L'wzaar Fish Market - QCDD Handing Over Documents Index
Project Name: L'wzaar Fish Market and Restaurant
Client: Aspire Katara Hospitality Consultant: Projacs International Main Contractor: Pentagram Design Trading and Contracting MEP Contractor: Lead Cooling Contracting and Trading S.N. Item Description A Application Forms and Attachments A.1 Building Application for QCDD Inspection (Form A) A.2 QCDD Inspection Request (Form B) A.3 List of Equipment & Companies (Form C) A.4 Building Permit A.5 Site Supervising Consultant CR A.6 Main Contractor CR A.7 Client Representative ID A.8 Main Contractor Representative ID A.9 Firefighting Subcontractor - CR / Civil Defense Certificate A.10 Fire Alarm Supplier/Subcontractor - CR / Civil Defense Certificate A.11 Fire Stop Subcontractor CR - MEP A.12 Emergency Exit Light Supplier and Subcontractor CR A.13 Fire Stop Subcontractor CR - Civil A.14 Fire Rated Duct Supplier CR A.15 Motorized Damper Supplier CR A.16 Steel Doors Subcontractor CR A.17 Wooden Doors Subcontractor CR A.18 QCDD Certificate for Fire Alarm Engineer A.19 QCDD Certificate for Fire Fighting Engineer A.20 Fire Suppression System Supplier CR B QCDD Certificate of Materials & Equipment B.1 Fire Alarm System B.2 Fire Hose Cabinet B.3 OS & Y gate valve B.4 Pressure Reducing Valve B.5 Check Valve B.6 Sprinklers B.7 Butterfly Valve B.8 Zone Control Valve B.9 Flow Switch B.10 Portable Fire extinguishers B.11 Fire-rated duct B.12 Fire Stop Material - Civil B.13 Steel Doors B.14 Wooden Doors B.15 Fire Stop Material - MEP B.16 Fire Suppression System B.17 Iron Mongries - Hardware - Steel and Wooden Door B.18 Exit Light B.19 Motorized Dampers C Drawings/Calculations/QCDD Certificate for Engineers Required Documents Drawings Required Documents C.1 QCDD Fire Life and Safety C.2 QCDD Fire Alarm C.3 QCDD Approved Fire Fighting Drawings C.4 QCDD Approved Air Conditioning and Mechanical Ventilation (ACMV) Drawings As-Built Drawings C.5 As-Built Drawings (Cause and effect matrix) C.6 As-Built Drawings (Power Single Line Diagram) C.7 As-Built Drawings (Firefighting) C.8 As-Built Drawings (Fire Alarm) C.9 As-Built Drawings (ACMV) C.10 As-Built Drawings (Emergency Light) D Calculations and Required Documents D.1 Approved Fire Hydraulic Calculation D.2 DRI for MEP D.3 Sequence of Ventilation Fans D.4 Battery Calculation - Fire Alarm System D.5 DRI for Civil D.6 Fire Suppression System E List of Testing and Commissioning with Reports for QCDD File of Application for Inspection Fire Alarm System E.1 Record of T&C - FA (QCDD Format) E.2 Record of Completion - FA (QCDD Format) E.3 Sound level reading E.4 Motorize Fire Damper Test incpection Central Battery System E.5 Emergency Power Supply report (QCDD) E.6 Emergency Light Lux Level report (QCDD) Firefighting Sysyem E.7 Sprinklers test report (QCDD) E.8 STANDPIPE SYSTEM TEST (QCDD) Novec Sysyem E.9 Integrity Test E.10 Functional Test
Form of Application To Be Made For Construction, Establishment or Installation of Factory, Workshop or Workplace in Which Steam or Other Power Is To Be Employed PDF