You are on page 1of 3

Ref. No.

: CFP‐TR‐PTR‐TRCC02‐000188
Received: 16 July, 2021

J. 2020 ‐ 312 | TRC'S DCC

Received: 13 July 2021

J. 2020 ‐ 312 | TRC'S DCC

Ref. No.:
Received:

J. 2020 ‐ 312 | TRC'S DCC

Ref. No.: CFP‐TR‐PTR‐TRCC02‐000016


Received: 13 Aug, 2020
By Kamonsiri N.
J. 2020 ‐ 312 | TRC'S DCC
THAI OIL CLEAN FUEL PROJECT 

SITE TECHNICAL QUERY Technical Query Number: Rev.


 0
Contract No.: Job No.: Date: CFP-STQ-TRCC02-PTR-
JI-2044 R11181111 01-July-2021 MS10049

Furthermore, SUB-CONTRACTOR shall carry out the followings;

Prior to Roof Internal Painting (upon completion of welding);


a) 100% Vacuum Box testing of Roof weld Joints in accordance with API 650 Clause 8.6
and approved VBT Procedure R1118111-TRC-CO2-24-PRO-10037
b) 100% Visual Examination of welds.

After Internal Painting/ Roof Lifting;


c) After Roof Lifting/Erection, Pressure testing Shall be conducted following; the test
pressure as per API 650 F.4.4 and Hydrotest procedure R1118111-TRC-CO2-24-PRO-
10035 and SUB-CONTRACTOR will ensure to provide CONTRACTOR a Gas tight Roof
with no leaks.

Finally, except R1 Roof Plates, surface preparation and full-coat painting shall be done for
the whole Roof Structure, all other Roof Plates (R2, R3, R4 & Crown Plate) and all the Roof
Nozzles underside; while the Roof is on the Ground Position as shown in Figure No. 1; prior to
lifting it up.

† YES ; NO
Attachment(s)
included

By:

Approved for Position:


Issue:

Signature:

Page2of3

THAI OIL CLEAN FUEL PROJECT 

SITE TECHNICAL QUERY Technical Query Number: Rev.


 0
Contract No.: Job No.: Date: CFP-STQ-TRCC02-PTR-
JI-2044 R11181111 01-July-2021 MS10049

CONTRACTOR RESPONSE

Reference Document (s) :

Based on TRC provided email informations, UJV-1 already issued a ETQ to OWNER and got the
Response and forwarded to TRC on 14-July-21.
TRC shall follow the OWNER approved UJV-1 ETQ # CFP-ETQ-OFC-PMC-MS10042 Rev 0-rev0_C1
informations / comments for the actual job executions and shall apply to the actual works executions.

Any commercial implications/claims from TRC to UJV on this matter is not acceptable and will not be accepted.

Attachment(s) included † YES † NO

Authorization:

Authorized by: SUYOG SATHE Signature: Date: 14-JULY-2021

CLOSE OUT
Action Taken Close out by:

Date:

Signature:

Page3of3