ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Procedure for Submission of Document

SUBMITTAL FORM

Submittal No. Date:

Location Type No. Rev.


ITD-SINOHYDRO JV MST CP02 31-Dec-17
DPT GN 005 02

Purpose R o A þ
Inf. Rec. o o
Title : Method Statement for Quality Control of Concrete To : Mr. Takayuki FUJITOMI, Acting Team Leader

The Engineer, NKDM Association, General Consultants (GC) to


DMRTDP, House No. 8/B, Road No. 29,Gulshan–1, Dhaka–
Discipline : Method Statement 1212

Spec. Section/Clause: Particular Specifications, Part 02, Clause 2,3,4 and 9

Sub-Contractor/Supplier:

For Contractor Use For Employer or Employer's Representative Use


Date Received :

Date
Item No. Description Rev. Review Status Employer / Rep.
Returned
NOO NONOC
NONO
A B C

1 Contractor's Response to the Engineer's Comments


(Ref.No.: NKDM-CP02-CON-2017/0074 Dated 27 Nov 2017)

(Doc.No. ITD-SINOHYDRO JV/CP02/MS/ST005, Rev.02)

2 Method Statement for Quality Control of Concrete 02


(Doc.No. ITD-SINOHYDRO JV/CP02/MS/ST005, Rev.02)

Detailed Comment Review Attached Ref.No.:


All items submitted have been checked, reviewed and co-ordinated by the Contractor. They are in
conformance with the requirements of the Contract Document, except as noted, and are approved
by the Contractor for this Project. Reviewed and Status Confirmed By:

Prepared by : Reviewed and Approved : ( )

(Mr.Wang Wenliang) ( Mr. Zhu Xiaofan ) Title:


QA. Manager Deputy Project Manager Date:
(Authorized)
Date : 31/12/2017 Date : 31/12/2017
Note : Purpose NONO : Notice of No Objection

R = For Review NOO : Notice of Objection (With “A” Comments)

A = For Approval NONOC : Notice of No Objection with Comments (With “B” and/or “C” Comments)

Inf. = For Information

Rec = For Record Note: Acceptance of ER does not relieve the Contractor of its Contractual Obligations

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/PR011/01 No. 02 Date: November 22, 2017 1 of 1
Dhaka Mass Rapid Transit Development Project

Contract No. CP-02

COMMENTS RESPONSE FORM


Ref.No.: NKDM-CP02-CON-2017/0074 Dated 27 Nov 2017 and Received thorugh ACONEX on 28 Nov 2017

Subject: Method Statement for Quality Control of Concrete

Doc.No.:ITD-SINOHYDRO JV/CP02/MS/ST005, Rev.02 Date: 31 December 2017

No. Reference Engineer's Comments Answers of Contractor


Please include clause 2.1.5 quality control of concrete
1 Section 5.4 1.general "Quality control of concrete" was included in scetion 5.4.1
2.standard of control

Please include clause 2.1.6 testing of concrete for structure


1.general
"Testing of concrete for structure"was shown in scetion 5.4.2
2 Section 5.4 2.standard deviation
3.test piece A cylinder
4.test piece B cylinder
"Specification for sampling and testing"was shown in scetion
3 Section 5.4 Please include clause 2.1.7 specification for sampling and testing 5.4.3

"Failure to meet requirement"was shown in scetion 5.4.4


4 Section 5.4 Please include clause 2.1.8 failure to meet requirement

Prepared by: Checked by:


DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT
CONSTRUCTION OF CIVIL AND BUILDING WORKS
IN UTTARA DEPOT FOR MRT LINE 6
CONTRACT PACKAGE CP-02

METHOD STATEMENT
FOR QUALITY CONTROL OF CONCRETE

Document No. ITD-SINOHYDRO JV/CP02/MS/ST005, Rev. 02

Employer
Dhaka Mass Transit Company Limited
A Government Owned Company
Level-14, Probashi Kalyan Bhaban
71-72, Old Elephant Road
Eskaton Gardens, Dhaka-1000, Bangladesh

