1.0 PURPOSE................................................................................................................................................................... 3
2.0 SCOPE........................................................................................................................................................................ 3
3.0 REFERENCES............................................................................................................................................................ 3
5 .0 RESPONSIBILITIES..................................................................................................................................3
6.0 MANPOWER..............................................................................................................................................4
Pag
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
healthcare
elegancia Proj ect Na me OUT WORKS AND FINISHES OF KOREAN
The Engineer:
MEDICAL CENTRE {LGF+G+8+RF ) I \ (. A A
elegancia I'"'"'' /lr(;."l•tt:;.t:. & Ena1 C¢f'l'l9 Ccn::.u anl'!.
Main
Elegancia Fit-out Rev. No. Date
Contracto r
1.0 PURPOSE
This method statement gives guide lines contained herein to ensure that the job execution complies with the
requirement of the project requirements, specification and the Authorities concerned and serves the intended
purpose to satisfactory level. <l""'1-
2.
SCOPE
0
This Method Statement covers the nature and type of work for the Installation and insulation of HVAC GI Duct and
accessories. This procedure is to be read in conjunction with the relevant Inspection and Tes la·n (ITP) cle and
detail, outlining the responsibility and the quality verjfication to be performed by various parties.
3.0
REFERENCES f>'Y J- - \ )
• Project Specifications I Qatar Construction Specification :2014 "Electrical Works"
• Project HSE Plan
• Project Quality Plan
• Approved Material Submittal
• Approved Shop Drawing I IFC Drawing
4.0 ABBRE VATIONS/DEFENITIONS
QCS Qatar Construction Specifications
HSE Health, Safety and Environment
QA/ QC Quality Assurance and Quality Control
ITP Inspection and Test Plan
ERP Emergency Response
Plan KR Kharamaa Regulation
GI Galvanized Iron
SIR Site Inspection Request
MIR Material Inspection Request
ICL Inspection Checklist
5.1 RESPONSI BILITIES.
5.2 Project Manage r (EEMS) : Ensure that works are carried out in accordance with this method statement and
all necessary safety and protective equipment are provided a long with properly trained and qualified
personnel dedicated to work on task.
5.3 Constructio n Manager ( EEMS) : In charge shall be responsible for coordination and supervision of
construction works (activities) and construction groups, ensuring that works shall be done as per project
specification and approved drawings,and all safety measures are implemented .
5.4 QA QC Engineer ( EEMS) : Obtain consent for applicable ITP prior to use. Ensure that all inspections and tests
are carried out as per project requirement and in turn are recorded. Ensure that all equipment related are
calibrated. Maintain all quality records relevant to verification of records
5.5 Project Engineer/Site Engineer: Shall be responsible for all site activities and closed supervision for the
installation of all works . To carry out the work as approved method statement. He is also responsible to
ensure adequate equipment and tools to carry out the work and assure that disposal of debris will be as per
approved designated dis posal point.
5.6 Surveyo r (EEMS) : Responsible for all su rvey works related to levels for formation levelof blinding,
coordinates with site engineer to ensure that all required information has been provided to proceed with the
works complying with the project specification/standards.
5.7 Genera l Foreman {E EMS) : Shall be supervising closely the activities designated to them ensuring that a ll
instructions and procedures according to this method statement and Risk Assessment are str ictly followed.
5.8 Safety Officer {EEMS): Responsible for day-to-day activities on maintaining safety on site complying with
the requirements of project HSE Plan Cooperate wit h the Project team to create and maintain safe
working conditions. Assist Site Engineers and Foremen to organize the work area to perform their duties with
maximum efficiency and minimize risk to them or to equipment. Inspect equipment and tools before use to
ensure correct storage and proper utilization. Exercise emergency authority to prevent or stop unsafe
acts. Investigate
3
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
\'
healthcare
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN I \ (
The Engineer:
MEDICAL CENTRE (LGF+G+8+RF)
N .,,r:.&E; or "r .....
elegancia '""""' Project No. EF.0002 Document No.:
accidents that have occurred within incident areas. Ensure preparation and implementation of Site Safety and
Health Plan (SSHP). Maintain record of all injuries and damages on site. Submit HSE reports as require.
