You are on page 1of 2

GC-32, NEW GATHERING CENTRE FOR SEK

DOCUMENT TITLE: CONSTRUCTION QUALITY PLAN FOR MEI WORKS


IN OSBL AREA

Document Number: Rev.


Contract No.: Project No.: Job No.:
17051820-0000-A0-450- PLN-8201 B
17051820 EF/1931 JI-2035
Company Transmittal No :
CONTRACTOR’s RESPONSE SHEET 17051820-KP-T-33597

Subcontract No:JI2035/04-003

CONTRACTOR’S STATUS
S.NO REFERENCE COMPANY COMMENT(S)
RESPONSE (OPEN/CLOSE)

The submitted Quality Plan by Sub-Contractor Mark is generic in


Nature. As we understand the scope of sub-contractor is limited to
BS 171A shut down activities, whereas the submitted QP covering all
disciplines of OSBL area like Piping fabrication and installation, erection
1 Page 5 of 42
of static and rotary equipment, painting, CP, electrical, telecom
etc.(Clause 1.2) under Sub Contractor's scope. Contractor to check and
reconfirm.

Page 5 of 42 The Quality Plan has to be tailored to reflect special details and Comments Incorporated.
2
requirements of the Sub-Contractor's scope.
Page 6 of 42 Quality Plan is developed in line with ISO I 0005 series of standards and Comments Incorporated.
3
contract requirements
Attachment Quality Manual to be submitted for Company review and approval Comments Incorporated.
4
Page 7 of 42 Under definition (Clause 3), Sub-Contractor is mentioned as Sinopec Comments Incorporated.
5
Tenth Engineering Co .Ltd. PIL to clarify
Check Appendix 2 Appendix 2, Quality Control Plan, indicate the applicable reference Comments Incorporated.
6 procedures (Document Nos.) rather than mentioning a general
statement

Page 1 of 2
GC-32, NEW GATHERING CENTRE FOR SEK

DOCUMENT TITLE: CONSTRUCTION QUALITY PLAN FOR MEI WORKS


IN OSBL AREA

Document Number: Rev.


Contract No.: Project No.: Job No.:
17051820-0000-A0-450- PLN-8201 B
17051820 EF/1931 JI-2035
Company Transmittal No :
CONTRACTOR’s RESPONSE SHEET 17051820-KP-T-33597

Check Appendix 2 For activity nos. 4.1 and 4.1, mark Company intervention as (W) Comments Incorporated.
7 Hence, in view of the above comments, the subject document shall be
revised and resubmitted for the Company to review and approval

CONTRACTOR – REVIEW COMPANY - REVIEW

Name : Name :

Date : Date :

Page 2 of 2