PREPARED BY
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete

ITD-SINOHYDRO JV
DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT
CONSTRUCTION OF CIVIL AND BUILDING WORKS
IN UTTARA DEPOT FOR MRT LINE 6
CONTRACT NO. CP-02

ITD-SINOHYDRO JV ITD-SINOHYDRO JV/CP02/MS/ST005


DOCUMENT NO.:
REVISION: 02
TITLE: METHOD STATEMENT FOR QUALITY CONTROL OF
CONCRETE
AUTHORISATION
Prepared by: Reviewed by: Approved by:

…………………………………. …………………………………. ………………………………….


(Engr.Sherin Akter) (Mr.Shang Qingfeng) (Mr. Zhu Xiaofan)
QC Engineer Chief Engineer Deputy Project Manager
Signed on behalf of
(PM: Mr. Thitinan Panpila)
Date: 31/12/2017 Date: 31/12/2017
Date: 31/12/2017
This is a controlled document which shall not be copied without the permission of the Document Controller.
Note: A CONTROLLED copy is valid only if stamped “C” in red

Uncontrolled copies shall NOT be updated or amended.


Please refer to a controlled copy or check for amendments before use.

AMENDMENT/RELEASE RECORD
Revision Issue Description of Amendment/Release Effective Date
No. Type

01 C For Employer Representative's Approval November 08, 2017

Revised as per Engineer’s Letter No. NKDM-CP02-CON-2017/0074


02 C December 31, 2017
dated 27 Nov 2017 & Resubmit for Approval

Type of "A" For Acknowledgement & Information & Reference "R" For Internal Review & Comment
Issuing: "C" For Employer Representative's Approval "U" For Internal Using and/or Replacing the Existing One.

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 02 Date: December 31, 2017 1 of 7
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete

CONTENTS

1.0 GENERAL/SCOPE............................................................................................................................3

2.0SPECIFICATIONS AND REFERENCE DOCUMENTS..................................................................3

3.0MATERIALS AND CONCRETE......................................................................................................... 3

4.0RESOURCE, EQUIPMENT AND FACILITIES................................................................................ 3

5.0PROCEDURE........................................................................................................................................ 3
5.1Concrete Order Process...................................................................................................................3
5.2Incoming Inspection Process...........................................................................................................4
5.3Test Result Record............................................................................................................................4
5.4Test Result of Materials...................................................................................................................4

6.0SAFETY PROVISIONS........................................................................................................................ 6

7.0ENVIRONMENTAL PROVISIONS..................................................................................................... 7

8.0TRAFFIC MANAGEMENT.................................................................................................................. 7

9.0ATTACHMENTS ............................................................................................................................7
Attachment 1 : Inspection and Test Plan for Method Statement for Quality Control of Concrete
Material..................................................................................................................................................... 7
Attachment 2 : Quality Control Checklist for Quality Control of Concrete Material...................... 7

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 02 Date: December 31, 2017 2 of 7
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete

1.0 GENERAL/SCOPE

This procedure is applicable for ready-mixed concrete produced from the approved
batching plants which shall supply the concrete for the permanent works of the
construction of Dhaka Mass Rapid Transit Development Project, Contract No. CP-02.

2.0 SPECIFICATIONS AND REFERENCE DOCUMENTS

Relevant specification is contained in Work Requirement, Section XII: Specification –


Particular Specifications, Part 02, Sub Clauses 2: Concrete Work, Sub Clauses 3: Piling
works(cast-in-situ), Sub Clauses 4: Reinforcement for Structure, and Sub Clauses 9 :
Concrete works for miscellaneous civil structure.

3.0 MATERIALS AND CONCRETE

Materials and Concrete this operation shall be listed as below :

a. Ordinary Portland Cement type 1 conform to AASHTO M85

b. Fine Aggregate conform to AASHTO M6

c. Coarse Aggregate conform to AASHTO M80

d. Water used mixing shell be tested by described in AASHTO T26

e. Admixture conform to ASTM C494,ASTM C979.

f. Reinforcement conform to BDS ISO 6953-2 or ASTM A615

g. Concrete to be used for this project is Grade 30, Grade 25, and Grade 15.