6.1 MANPOWER
• Ensure that all safety requirements are in place in accordance with project safety plan & Qatar
Aut hority Health & Safety codes of practice.
• All the wiring accessories materials will be transported to the site by the supplier and care shall be
taken by the storekeeper to ensure the materials are not damaged during transport.
• All the wiring accessories materials to be stored properly immediately after receiving in site.
• Special care shall be taken by the storekeeper to protect the materials from physical damage and
distortion. Material should be stored on site before installation shall be properly secured.
• On receipt of the material at site, QA/QC Engineer I Site Electrical Engineer shall inspect the
material internally and inspection shall be offered to the Consultant for approva l through
material inspection request (MIR) form.
• Ensure that wiring accessories materia ls used have passed receiving ins pection in accordance
with QAQC procedures and are not damaged or defective.
4 I
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
healthcare
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN
The Engineer:
MEDICAL CENTRE (LGF+G+8+RF ) I\CA A
elegancia I'"""' flf >t•tcasS E111J'l('Ct!l"IC}CO;i;vl!.<1n1'i
• Ens ure that all electricians and helpers are aware of the correct materials handling and installation
procedure to ensure best quality of workmanship.
• Ens ure that wiring accessories materials sha ll be fr ee from damaged and cleaned prior for
installation.
• Work shall be carried out by the site perso nnel under strict supervision and guidance of the
concerned Supervisor s/ Foreman {Electrical) and Site Electrica l Engineer.
• Obtain work permit, if requir ed.
• Ensure the work area is clean and safe to take-up the activities.
• Prior start to installation, refer to the approved shop drawings and details related to the
installation area.
• Installation of wiring accessories materials s hall be coordinated with other services for a fit for
purpose installation.
• Supervisor/ Foreman {Electrical) shall ensure equipment and correct tools are avai lable
for installation to achieve compliance with the contra ct requirements.
• Where further information I clarification in respect of Contract drawings are required the
matter shall be referred to the Contractor by means of a Request for Information {RFI).
• Work shall be carried out by the site personnel under strict s upervision and guidance of the
concerned Supervisors/ Foreman {Electrical) & Site Electrical Engineer .
• Site Inspection Request {SIR) will be prepared, signed I stamped by the Subcontractor and shall be
submitted to Main Contractor/ Consultant for witness and approval.
• Ensure prior to start of wiring accessories insta llation wiring and megger test is approved
by Engineer.
• Ensure and select the Wiring Accessories as per spec ific requirement as indicated in the
approved shop drawings and material submittal.
• After first coat of paint on wall/ceiling/floor wiring accessories will be installed as per approved
shop drawing& coordination drawing.
• All installation will be in accordance with IEE regulation/KR regulation and approved shop drawings.
• Wir ing accessories are fixed at height as shown in approved shop drawing/architectura l lay out
and coordination drawing and KR regulation.
• Clearance must be provided as per distance shown in approved shop drawing.
• Ensure setting out and s pacing between backboxes are approved by architect/Electrica l engineer
prior to proceeding with installation of wiring accessories.
• Ens ure a ll back boxes are flushed w ith plaster finish and suitable extension box shall be used in case
of gap .
• Face plate shall be install e d on ly after prop er finishing and final painting around the
wiring accessories.
• Face plate w ill be installed in s uch a way that all four edges in continuous contact with finished wall.
• Sea ling between accessor ies and wall sha ll be properly done .
• Prior to wire termination on the sockets/switches outlets back box shall be cleaned properly.
sI7
The Contractor The Client:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
health<;are
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN
The Engineer:
MEDICAL CENTRE (LGF+G+8+RF) L \ CA A
elegancia I'"'''" An,;;>11t«t$ &Enq.r'l('Cllr19Coi'Svlt;int<;
• The earthing termina lconnected to earth continuity conductor of the final sub circuit shall be
provided at every switch socket position.
• Ratings of switches and sockets should be as per approved drawings as well as specifications a nd
material submittal.
• The termina l capacity of the socket outlet should be 2x4 mm sq. and 3x2.S sq.mm rigid cable.
Constr uction of the plug is such that it can be inserted in one orientation. Earth pin makes first
breaks last.
