TRANSMITTAL/SUBMITTAL FORM

Transmittal/Submittal No. Rev.


TRANSMISSION OF DRAWINGS, DOCUMENTS, SAMPLES, ETC. 0004 0
Date: 2/26/2023
PROJECT MANAGER: PMP SERVICES SUBMITTED FOR 1
APPROVAL 1
YOUR INFORMATION 2
Package Title PACKAGE NO. 3
The Water MarQ (Fence) TWM-Fence-01 ACTION

TO: PMP SERVICES APPROVED A

Cc. The MarQ APPROVED AS NOTED B

We are sending here documents of a material submittal of Bituminous Waterproofing Emulsions REVISE AND RESUBMIT C
FOR INFORMATION R
Dwgs., Specs. DOCUMENT / DESCRIPTION TYPE* CODE
ITEM QTY.
or BOQ Ref. DRAWING NO. SUBMIT. ACTION

CMB (Chemicals for Modern Building)


Bituminous Waterproofing Emulsions
As per attached documents

COPIES: FOR CONTRACTOR Date : 2/26/2023

Name : Mohamed Nasser Position: Construction Manager

Consultant to enter Action Codes and Remarks, and return to Contractor after PM final approval.
REMARKS:

Correction or comments made relative to submittals during this review DO NOT relieve the contractor from compliance with the requirements of drawings and specifications. This check is only for review of
general conformance with design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating all
quantities and dimensions selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner.

COPIES For Consultant : Date:


Name: Signture:
Position:
For PM. : Date:
Name: Signture:
Position:
(1) Code to be entered by contractor * TYPE: SD - Shop Drawings GT - Guarantee / Warrantee TI - Test / Inspection CA - Calculations

(2) Code to be entered by Designer / Consultant SM - Sample MD - Manufacturer's Data CT - Certificates OT - Others
Burj Dubai Development
THE BURJ TOWER

SPECIFICATION COMPARISON FORM

Transmittal No: (1) Rev: (2)

Contract: (4) Package No: (5) Spec Reference: (3)

Contractor: (6)

SPECIFICATION REQUIREMENTS CONTRACTOR PROPOSAL REMARKS

(7) (8) (9)

Form : T40
Burj Dubai Development
THE BURJ TOWER

SAMPLE TAG

Transmittal No: (1) Rev: (2) Date: (3)

Package No: (4)

Contract :

Contractor: (5)

Sample Description:

(6) To be Filled in

Specification Reference: by Contractor


(7)

Contractor's Signature:

(8)

(9) A- ACTION

B- ACTION To be Filled in

C- ACTION by Consultant

Date:
(10) (11)

Form : T30