You are on page 1of 16

Provision of Construction Service for Pipeline and Stations

for ENGINEERING, PROCUREMENT AND


Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
EPC No: Tender No. MR-01/2022 Page 1 /16

3– TECHNICAL PROPOSAL

Page: 1 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
EPC No: Tender No. MR-01/2022 Page 2 /16

CONTENTS

CONFIRMATION...............................................................................................................................................................3
STATEMENT OF DEVIATIONS FOR BIDDER'S ALTERNATIVE PROPOSAL...................................................4
1.0 SCOPE OF TECHNICAL PROPOSAL..............................................................................................................5
1.1 INTRODUCTION AND PURPOSE....................................................................................................................5
1.2 ACKNOWLEDGMENT OF RECEIPT OF ITB, ADDENDA AND CLARIFICATIONS.............................5
1.3 ACKNOWLEDGMENT OF INSPECTION OF SITE.......................................................................................5
1.4 BIDDER PROFILE AND ORGANIZATION.....................................................................................................5
1.4.1 BACKGROUND OF COMPANY....................................................................................................................5
1.4.2 SUB-SUBCONTRACTORS.............................................................................................................................6
1.4.3 ORGANIZATION CHART..............................................................................................................................6
1.4.4 KEY PERSONNEL...........................................................................................................................................6
1.5 EXPERIENCE.......................................................................................................................................................6
1.6 LICENSE................................................................................................................................................................6
1.7 FINANCIAL CAPABILITIES..............................................................................................................................6
1.8 EXECUTION PLAN.............................................................................................................................................7
1.8.1 GENERAL..........................................................................................................................................................7
1.8.2 PROJECT CONTROLS...................................................................................................................................7
1.8.3 QUALITY MANAGEMENT PROGRAM......................................................................................................7
1.8.4 OCCUPATIONAL HEALTH AND SAFETY.................................................................................................8
1.9 SUBCONTRACT EXECUTION SCHEDULE...................................................................................................8
1.10 STATEMENT OF COMPLIANCE......................................................................................................................8
1.11 UNPRICED COMMERCIAL..............................................................................................................................8
1.12 LITIGATION.........................................................................................................................................................8
1.13 CONFIDENTIALITY AND SECRECY..............................................................................................................8
1.14 OTHER MATTERS (AT BIDDER’S DISCRETION).......................................................................................8
1.15 BUSINESS STANDARDS.....................................................................................................................................8
END OF TECHNICAL PROPOSAL.................................................................................................................................15

Page: 2 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
EPC No: Tender No. MR-01/2022 Page 3 /16

Attachment 3-A

CONFIRMATION

TO: NORINCO International Cooperation Ltd.&NORINCO International Cooperation Ltd. Pipeline PE


Commercial Dept.,
Door.102, 50D Suit, Tokyo town, 18th khoroo, Khan-Uul district, Ulaanbaatar, Mongolia.
(Монгол, Улаанбаатар, Хан-Уул дүүрэг, 18-р хороо, Токио таун хотхон,50Д байр, 1-р давхар, 102 тоот).
Email: dcc.mpp@norinco-intl.com CC, lzhn@norinco-intl.com, zfy@norinco-intl.com
ATTN: Commercial Dept Engineer
"STRICTLY CONFIDENTIAL"

TENDER NO. : TENDER NUMBER: MR012022-0000-SC-CSC-0019


TENDER TITLE: Provision of Construction Service for Pipeline and Stations for ENGINEERING,
PROCUREMENT AND CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
SUBJECT : TECHNICAL PROPOSAL

Dear Sir,
 We hereby confirm that we have enough information and documents for the Project. We have
taken all other measures to satisfy ourselves as to the requirements of the ITB and the
SUBCONTRACT. We understand the full nature and scope of the Works, we are required to
perform reasonably and contingently all the Construction Service for Pipeline. The definitions in the
ITB shall apply mutatis mutandis herein.
Dated : _________________________________

For on behalf of : _________________________________ Official Stamp


Name of Company : _________________________________
Signed : _________________________________
Name : _________________________________
Designation : _________________________________
Address : _________________________________
_________________________________
_________________________________

For on behalf of : _________________________________ Official Stamp


Name of Company : _________________________________
Signed : _________________________________
Name : _________________________________
Designation : _________________________________
Address : _________________________________
_________________________________
_________________________________

Note:

For consortia/joint ventures, all consortia members/joint ventures companies are to sign and stamp with

Page: 3 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
EPC No: Tender No. MR-01/2022 Page 4 /16

company stamp in the above form.