• Pre-equipped floor boxes shall be installed flush with floor flushing.
• Ensure the conduiting to the floor boxes done properly prior to casting of screeding.
• Location and orientation of floor boxes shall be as per architectural approved layouts.
• Ensure enough distance between water source and power outlets are maintained in accordance with KR
regulations .
• While termination of socket polarity should be considered.
• All switches, sockets and other outlets shall be identified with relevant circuit reference and DB
reference. MEP Contractor to obtain approval for the sample labelling.
• In wet areas and externa l locations only weatherproof type switches wit h specified IP ratings shall be
installed as applicable and as per project specification.
10.2 General
• Before Starting repair QA/QC must ensure that the location must be identified, marked, and cleaned.
• QA/QC to ensure that all activities done in proper standards before submitting the site Inspection
Request (SIR) for Consultant's Approval.
• QA/QC must ensure before proceeding any activities inspection approval are obtained from the Engineer.
12.2 Safety Lightings: Sa fety lights will be used in case of power failure ensu ring good illumination for the personnel.
12.3 Task Lightings Adequate lightings will be provided ensuring the good illumination of the work ing area.
Task lighting will be connected to the nearest site distribut ion board which is RCD protected.
6 I7
The Contractor TheClient:
DESIGN MANAGEMENT AND BUILD OF FIT elegancia
heollhcMo
elegancia Project Name OUT WORKS AND FINISHES OF KOREAN The Engineer:
MEDICAL CENTRE (LGF+G+S+RF) I \ (,. A ,\
elegancia 11....l
"-".t•Jer:.. & e ,,;u- l"'j Cr,('l!"l ra ti
12.3 Emergency Arrangements: Site general safety procedure will be followed. In case of emergency the safety
officer w ill stop the works. He will put in to action the emergency arrangements as described in the
safety manua l.
Page 7 1 7
elegancia elegancia 1
group
"'lc:f' I
MANAGED Bv: I QA/QC Engineer ITP REVISION No.: I 00 ITP REV.DATE: I 16JULY 2022
I
CONTROL REFERENCE TO SPECIFIED REQUIREMENTS SPECIFIED REQUIREMENTS
FREQUENCY DOCUMENTS
TYPE SUB ElEGANCIA LACASA 3•• PARTY FOR INSPECTION TEST APPROVAL & TOLERANCE
o DESCRIPTION
I CON. EEMS FIT-OUT /LAB
A DOCUMENTATIQN
I
v 1 Verify Approval of Drawing, Related H H H H - I • Approved Shop Drawing • Approve d Shop Drawing
I
As per Projec t
Documents, Calculation & Method • Approved Method Statement Specification and • Approved Method
Statement Drawing Statement
I Kharamaa Regulat on
I
(MAR)
2014, Sect ion 21,
Kharamaa Regulation
!
B HSE
I
I
v 1 Verify that Risk assessment is in place H M M H - c HSE PLAN QCS 2014 RISK ASSESMENT
I and operators are wearing proper PPE .
f
I
MATER IAL INSPECTIQN
--
1 Material Delivered on Site-Check H H H - c • Project Specification & QCS 2014 As per manufacturer's Material Inspect ion Request
A I
verification, • Approved Material Submittal guidelines, QCS 2014 (MIR), Delivery Note,Material
Section 21 Test Certificate (as
-Wiring Accessories
I
applicable),Country of Or igin
I (as applicab le)
I
I
/".. D PRE-INSTALLATIQN CHECKS I
i I
1 Preparation of tools/ Equipment and s s I s s - c • Project Specification & QCS 2014 As per approved MAR, Site Inspection Request (SIR)
I materials at site • Approved Method Statement MST, and Shop
I I
Draw ing, Kharamaa
Regulation
MANAGED Bv: I QA/ QC Engineer ITP REVISION No.: I 00 ITP REV. DATE: I 16JULY 2022
10
I
DESCRIPTION ELEGANCIA CON.
i FIT-OUT
EEMS LACASA
/LAB TEST APPROVAL
I/A 1 Installation of Wiring Accesso ries H H H H - F • Project Spec ification & QCS 2014 As per approved MAR, Site Inspection Request (SIR)
MST,and Shop
I • Approved Material Submittal Inspection Check Sheet No.
