to the team.
u y g t Cold drink ing water shall be available on site while job
l rotation must be adopted.
e w c o Resting shelter must be provided for workers with
o o f exhaust fan.
t r o
Training must be conducted to workers during the safety
h k l t inductfon.
e e

Std PPE: Overalls, Hard hat, Safety shoes, Reflective Vest, Safety Glasses & Average rounded 12 LOW Average rounded up:
Gloves up:

Name:
Navinkumar Bahl
EEMS Technical Manager

Akinntfes1
Tosin SR. HSE
Officer Approw d By:PM

Yousef Al Tanbakji
!_