Page: 4 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
EPC No: Tender No. MR-01/2022 Page 5 /16

Attachment 3-N

STATEMENT OF DEVIATIONS FOR BIDDER'S ALTERNATIVE PROPOSAL

Section /
Statement Statement proposed by BIDDER reason State Increase or (reduction) on
Paragraph
in ITB BIDDER for deviation BASE PROPOSAL Price
Reference

NO
NO DEVIATION NO DEVIATION NO DEVIATION NO DEVIATION
DEVIATION

We hereby comply with all paragraphs of this ITB except as otherwise stated above. We confirm that
anything not stated in the table above shall comply fully with ITB requirements. We also confirm that above
listed deviations do not have any impacts on Schedule of Works i.e. Mechanical completion and Provisional
Acceptance mentioned in ITB.
Signed :
Name :
Designation :
Official Stamp :
Date :

Note:
1. If BDDER is fully complied with ITB without any deviation, then BIDDER shall insert the wording of “NO
DEVIATION” to all column.
2. For consortia/joint ventures, all consortia members/joint ventures companies are to sign and stamp with
company stamp.

Page: 5 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
EPC No: Tender No. MR-01/2022 Page 6 /16

1.0SCOPE OF TECHNICAL PROPOSAL

BIDDER shall submit a Technical Proposal which clearly describes all non-commercial matters that
form part of BIDDER’s proposal. The Technical Proposal shall be prepared with the following Table
of Contents and as per the details mentioned in the preceding sections below:

a) Introduction and Purpose

b) Acknowledgment of Receipt of ITB, Addenda and Clarifications

c) Acknowledgment if Inspection of SITE

d) BIDDER Profile and Organization

e) Experience

f) License

g) Financial Capabilities

h) Execution Plan

i) SUBCONTRACT Execution Schedule

j) Statement of Compliance

k) Litigation

l) Confidentiality and Secrecy

m) Other matters at BIDDER’s discretion

1.1INTRODUCTION AND PURPOSE

BIDDER shall clearly state the intent and purpose of the BID

BIDDER shall also confirm that its proposal conforms in every way with the ITB.

1.2ACKNOWLEDGMENT OF RECEIPT OF ITB, ADDENDA AND CLARIFICATIONS

BIDDER shall acknowledge in writing receipt of the ITB and all addenda and clarifications. BIDDER
shall warrant that they have examined the ITB documents in their entirety and has no outstanding
matters requiring clarification.

1.3ACKNOWLEDGMENT OF INSPECTION OF SITE

1.4BIDDER PROFILE AND ORGANIZATION

1.4.1 BACKGROUND OF COMPANY

BIDDER is required to provide information about the company which shall include:

1) Background of company

Page: 6 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
EPC No: Tender No. MR-01/2022 Page 7 /16

2) Agreement of Joint Venture, Association, Consortium or Partnership, comply with the


laws of Mongolia government.

3) Main activity/business

4) Equity/shareholders/Directors

5) Affiliates/principal/subsidiaries company

6) Business license(Mother Company and Subsidiary to conduct the project)

1.4.2 SUB-SUBCONTRACTORS

Subcontracting is not allowed.

1.4.3 ORGANIZATION CHART

BIDDER shall provide a chart showing the organization and lines of authority and communication
that are proposed for the execution of the Construction Service for Pipeline. SUBCONTRACTOR
representation in the organization chart shall also be shown. A full explanation of the lines of
authority and communication shall be provided.

1.4.4 KEY PERSONNEL

BIDDER shall provide resumes of key personnel it proposes to employ in the execution of the
Construction Service for Pipeline.

The resumes shall include but not limited to the following information:

1) Professional qualification (showing date of award and educational institution);

2) Date of birth and nationality (at birth and currently)

3) Education level;

4) Experience related to project scope; and

5) References

BIDDER is encouraged to submit other resumes that demonstrate special expertise or experience
that is relevant to the Construction Service for Pipeline.

1.5EXPERIENCE

Experience and capability must be sufficient in order that the objectives of the SUBCONTRACT are
achieved. BIDDER shall describe the experience in Oil, Gas and Petrochemical and other projects.
BIDDER shall emphasize on projects where BIDDER as a prime contractor, or as a significant joint-
venture partner, has successfully executed projects of similar nature. This information shall be
submitted by BIDDER in the format provided in Attachment 3-B.

1.6LICENSE

BIDDER is required to have and provide the necessary license to complete the Works in
accordance with the laws of the Mongolian Government.