I
I
• Approved Method Statement Drawing EEMS-KMC-EL-0019
I
I
I
!
I
HOLD (H) AND WITNESS (W) APPROVED
NOTES PREPARED APPRO VED
CONTROL TYPES
POINT PARTIES
FREQUENCY
RE . ,. / (CONSULTANT)
A =Approval
WIR - Inspection Request Form
LACASA
Consultant-LACASA I= Initially
""- ...?
y
R-Review Elegacia Fit-out R = Randomly --.:::::::..
T = Testing Elegancia Fit- QA/QC Mngr./ C=
W - Witness Point YOUSEF AL MARY JOY MUHAMMED
I= Inspection out Engineer Continually RUIN.E.MENESES
TA NBAKJI PARTUSA AR SHAD
S = Supervision H - Hold Point Elegancia MEP Elegancia Electro- F = Final at End
(EEMS) mechanical Services
V = Verificatio S - Surveillance
SUR Surveyor SNR. QA/QC PROJECT
1 RESP. PERSON: SNR.QA/QC LACASA
Point T-Testing ENGINEER MANAGER
SC Sub-Contrac tor
I M - Monitoring LAB/ 3'• Party Laboratory/ 31
20 -1--zrz/
I
• DATE:
Party
DESIGN MANAGEMENT AND BUILD OF FIT
_L\ CASA
elegancia OUT WORKS AND FINISHES OF KOREAN l\rchitects & Engineenng Consu1tan1s
healthcare MEDICAL CENTRE (LGF+G+8+RF )
elegancla elegancia
INSPECTION CHECKSHEET .... "
SIR No.
I
CHECK SHEET FOR INSTALLATION OF WIRING Rev No.
ACCESSORIES
Date
Description of Work:
LevelI Location:
Checked
Checked by
by
SR# ITEM Remarks
Elegancia
EEMS LACASA
Fit-out
Check delivered materials are approved and free from any physical
2
damage
Ensure face plate is flushed properly with finishe d wall and there is
11
no gap visible around it
12 Ensure the gap between two switc hes are maintained properly
Notes:
• LA elegancia
M·out
elegancia CASA
healthcare Archite cts & Engineering
Consultants
DESIGN MANAGEMENT AND BUILD OF FIT OUT WORKS AND
Project:
FINISHES OF KOREAN MEDICAL CENTRE (LGF+G+S+RF)
Material Description :
Manufacturer:
Supplier:
Delivery Date:
Documents/specification/Drawings BOQ etc.,
for reference:
Identificat ion of Suppliers: Lot No.:
State of Packing:
CONTRACTOR :
EEMS Elegancia Fit-out LACASA
Signature:
Name:
Date:
Consultant's Comments:
Action to be taken:
-
Location Of Use:
---
---
Date Of Delivery: DeliveD'. Note Number: Attachments/Enclosures:
-
Checking and Approval by the Consultant I Sub-Consultant I Employer shall not relieve the Contractor of his Obligation in
Accordance with the Contract Documents, Requirement of Safety, and Local Authorities Regulations .
Status:
elegancia
healthcare
L A AS A elegancia
C
Project Name : Korean Medical Centre (LGF+G+8+RF)
- -
I
Inspection Comments :
- Checking and Approval by the Engineer/ Employer shall not relieve the Contractor of his Obligations to Perform the Works in accordance with the
Contract Documents, Requirement sot Safety, and Local A uthorities rules & Regulations .
- The inspected works are assumed to be coordinated with all trades (e.g. structural, architectural, MEP, aluminum, glazing ,interior design, elevators
I
Appe ndix 04 Page 1 of 1 LCQ-Jan. 2015 (Rev.O)
Document Reforenco
INTEGRATED MANAGEMENT SYSTEM
elegancia HAZARD IDENTIFICAT ION & RISK ASSESSMENT
PROCEDURE
Rev. No. Rev.Date
14/Jul120 22
Page Number
HAZARD IDENTIFICATION & RISK AS SESSMENT (HIRA)
1of 1
HIRANo:
HIRA- RISK ASSESSMENT : METHOD STATEMENT FOR THE INSTALLATION OF WIRING AREA I PROJECT: KOREAN MEDICA L CENTRE
0023 ACCESSORIES
..