4.0 RESOURCE, EQUIPMENT AND FACILITIES

Equipment and tools for this operation shall be listed as below:


a. Inspection and Test Plan for Method Statement for Concrete and Materials as
detailed in Attachment 1 : Inspection and Test Plan .
b. Quality Control Checklist for Quality Control of Concrete Material as detailed in
Attachment 2 : Checklist Form

5.0 PROCEDURE

5.1 Concrete Order Process

According to the time frame, if the respective engineer checks the works, and ensures
that the reinforcing bars installation, formwork installation and cleanness have been
accomplished as per the approved construction technical drawings and specifications,
he shall issue the concrete order form, as shown in Form No. ITD-SINOHYDRO
JV/CP02/MS/ST005/01 to request ready-mixed concrete from the batching plant.

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 02 Date: December 31, 2017 3 of 7
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete

5.2 Incoming Inspection Process


a. When the ready-mixed concrete truck arrives on-site, the delivery concrete code
shall be verified in comparison with the concrete order form issued. The slump
shall be tested as per specified requirements as shown in Form No. ITD-
SINOHYDRO JV/CP02/MS/ST005/03 to concrete placing inspection and
laboratory test report.
b. Quality of Ready mixed Concrete shall be sampled and tested for the quality
control of fresh concrete and sampling specimens as shown on the Inspection
and Test Plan. The identification tags, such as location, gridline, type of
placement work and placement date shall be marked on all concrete cylinders, as
shown in Form No. ITD-SINOHYDRO JV/CP02/MS/ST005/02 to Identification
Tag.
Once the concrete cylinder are met 24 hours, they shall be delivered to concrete
curing tank. The information given in the tags shall be immediately transferred to
the concrete cylinders using permanent marking prior to curing.
The cylinder curing process shall be performed and controlled in accordance with
the associated documents due to the fact that all cylinders represent the concrete
placed in those areas.
c. Once the compressive strength test of cylinders reach the specified date, they
shall be delivered to the Central Laboratory for testing. Relevant concrete
cylinders shall be identification tag and the recorded in specimen testing record in
Form No.ITD-SINOHYDRO JV/CP02/MS/ST005/04 to Cylindrical compressive
strength test report.
d. Summary cylindrical compressive strength test report completed age 28 days
shall be recorded in Form No. ITD-SINOHYDRO JV/CP02/MS/ST005/05 to
compressive strength of concrete.

5.3 Test Result Record


a. If the respective engineer participates during the testing process, the read out
data shall be recorded by him in order to verify with the results to be shown in the
corresponding certificates.
b. Where the concrete cylinders fail to meet the requirements, the Procedure for
Control of Nonconforming Product shall be implemented.
c. Once completion, all information shown in the test certificates shall be verified to
ensure that all cylinder test results are in full compliance with the specified
requirements prior to the certificate documents being retained as required by
quality records.

Note: 1. Quality control for ready-mixed concrete is prescribed in the ITP attached 1.

5.4 Test Result of Materials


Quality control test of all materials is prescribed in the Inspection and Test Plan in as
attached 1.

5.4.1 QUALITY CONTROL OF CONCRETE

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 02 Date: December 31, 2017 4 of 7
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete

TABLE - 1 - 1
Gread of Minimum cement Range of cores Max,water Minimum 28 days cylinder strength
concrete content in concrete aggregate cement ratio N/mm2
(KG/M3) Preliminary tests Site test
G30 300 20mm-No.4 0.45 38 30
G25 275 20mm-No.4 0.50 33 25
G15 225 - - 23 15