Page: 7 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
EPC No: Tender No. MR-01/2022 Page 8 /16

1.7FINANCIAL CAPABILITIES

BIDDER and / or each member of its joint-venture /consortium shall submit the following:

(a) Audited financial statements for the last three (3) years;

(b) Credit references from banks and / or other credit references

BIDDER shall complete details of its financial status in Attachment 3-C.

1.8EXECUTION PLAN

1.8.1 GENERAL

BIDDER shall provide a detailed plan concerning all phases and aspects of the SUBCONTRACT.

The plan shall be in sufficient detail to ensure Contractor that BIDDER has the knowledge of the
scope of work and is capable of performing the Construction Service for Pipeline in accordance with
the requirements of the ITB. The plan shall contain detailed Deliverable List.

The plan shall clearly describe the roles and responsibilities at each of the above phases and in
addition, financial stake of the SUBCONTRACT.

The plan shall show how Bidder intend to function within the plan and achieve the objectives of the
SUBCONTRACT.

1.8.2 PROJECT CONTROLS

BIDDER shall provide a Project Control Plan detailing how the various project activities will be
planned and controlled. As a minimum, BIDDER shall address the development of project
baselines and control / reporting systems in the following areas:

1) Critical Path Network in diagrammatic network. This shall be the basis to generate data for all
bar chart.

2) Scheduling; Bar chart for every stage, Master Project Schedule.

3) Resource Management e.g. histogram showing direct and indirect manpower;

4) Progress Measurement showing physical progress measurement and must be auditable


method;

5) Cost and Milestone Payment schedule

6) Planned ‘S’ curve with weightage distribution

7) Level 3 schedule.

In particular, BIDDER’s scheduling methods and procedures shall include, as a minimum:

(a) A chart showing the hierarchy of schedules to be used during the execution of Construction
Service for Pipeline; a description of the contents of each of these schedules and their relationship
to one another and a sample of each schedule.

(b) A description of the procedures to be used for schedule development, monitoring and updating.

Page: 8 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
EPC No: Tender No. MR-01/2022 Page 9 /16

1.8.3 QUALITY MANAGEMENT PROGRAM

BIDDER shall submit a plan that provides an outline of the Quality Management Program to be
implemented under the SUBCONTRACT.

The outline should provide sufficient detail to describe the principles of the program and the various
procedures that will be implemented to complete the Construction Service for Pipeline and
implement those principles.

SUBCONTRACTOR shall provide verification in its BID that its quality system conforms with the
ISO 9000 or an equivalent standard approved by Contractor, by presentation of the results of an
independent audit, as performed by an accredited auditing organization.

1.8.4 OCCUPATIONAL HEALTH AND SAFETY

BIDDER shall provide a plan that outlines the Occupational Health and Safety Program to be
implemented under the SUBCONTRACT. The outline should provide sufficient detail to describe
the principles of the program and the activities that will be used to implement those principles.

1.9SUBCONTRACT EXECUTION SCHEDULE

BIDDER shall prepare and submit an overall SUBCONTRACT EXECUTION SCHEDULE in bar
chart form corresponding to the start and completion dates stipulated in Conditions of
SUBCONTRACT.

BIDDER shall also submit a PERT Chart showing the sequence, inter-relations and inter-
dependence of key activities relating to the Construction Service for Pipeline.

1.10 STATEMENT OF COMPLIANCE

BIDDER shall indicate compliance of its BID with the requirement of the ITB by completing the Form
of Compliance included as per, Attachment 3-M, “Form of Compliance”, without any qualification or
alteration.

BIDDER shall list out any deviations/exceptions to the ITB document, if any, using format provided
in, Attachment 3-N, which Contractor may or may not accept. BIDDER deviations/exceptions shall
be submitted in a similar manner as BIDDER Alternatives.

1.11 UNPRICED COMMERCIAL

BIDDER shall provide the UNPRICED COMMERCIAL PROPOSAL according to APPENDIX-7


SCHEDULE OF UNIT RATES, and the content shall exclude any price item.

1.12 LITIGATION

BIDDER shall declare if it is currently and / or in the last five years been involved in litigation. If so
involved, BIDDER shall submit details in the format provided in Attachment 3-O, “LITIGATION
DECLARATION”.

1.13 CONFIDENTIALITY AND SECRECY

SUBCONTRACTOR shall always treat the ITB documents and its contents as confidential and not
divulge any information to any other parties without Contractor’s approval. BIDDER shall execute
the form provided in Attachment 3-P “CONFIDENTIALITY AND SECRECY DECLARATION” to
indicate its compliance.