0
z
HARM/CONSEQUENCE (Direct involvement I interven tion
e.
w Method Statement I Site
logical
')
"
steps) (What can hurt one I R s Tick No. iii (What do we do to prevent to reduce the risk?)
others?) "'z incdents?) z
0 :11 Clurs tick Pua. 0
u ":::; 0
u
Ensure all personnelto attend safety
induction
Collision between
I
Employee,vistors and proper training
Procedure not Unsafe work ng pract ce. ncorect use vehictes/plants/equipmenVpedestrians at Use proper use of PPE as per the work
, consultants and Strict compliance of PTW and will be visible
of followed/understood during tools/equipments site leading to major njury.fatality and requirement Discuss method statement and risk.
deployment of new persons at site clients in
property damages the work area assessment
Carry out too box ta k prtor to start of the
work/activity
I
1 . rs,
Installation of Nurse Chances of falling from the work space and iee; vist All hand tools must be !n good cond Task
are inb<iefing to workers and safe use of hand tools that
CallSytem Falling,dripping and physical
injury
E
dripping of tools can make physical injuries of 0' 1..
tion
good condition
mp
Management need to provide
(Panels.Field Devices Eye & hand the workers ;s an s an Provision of adequate supervts ion during the task.
.etc) injuries appropriate tools/equipnients
Severe damag
., Provision and use of suitable PPEs to be in place
Avoid manual handling wherever If the lift is too heavy for one person.alwa ys ask
Muscular pain possjble, Use mechanicalmeansif somebody to assist.
Employee , vistors,
pcssible.
Manual handling of NCS Injuries resulting from manualhandl limb Disorders Assess the situation before you attempt AH workers will be trained in manualhandling techniques.
ng consultants MODERAT
mater als.tools and Sprain tolift any object. W orkers sha ll be givenintermitent break t
s1;ps and tnps and clients E
equipment. Fatigue Workers to be trained on manual me Safety monitoring during the work
handling Provision of safe/ergonomic Safety induction / toolbox talks in regu ar inteivals
work p atform.
Only trained operatives wilt erect, alter 0<
dismantle scaffold.
Fall of personnel from height Guard rails and toe boards will be
Working p atforms will be fully boarded and suitable for
Fall of material from height fitted. No person or materials will be
Employee, the work to be carried out.
Falling from Falling left on the platform whenit is being
vistors. consultan Work ng platform shallhave gua rd railsystem and
Work ;ng at he;ght (Use objects.materials.tools/equipment moved.
hazard ts and clients MODERATE erected and altered by competent scaffokters .
of aluminium Scaffotd) Overturning of saffol tower due to Only ttained operatives wtllerect. alter
Entanglement Acce ss ladders must be provtded to reach elevated work
adverse loading or unstable ground. or
Scaffold Co lapse
Collapse of scaffold tower due to dismantle scaffo
overloadin d.
To ensure the abiity of the tower, the tower
to base ration will not exceed 3.5 times its platforms.
minimum base dimensions outside the buid ng.
Toolbox talk. to operatives on working at height.
water
Employee, vistors,
General Extreme Temperature J Heat Stroke, Heat stress , Heat exhaustion. consultants and 0 MODERAT
Awarenes training on Heat Stress
Availability of faciity on site and co d
Humidity clients E
S d r he shift. Strict compilance to heat stress prevention.
c h u Work. rest cycle shall be folk>wed based on heat index and
h e r p work activ ty levet
e a i a Conduct regula r communication of temperature
d v n r leve1 to the team.
u y g t Cold drink ing water shall be available on site while job
l rotation must be adopted.
e w c o Resting shelter must be provided for workers with
o o f exhaust fan.
t r o
Training must be conducted to workers during the safety
h k l t inductfon.
e e
Std PPE: Overalls, Hard hat, Safety shoes, Reflective Vest, Safety Glasses & Average rounded 12 LOW Average rounded up:
Gloves up:
Name:
Navinkumar Bahl
EEMS Technical Manager
Akinntfes1
Tosin SR. HSE
Officer Approw d By:PM
Yousef Al Tanbakji
!_