Works concrete shall be tested and the results assessed as specified,the standard of
concrete (other than G15) and structural concrete G30 shall be such that;
a. The average of all sets of three consecutive strength tests at 28 days shall not be
less than the minimum strength for the grade in question as specified in table 1.1-1
b. No individual strength test (average of two cylinders) falls below the required 28 day
strength by more than 3.5 N/mm2.
c. When the control standard has not been realized, the test value of any specimen is
less than 85% of the minimum working intensity specified in table 1.1-1, and remedial
measures should be taken according to the measures directed by the engineer.
d. initial testes shall be carried out on test piece A cylinders test at 28 days,report the
test data to the engineer ,determine the ratio according to the approval of the
engineer.also the test piece A cylinders tested at 7 days and likewise subjected to
statstical analysis shall be used to determine the relashionship between the 7 days
and 28 days strengths

5.4.2 TESTING QUALITY OF CONCRETE FOR STRUCTURE

a. The requirement of the quality control of concrete in association with its mix proportion
shall be such that not more than 2.5% of works concrete cylinders tested fall below the
appropriate minimum strength given in table 1.1-1 , find the mean value and the
"standard deviation" of the available test results. not more than 2.5% of the test results
shall have strength less than the mean value minus 2 standard deviations. The
standard deviation shall be obtained from not less than 30 test results for any one
series of test cylinders in which each result representing separate batches of similar
concrete produced by the same plant under the same supervision.
b. The standard deviation is calculated by summing the squares of the differences of the
average value from their individual test values dividing by one less than the number of
test values and taking the square root of the result It is expressed in the same units as
the test results themselves. If S = Standard Deviation;
(X1-M)2 +(X2-M)2+....... +(Xn-M)2
(X1 + X2 +........ + Xn)/ n
c. Test Piece "A" Cylinders shall be used to determine the general standard of quality
control of the 7 and 28 day strengths of the concrete for a particular grade and mix of
concrete. The concrete shall be deemed to comply with these Specifications: M28 -
2.0 (S) > L28,Where M28 = the average value of the 28 day test results L28 = the
required 28 day cylinder strength as given in table 1.1-1.When the Engineer is
satisfied that sufficient cylinder test results from Test Piece "A" cylinders are available
to establish the ratio: Average Cylinder Strength at 7 days Average Cylinder Strength
at 28 days the concrete shall be deemed to comply with the Specifications for quality
control purposes if: M7 - 2.0 (S) > L7,The value of Y shall be determined from time to
time at the direction of the Engineer as

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 02 Date: December 31, 2017 5 of 7
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete

d. Test Piece "B" Cylinders,The appropriate strength requirements of each set of three
cylinder of test piece B shall be deemed to be satisfied if none of the three cylinders is
below the specified cylinder strength or the average strength of the three cylinders is
not less than the specified cylinder strength and the difference between the greatest
and the least strength of the cylinders is not greater than 20% of the average
strength,for the test piece B cylinders the specified cylinders strength shall be as
directed by the engineer to satisfy the requirement appropriate

5.4.3 SPECIFICATION FOR SAMPLING AND TESTING

Sampling and testing shall be in accordance with the following specifications:


a. Compressive Strength of Cylindrical Concrete Specimens AASHTO Test Method T22
b. Making and Curing Concrete Compressive and Flexural Strength Test Specimens in
the Field AASHTO Test Method T23
c. Obtaining and Testing Drilled Cores and Sawed Beams of Concrete ASHTO Test
Method T24
d. Sieve Analysis of Fine and Coarse Aggregates AASHTO Test Method T27
e. Specific Gravity and Absorption of Fine Aggregate AASHTO Test Method T84
f. Specific Gravity and Absorption of Coarse Aggregate AASHTO Test Method T85
g. Slump of Hydraulic Cement Concrete AASHTO Test Method T119
h. Unit Weight, Yield and Air Content (Gravimetric) of Concrete AASHTO Test Method
T121
i. Making and Curing Concrete Test Specimens in the laboratory AASHTO Test
Method T126
j. Sampling Freshly Mixed Concrete AASHTO Test Method T141
k. Air Content of Freshly Mixed Concrete AASHTO Test Method T152 by the Pressure
Method