Page: 9 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
10
EPC No: Tender No. MR-01/2022 Page
/16

1.14 OTHER MATTERS (AT BIDDER’S DISCRETION)

BIDDER should include any other non-commercial information it feels will enable Contractor to
better understand or appreciate its proposal.

1.15 BUSINESS STANDARDS

All BIDDERs are entitled to receive equal opportunity to secure a contract. The offering or receiving
of gifts, entertainment, payments, loans or other favors for the purpose of being placed on the
BIDDER's list, obtaining a contract or purchase order, or favorable treatment under a contract or
purchase order, is prohibited. Furthermore, it is Contractor's policy, in the event that a BIDDER,
vendor or SUBCONTRACTOR is found to have offered or given a gratuity to obtain a contract or
order, or favorable treatment thereunder, to remove any and all companies involved from further bid
considerations. Contractor will also obtain those remedies available under the law and the
SUBCONTRACT or Purchase Order, including but not limited to termination for default. BIDDER's
attention is directed specifically to those articles in the terms of the SUBCONTRACT or Purchase
Order relating to the law and to default.

Page: 10 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
11
EPC No: Tender No. MR-01/2022 Page
/16

ATTACHMENT 3- B
EXPERIENCE

Company JV/ Project Client Country Duration of Date Value (in US Contact
Consortium Description & Construction Completed Dollars) Persons *(for
Partner Scope of Work Period references)

* Please furnish names and telephone / fax numbers.

Page: 11 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
12
EPC No: Tender No. MR-01/2022 Page
/16

ATTACHMENT 3-C
BREAKDOWN OF FINANCIAL STATUS OF COMPANY FOR EACH MEMBER OF JOINT-VENTURE / CONSORTIUM

No. Items Company or JV / Consortium Company or JV / Consortium Member


Year 1 Year 2 Year 3 Year 1 Year 2 Year 3
1. Current Asset

2. Current Liabilities
3. Working Capital (1-2)
4. Long Term Assets
5. Total Assets (1+4)
6. Shareholder Equity
7. Net Profit after Tax

Page: 12 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
13
EPC No: Tender No. MR-01/2022 Page
/16

ATTACHMENT 3 – M
FORM OF COMPLIANCE
TO:

NORINCO International Cooperation Ltd.&NORINCO International Cooperation Ltd. Pipeline PE

Attention: Mr.
Provision of Construction Service for Pipeline and Stations for ENGINEERING, PROCUREMENT AND CONSTRUCTION OF THE PROJECT
TO CONSTRUCT A CRUDE OIL PIPELINE IN MONGOLIA
Dear Sir,

Having examined the INVITATION TO BID Documents (and Addenda and Clarifications thereto), this is to warrant that this BID hereby fully complies
with all the provisions of the INVITATION TO BID.

Signed : .………………………………………………
Designation : ……………………………………………….
Company : ……………………………………………….
Signed : .………………………………………………
Designation : ……………………………………………….
Company : ……………………………………………….
Date : ……………………………………………….

Page: 13 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
14
EPC No: Tender No. MR-01/2022 Page
/16

ATTACHMENT 3 – O
LITIGATION DECLARATION
I, ………………………………………..………………………………………………. (Name) representative of the BIDDER
………………………………………………………………… hereby declare:
i) The BIDDER is currently involved in litigation Yes / No
- if the above answer is YES, please give details in
separate sheets of paper.
ii) If the BIDDER is a joint-venture partnership or consortium, Yes / No / *NA
the individual partner / companies are currently involved in
litigation
- if the above answer is YES, please give details in
separate sheets of paper.
iii) The BIDDER has in the last five years been involved in Yes / No
litigation
- if the above answer is YES, please give details in
separate sheets of paper.
iv) If the BIDDER is a joint-venture partnership or consortium, Yes / No / *NA
the individual partner / companies have in the last five
years been involved in litigation.
- if the above answer is YES, please give details in
separate sheets of paper.

