Professional Documents
Culture Documents
Flow in Head in
S.No. Building Location Quantity Unit Remarks
GPM Metre
1 Thumama A Part A 70 50 1 Duty + 1 Standby Set
Selected Demand As Per UPC Chart 18-2 for 224 Fixture Unit will be 70 Gallons/Minute
3 Lavatory 6 4 15 5 30 1 30
4 Kitchen Sink 1 11 4 16 2 32
5 Hose Bibb 7 3 10 1 10
Selected Demand As Per UPC Chart 18-2 for 196Fixture Unit will be 65 Gallons/Minute
Project: The Green Oasis Mall - Thumama B ( Part - A )
Subject: Water Supply Demand load selection by using Fixture units As per UPC System
Occupancy: Private
Fixture / Trim Quantity Demand
Total Demand
S.No. Fixture Weight in
in Fixture Units
Basement Ground First Second Roof Total Qty Fixture Units
European Water
1 6 16 4 26 3 78
Closet
2 Perenial Spray 6 16 4 26 1 26
3 Lavatory 6 16 4 26 1 26
4 Kitchen Sink 10 4 14 2 28
5 Hose Bibb 8 2 10 1 10
Selected Demand As Per UPC Chart 18-2 for 168 Fixture Unit will be 60 Gallons/Minute
Project: The Green Oasis Mall - Thumama B ( Part - B )
Subject: Water Supply Demand load selection by using Fixture units As per UPC System
Occupancy: Private
Fixture / Trim Quantity Demand
Total Demand in
S.No. Fixture Weight in
Fixture Units
Basement Ground Mezanine First Second Roof Total Qty Fixture Units
European Water
1 7 8 19 5 39 3 117
Closet
2 Perenial Spray 7 8 19 5 39 1 39
3 Lavatory 7 7 18 5 37 1 37
4 Kitchen Sink 10 4 14 2 28
5 Hose Bibb 5 3 8 1 8
Selected Demand As Per UPC Chart 18-2 for 229 Fixture Unit will be 70 Gallons/Minute
Project: The Green Oasis Mall - Shahaba ( Part - A )
Subject: Water Supply Demand load selection by using Fixture units As per UPC System
Occupancy: Private
Fixture / Trim Quantity Demand
Total Demand in
S.No. Fixture Weight in
Basement Ground Mezanine First Second Roof Total Qty Fixture Units
Fixture Units
European Water
1 10 2 24 8 44 3 132
Closet
2 Perenial Spray 10 2 24 8 44 1 44
3 Lavatory 10 2 23 8 43 1 43
4 Kitchen Sink 8 8 2 16
5 Hose Bibb 15 3 4 22 1 22
Selected Demand As Per UPC Chart 18-2 for 257 Fixture Unit will be 70 Gallons/Minute
Project: The Green Oasis Mall - Shahaba ( Part - B )
Subject: Water Supply Demand load selection by using Fixture units As per UPC System
Occupancy: Private
Fixture / Trim Quantity Demand
Total Demand in
S.No. Fixture Weight in
Basement Ground Mezanine First Second Roof Total Qty Fixture Units
Fixture Units
European Water
1 10 3 23 8 44 3 132
Closet
2 Perenial Spray 10 3 23 8 44 1 44
3 Lavatory 10 3 22 8 43 1 43
4 Kitchen Sink 19 8 27 2 54
5 Hose Bibb 10 3 3 16 1 16
Selected Demand As Per UPC Chart 18-2 for 289 Fixture Unit will be 75 Gallons/Minute
Project: The Green Oasis Mall - Shahaba ( Part - C )
Subject: Water Supply Demand load selection by using Fixture units As per UPC System
Occupancy: Private
Fixture / Trim Quantity Demand
Total Demand in
S.No. Fixture Weight in
Basement Ground Mezanine First Second Roof Total Qty Fixture Units
Fixture Units
European Water
1 8 0 19 6 33 3 99
Closet
2 Perenial Spray 8 0 19 6 33 1 33
3 Lavatory 8 0 18 6 32 1 32
4 Kitchen Sink 15 6 21 2 42
5 Hose Bibb 8 3 2 13 1 13
Total Demand in Fixture Units 219
Selected Demand As Per UPC Chart 18-2 for 219 Fixture Unit will be 70 Gallons/Minute
Project: The Green Oasis Mall - Thumama A ( Part - A )
Subject: Water Booster Pump Head Selection
Public Area
10 Lav 6 3
First Floor
Public Area
11 Perenial Spray 6 5
First Floor
12 Second Floor WC 4 3
13 Second Floor Lav 4 1.5
14 Second Floor Perenial Spray 4 3
15 Second Floor Kitchen Sink 4 3
16 Roof Floor Hose Bib 2 3
Project: The Green Oasis Mall - Thumama B ( Part - B )
Subject: Plumbing Fixture Qty for Demand Selection
Public Areas -
7 Mezanine Floor Perenial Spray 8 5
8 First Floor WC 11 3
9 First Floor Lav 11 1.5
10 First Floor Perenial Spray 11 3
11 First Floor Kitchen Sink 10 3
Public Area First
12 Floor WC 8 5
4 Kitchen Sink 10 4 2 3 6
5 Hose Bibb 5 3 1 3 3
Selected Selected
Demand Demand
As Per UPC
As Per
Chart
UPC
18-2
Chart
for 168
18-1Fixture
for 440.5
Unit
Fixture 60
will beUnit will 115
Gallons/Minute
be Gallons/Minute
19
19 1
18 1
1
Total Demand in Fixture Units
Selected Demand As Per UPC Chart 18-2 for 229 Fixture Unit will be 70 Gallons/Minute
Project: The Green Oasis Mall - Thumama A ( Part - A )
Subject: Water Supply Demand load selection by using Fixture units As per UPC System
Occupancy: Private
Fixture / Trim Quantity Demand
Total Demand
S.No. Fixture Weight in
Basement Ground Mezzanine First Second Roof Total Qty in Fixture Units
Fixture Units
European Water
1 6 5 12 3 26 3 78
Closet
2 Perenial Spray 6 5 12 3 26 1 26
3 Lavatory 6 5 12 3 26 1 26
4 Kitchen Sink 9 3 12 2 24
5 Hose Bibb 8 3 2 13 1 13
Total Demand in Fixture Units 167
Selected Demand As Per UPC Chart 18-2 for 167 Fixture Unit will be 60 Gallons/Minute
3 Lavatory 7 6 15 5 33 1 33
4 Kitchen Sink 11 4 15 2 30
5 Hose Bibb 5 3 3 11 1 11
Selected Demand As Per UPC Chart 18-2 for 210 Fixture Unit will be 70 Gallons/Minute
Domestic Water Booster Pump Calculation
Project: Green Oasis Mall
Building: Shahaba (Part A, B & C)
For Part A, 70 GPM @ 60m Head with one Duty and one Standby
For Part B, 75 GPM @ 60m Head with one Duty and one Standby
For Part C, 70 GPM @ 50m Head with one Duty and one Standby