AIRCRAFT MAINTENANCE HANGARS PROJECT
KING ABDULAZIZ INTERNATIONAL AIRPORT - JEDDAH

Contractor: TAL JV (TAV - AL RAJHI-HLG) Checklist No.: 433-DAR-TAL-M-CL-0006-01


Contract No: 4600000433 Date of Inspection:
Contract Title: SAEI Aircraft Maintenance Hangars Project Jeddah/KSA RIW Ref. No.:

Checklist for Installation of Electrical Conduits and Boxes


Work Location:
Subcontractor TAL JV Engineer
DESCRIPTION QC Representative Inspector / Engineer Inspector / Engineer Remark(s)
Pass Fail Pass Fail Pass Fail

I. PRE-CONSTRUCTIONl
Material submittals for electrical conduits (EMT, IMC,
1 FMC and PVC), fittings and boxes are approved by the
Engineer.
Shopdrawings are available and have received
2 approval from the Engineer.

Method Statement for installation of electrical conduits


3 and boxes is approved by the Engineer.

II. SITE DELIVERY AND STORAGE


Incoming electrical conduits, fittings and boxes and
1 related accessories are QC inspected and received
approval from the Engineer.

Electrical conduits, fittings, boxes and accessories are


2
stored as per recommendation of the manufacturer.
III INSTALLATION
A. SURFACE MOUNTED ELECTRICAL METALLIC TUBING (EMT)
Layout of conduit and boxes is as per approved
1
shopdrawing.
Installation of conduit support / straps is as per
2 approved
Method Statement
Installation of boxes is as per approved Method
3 Statement

Joint connection of conduits and boxes is as per


4 approved Method Statement.

B. INTERMEDIATE METAL CONDUIT (IMC)


Layout of conduit and boxes is as per approved
1
shopdrawing.
Installation of conduit support / straps is as per
2 approved
Method Statement
Installation of boxes is as per approved Method
3 Statement

Joint connection of conduits and boxes is as per


4 approved Method Statement.

C. PVC CONDUIT

Layout of conduit and boxes is as per approved


1
shopdrawing.
Installation of conduit support / straps is as per
2 approved
Method Statement
Installation of boxes is as per approved Method
3 Statement

Joint connection of conduits and boxes is as per


4 approved Method Statement.

D. FLEXIBLE METALLIC CONDUIT (FMC)


FMC placement and connection is as per approved
1 Method Statement.

Page 1 of 2
THE ENGINEER: THE OWNER: THE CONTRACTOR:

THE SUB CONTRACTOR:


AIRCRAFT MAINTENANCE HANGARS PROJECT
KING ABDULAZIZ INTERNATIONAL AIRPORT - JEDDAH

Contractor: TAL JV (TAV - AL RAJHI-HLG) Checklist No.: 433-DAR-TAL-M-CL-0006-01


Contract No: 4600000433 Date of Inspection:
Contract Title: SAEI Aircraft Maintenance Hangars Project Jeddah/KSA RIW Ref. No.:

Checklist for Installation of Electrical Conduits and Boxes


Work Location:
Subcontractor TAL JV Engineer
DESCRIPTION QC Representative Inspector / Engineer Inspector / Engineer Remark(s)
Pass Fail Pass Fail Pass Fail
Comments: Comments:

Subcontractor Representative TAL JV QC Engineer / Inspector


Name: Name:
Position: Position:
Signature: Signature:
Date: Date:
Comments:

THE ENGINEER's Representative


Name:
Position:
Signature:
Date:

Page 2 of 2