5.4.4 FAILURE TO MEET REQUIREMENTS


a. If the strength of the testes piece is lower than the specified value ,the engineer
has the right to require the replacement of the mixture ratio , in addition , the
engineer has the right to dismantle the concrete corresponding to the unqualified
specimens , and reinforce the structure parts corresponding specimens ,
engineer can ask for replacement,
b. When the tests on control piece of concrete fall below the required strength,the
engineer shall permit check test strength to be made by means of typical cores
drilled from the structure in accordance with AASHTO test method T24,in case
of failure, Engineer may require at the Contractor's expense, load tests on any
portions of structure in which such concrete was used。
c. Slabs or beams, under load test, shall be subject to a total load, including dead
loads already acting, equivalent to 0.85{1.4(DL) + 1.7(LL)}. The loads shall be
applied uniformly over the portion being tested in an approved manner and left in
position for a 24-hour period and the deflection must not exceed the value:

D= L*L/20000H

6.0 SAFETY PROVISIONS

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 02 Date: December 31, 2017 6 of 7
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete

a. All workers entering the construction areas will be provided with safety induction
training.
b. All workers will use personal protective equipment during work process.

7.0 ENVIRONMENTAL PROVISIONS


a. The work areas will be carried out with sufficient environmental protection.
b. The debris arising from the concrete activity shall be regularly cleared and
removed out.

8.0 TRAFFIC MANAGEMENT

N/A

9.0 ATTACHMENTS

Attachment 1 : Inspection and Test Plan for Method Statement for Quality Control of
Concrete
Attachment 2 : Quality Control Checklist for Quality Control of Concrete

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 02 Date: December 31, 2017 7 of 7
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete

ATTACHMENT 1
INSPECTION AND TEST PLAN FOR METHOD STATEMENT
FOR QUALITY CONTROL OF CONCRETE
Project :
ITD-SINOHYDRO JV
The Dhaka Mass Rapid Transit Development Project
INSPECTION AND TEST PLAN
FOR
Contract No. CP-02 Quality System : ISO 9001
Item Description : N/A METHOD STATEMENT FOR QUALITY Document Type : Controlled
Location/Area : N/A CONTROL FOR CONCRETE Date : November 6, 2017
Storage Location: N/A Prepared by : Mr.Wang Wenliang
Specification No : Work Requirement, Section XI: Specification – Particular Specifications, Approved by : Mr. Thitinan Panpila
Part 02, Sub Clauses 2: Concrete work ER Approved : N/A
Inspection Activity Document
Frequency of
No. Activity Inspection and Tests Required Form Verification/Acceptance Acceptance Criteria
Inspection/Test Subcont. Vendor ITD ER
Checklist No. Sign Off By
1 Submission - Material, Shop Drawing, Method Statement N/A N/A N/A N/A N/A N/A
- Mock up Inspection N/A N/A N/A N/A N/A N/A
2 Materials - Appoved Ready Mixed Concrete N/A X X W/O N/A EN/FM Refer to Trial Mix report, Material Submission

3 Equipment - Mold, Measuring tap, Plastic sheet, Straight bar and Slump cones N/A X X W/O N/A EN/FM Refer to item 2 in this Method Statement

4 Interface Coordination N/A N/A N/A N/A N/A N/A N/A N/A
ITD-SINOHYDRO
5 In-process Inspection - Concrete order N/A X X W/O EN/FM Follow to drawings
JV/CP02/MS/ST005/01
ITD-SINOHYDRO
- Concrete Slump Test N/A X X W/O EN/FM AASHTO T119 and Volume 4, Part 2,Clauses 2, item 2.1.3
JV/CP02/MS/ST005/01
ITD-SINOHYDRO 32 °C (Refer to Volume 4, Part 2,Clauses 2, item 2.3.1 (2) and
- Fresh Concrete temperature (Inspection on site prior to placement) N/A X X W/O EN/FM
JV/CP02/MS/ST005/03 ACI305.1-06
ITD-SINOHYDRO ≤ 2 hr. (Based on the experience of concrete work performed in the
- Period from Batching Plant to placement (each truck) N/A X X W/O EN/FM
JV/CP02/MS/ST005/03 hot weather country zone)
3 ITD-SINOHYDRO
- Cylinder make (3 cylinders for every 30 m /Each class) N/A X X W/O EN/FM Volume 4, Part 2,Clauses 2, item 2.1.4
JV/CP02/MS/ST005/02,03
ITD-SINOHYDRO
- At least 3 cylinders shall be taken for each class of concrete placed each day. N/A X X W/O EN/FM Volume 4, Part 2,Clauses 2, item 2.1.4
JV/CP02/MS/ST005/02,03

