Professional Documents
Culture Documents
Reference Document
Description of Item Submitted (Type, Size, Model Manufacturer / Contractor/ No. of Review
SN
No., etc.) Drawing / Brochure No. Copies Remarks
Specs. Para. Drawing Variation Code
No. Sheet. No. (Y/N)
Remarks: Code:
(1) Approved (3) Rejected (5) Addt'l. Information Required
(2) Approved as Noted (4) Revise & Resubmit (6) Material Submittal Required
For the contents of this submittal, approval by the Consultant and/or the Engineer shall not relieve the
The Contractor certifies that all above submitted items have been reviewed in detail and are correct
Contractor of his obligation under the Contract, and the Contractor shall be solely responsible for the
in strict conformance with the Contract drawings and specifications except otherwise stated.
soundness and correctness of the submitted documents.
WI-PST-12-01 633195461.xls
01-Jan-2021, Rev00 Page 2 of 2