* NA = Not Applicable
Signed : …..……………………………………….
Designation : …………………………………………...
Company : ……………………………………………

Page: 14 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
15
EPC No: Tender No. MR-01/2022 Page
/16
ATTACHMENT 3 - P
CONFIDENTIALITY AND SECRECY DECLARATION

Pursuant to the provisions of the SUBCONTRACT and BID documents (Invitation To BID dated …………………) between NORINCO INTL(referred to as
Contractor), and ……………………… (referred to as SUBCONTRACTOR), the Contractor hereby declares and agrees that:-

1. Without prior written agreement of Contractor in connection with any process, engineering, procurement, and / or construction work under the
SUBCONTRACT (hereinafter called the WORK), which Contractor may wish to entrust to the SUBCONTRACTOR from time to time, and / or in
connection with preparation by the SUBCONTRACTOR of a BID for the WORK or any part thereof, the SUBCONTRACTOR shall not at any time
and for any purpose other than the performance of the SUBCONTRACT WORK or the preparation of the said BID:
(a) disclose to any third party that the WORK, or any part thereof, may be or have been entrusted to the SUBCONTRACTOR and / or that the
SUBCONTRACTOR has been invited to submit a BID for the WORK, or any part thereof;
(b) reproduce, copy or use, disclose to, place at the disposal of or use on behalf of any third party or enable any third party to peruse copy or use any
documents, drawings, data or other information,
(i) placed or to be placed at the disposal of the SUBCONTRACTOR by or on behalf of Contractor for carrying out the WORK, or any part
thereof, and / or the preparation of the said BID,
(ii) which the SUBCONTRACTOR may in any other way require from Contractor and which are directly or indirectly related to the WORK,
or any part thereof, and / or the preparation of the said BID;
(iii) which the SUBCONTRACTOR has prepared or will prepare in connection with the WORK, or any part thereof, and / or the
preparation the said BID, insofar as such documents, drawings, data and other information contain any information placed at the
disposal of the SUBCONTRACTOR or acquired by the SUBCONTRACTOR as referred to in (i) and (ii) above.
2. The SUBCONTRACTOR, upon completion of the SUBCONTRACT WORK, or in the event that the WORK, or any part thereof, will not be entrusted
to the SUBCONTRACTOR, upon request, as the case may be, shall return to the Contractor all documents, drawings and data forming part of the
SUBCONTRACT and Contractor BID document.
3. The undertaking as contained in Item 1 hereinabove shall not apply:

Page: 15 / 16
Provision of Construction Service for Pipeline and Stations
for ENGINEERING, PROCUREMENT AND
Contract Name
CONSTRUCTION OF THE PROJECT TO CONSTRUCT A
CRUDE OIL PIPELINE IN MONGOLIA
Contract No. MR012022-0000-SC-CSC-0019
Doc. Name: 3- Technical Proposal
16
EPC No: Tender No. MR-01/2022 Page
/16
a) if and insofar as the fact
and any of the documents, drawings, data and other information forming part of the SUBCONTRACT and Contractor BID document are part of
public knowledge or literature at the date of their receipt by the SUBCONTRACTOR as from such date;
b) if and insofar as such fact and documents, drawings, data and other information become part of public knowledge or literature at the date of their
receipt by the SUBCONTRACTOR as from such subsequent date;
c) if and insofar as documents, drawings, data and other information similar to such documents, drawings, data and information are already in the
possession of the SUBCONTRACTOR at the date of their receipt by the SUBCONTRACTOR as from such date;
d) if and insofar as documents, drawings, data and other information similar to such documents, drawings, data and information are subsequent to
the date of their receipt by the SUBCONTRACTOR disclosed to the SUBCONTRACTOR by a third party whose possession is lawful and is
under no obligation not to disclose as from such subsequent date.
e) if and insofar as documents, drawings, data and other information similar to such documents, drawings, data and information are developed by
the SUBCONTRACTOR independently of this SUBCONTRACT and BID document;
f) to use and disclosure made by the SUBCONTRACTOR five (5) years after the Effective Date of the SUBCONTRACT.
4. the SUBCONTRACTOR shall ensure that if under the terms of this Declaration any of the documents, drawings, data and other information (or the
facts contained therein) forming part of the SUBCONTRACT and CONTRACTOR BID document, come to the knowledge and/or in the possession of
any third party through the actions or fault of the SUBCONTRACTOR, then the SUBCONTRACTOR must inform Contractor accordingly and cause
such third party to be bound by the stipulations contained in this Declaration,
5. This Declaration shall be construed under and governed by the law stipulated in the SUBCONTRACT.
Signed : ………………………………………………..
Name : ………………………………………………..
Position held : ……………………………………………….On behalf of
SUBCONTRACTOR : …………………………………………………
Address: ……………………………………………….
Country: ………………………………………………...
Date : ………………………………………………...

END OF TECHNICAL PROPOSAL

Page: 16 / 16