Symbol Legend Symbol Legend


H Mandatory Hold Point-Hold Until Approved D Document or Record Required
W/O Witness Point-Optional X Subcontract Inspection
W Witness Point R Review Point
S/......... Surveillance Point - Random ITP/Each Quantity N/A Not Applicable
N Notify ER (Request for Inspection)

Document No. Revision Page No.


ITP/CP02/MS/ST005/01 No. 01 Date: November 6, 2017 1 of 1
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete

ATTACHMENT 2
QUALITY CONTROL CHECKLIST FOR QUALITY CONTROL
OF CONCRETE
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
Method Statement for Quality Control for Concrete

No.
Concrete Order Form
Batching Plant: Order Date:
Fax No./Email Address: Attention:
Attention:

Location/Work Type of Pouring Method


Item Concrete Code Slump Gridline Level Required Date Required Time Quantity (m3) Remarks
Area Structure
Pump Bucket

Requested by:
( )

Approved by:
( )
Note: Site Engineer shall phone/email to the batching plant for confirming the Site Engineer
required time prior to ready-mixed concrete being supplied.

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/01 No. 01 Date: November 6, 2017 1 of 1
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
Method Statement for Quality Control for Concrete

Dhaka Mass Rapid Transit Development Project


Contract No. CP-02

Identification Tag
Type of Structure:
Level/Gridline:
Cast Date: Time :
Ticket No.:
Concrete Code:
Compressive Strength: N/mm2
Name/Plant:
Collected by:
Code No.:
Form No. ITD-SINOHYDRO JV/CP02/MS/ST005/02, Rev.01

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/02 No. 01 Date: November 6, 2017 1 of 1
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
Method Statement for Quality Control for Concrete

Concrete Control on Site

Concrete Supplied by: Concrete Code: Casting Date:


Type of Structure: Level/Grid Line:

Concrete Delivery Casting


Item Quantity Batching Arrival Slump Unloading Temperature (°C) Remarks
Truck No. Delivery Ticket No. 3 Batching Plant
(m ) Time Time (cm) Start Finish Air Concrete

Recorded by: Verified by: Witnessed by:


( ) ( ) ( )
Concrete's Supplier ITD-SINOHYDRO JV's QC Engineer/Staff NKDM

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/03 No. 01 Date: November 6, 2017 1 of 1
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
Method Statement for Quality Control for Concrete

Specimen Testing Status

Code Certificate
Age of Test Result
Item Part of Structure Casting Date Testing Date Number of 2 Received Remarks
Specimen (N/mm )
Specimen Date

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/04 No. 01 Date: November 6, 2017 1 of 1
View publication stats

ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project


Contract No. CP-02

Compressive Strength Test of Concrete Cylinder


Concrete Class : Test Method AASHTO-T22

Name of Structure : Lab. Ref. No.

Component of Structure : Cement (Brand) :

Sampling Place : Cement Content (kg/m3)

Date of Casting : Water Cement Ratio :

Days Test Result : Date of Crushing:


Cylinder Cylinder Size Observed Load Actual Compressive
Area (mm2)
No. (mm) (KN) Load(KN) Strength (N/mm2)

Average
Days Test Result : Date of Crushing:

Average

Calibration Equation:

Average Days Crushing Strength : N/mm2

Average Days Crushing Strength : N/mm2

Target Mean Days Crushing Strength (Minm) : N/mm2

Remarks

LAB Engineer QC Engineer


Contractor Consultant

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/05 No. 01 Date: November 6, 2017 1 of 1