: CFP‐TR‐PTR‐TRCC02‐000188
Received: 16 July, 2021
Ref. No.:
Received:
Finally, except R1 Roof Plates, surface preparation and full-coat painting shall be done for
the whole Roof Structure, all other Roof Plates (R2, R3, R4 & Crown Plate) and all the Roof
Nozzles underside; while the Roof is on the Ground Position as shown in Figure No. 1; prior to
lifting it up.
YES ; NO
Attachment(s)
included
By:
Signature:
Page2of3
THAI OIL CLEAN FUEL PROJECT
Based on TRC provided email informations, UJV-1 already issued a ETQ to OWNER and got the
Response and forwarded to TRC on 14-July-21.
TRC shall follow the OWNER approved UJV-1 ETQ # CFP-ETQ-OFC-PMC-MS10042 Rev 0-rev0_C1
informations / comments for the actual job executions and shall apply to the actual works executions.
Any commercial implications/claims from TRC to UJV on this matter is not acceptable and will not be accepted.
Authorization:
CLOSE OUT
Action Taken Close out by:
Date:
Signature: