You are on page 1of 2

Doc. No.

TEC-032111F-SPD-CLT-
TECHNICAL DEPARTMENT-CIVIL (Rev No.) Rev02
Shop Drawings-Check List Issue Date August 2011
CSI No Subject Doc Type Rev. Date 17th April 2020
032111 Rebar & BBS Checking for Footing Check List Rev: 2 Page 1 of 2

For updates of this and other subject Shop drawings checklist

1. Click here OR
2. Search for “Technical Engineer Civil Google Sites” in Google OR
3. Copy and paste the following URL: https://sites.google.com/site/technicalengineercivil/

1. Scope
This Checklist is for reviewing the rebar for footing.

2. Project Details
Project
Project Code
Name
Client Name Subcontractor
/ PMC Name

Consultancy Drawings No

3. Check List.
Sr.
Description OK/Not OK Remarks
No.

Title block complies to TEC-013000-SPD-CLT-Rev02_All Shop Dwg common


1 Checklist.

2 Legends, general notes given.

3 Key plan for the submitted area given with foundation types

4 Key plan: Give size of each individual footing

For footing with only one column


5 Short span = B1 & T1 layer
Long Span = B2 & T2 layer.

For footing with two or more columns


6 Long Span = B1 & T1 layer
Short span = B2 & T2 layer.

Starter bar for the columns provided (With provision of kicker/ Without provision of
7 Kicker)

Three rings (1st at the bottom, 2nd at the top but in the footing and 3rd at the top of
8 the starter)

9 Side bar provided

10 Chair bars provided


Doc. No. TEC-032111F-SPD-CLT-
TECHNICAL DEPARTMENT-CIVIL (Rev No.) Rev02
Shop Drawings-Check List Issue Date August 2011
CSI No Subject Doc Type Rev. Date 17th April 2020
032111 Rebar & BBS Checking for Footing Check List Rev: 2 Page 2 of 2

4. Summary result.

Reviewed by Approved by Date Decision

Signature
Received from
Subcontractor
Return this shop drawing to
Subcontractor ☐
Date
Transmittal to
Consultant on
Forward this shop drawing to
Subcontractor ☐
Received from
Name
consultant back on