Professional Documents
Culture Documents
Description:
Recommendations:
292
Signature
09 Feb 2021
SURVEILLANCE REPORT TRN-324
DISCIPLINE:
OBSERVATIONS:
Employer observed that surface preparation activities for road gullies/manholes RG-02 to RG-08 are
complete without raising inspection request on rectification works also; quality of concrete repair is
not acceptable.
.
Requirements: Contractor shall ensure rectification shall conform to approve MS for Concrete
Repair and surface preparation carried out correctly. Submit inspection request to ADPORTS
(Quality Engineer) for verification of works.
REPORT BY (AD Ports): DATE:
Godfrey Cruz Abrera 08-02-2021