Project Manager/Consultant Owner: MEP Contractor, PK# 3

Project:
ETLAL RESIDENCE

SUBMITTAL
Submittal : DOC-ZP-963 Date : 20-Apr-20
Sub Contractor Name: ZAMIL PROJECTS Rev: 1 Package:

DELIVERY REMARKS

To: M/s. Projacs International Courier SHOP DRAWING

Recipient Messenger SAMPLE

For Sub Contractor: Signature: Other .


MANUFACTURER'S DATA

FOR CM USE ONLY: Arch Str. Elec. Mech. CERTIFICATES

Rec'd from Sub Contr.: / / Sign : GUARANTEES

Out to Client : / / Client Out to Engrs: / / CALCULATIONS

OTHER
In from Client / / In from Engrs: / /

Out to Sub Contractor: / /

Dwg. / Spec. Code


Rev. Qty Description Remark
Reference Submittal Action

1 2
DISTRIBUTION PANEL BOARD
(DB-K.GAR 1/2 & 2/2 )
B

Remarks:

Approved as row tyoe as below noted :


1- Refer to the comments on L.P.S .
2- DB-K.GAR 1/2 should be supplied from Met 212 by spare M.C.B. 30 AT /100AF amp.according to S.L.D.in design drawings.
3- DB-K.GAR 2/2 should be supplied from Met 212 by spare M.C.B. 150 AT /160AF amp.according to S.L.D.in design drawings.
4- Coordinate with MEP Loads as final approved Loads without cost or time impact .
5- Technical submittal to above mentioned should submit for final approval before manufacturing .

Engineer's Signature Reviewer's Signature PM's Signature

A Approved B Approved As Noted C Resubmit As Noted D Rejected E For Information


Approval, corrections or comments made relative to submittals during this review do not relieve the Contractor from compliance with the requirements of the drawings or specifications.
This check is only for review of general performance with the design concept of the project and general compliance with the information given in the Contract documents.
The Contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction,
coordinating his work with that of other trades, and performing his work in a safe, timely, and satisfactory manner.

Distribution: Sub Contractor's Signature :

CM Site CM OFF. SUB CONTRACTOR Received For :

Date :