METHOD STATEMENT REVISED RE-SUBMISSION SCHEDULE

FIRST STATUS SECOND THIRD


S/N METHOD STATEMENT DESCRIPTION DOCUMENT NUMBER STATUS RECEIVED RECEIVED STATUS RECEIVED STATUS REMARKS
RESUBMISSION CODE RESUBMISSION RESUBMISSION

Closing Extra Opening Inside the


1 6102-202-V8-8000-00004 R1 17-May-21 20-May-21 C3 05-Jun-21 17-Jun-21 C2 19-Jun-21 24-Jun-21 C1
Building

Lifitng Plan for Shaded Structures


2 (Canopy & Car Shed) Using 50T Mobile 6102-202-V8-5510-00003 R1 17-May-21 20-May-21 C3 01-Jun-21 09-Jun-21 C2 13-Jun-21
Crane

3 New ISPS Fence 6102-202-V8-6900-00004 C3 18-May-21 20-May-21 C3 01-Jun-21 17-Jun-21 C2 20-Jun-21 24-Jun-21 C1

Precast & Installation of CCTV Camera


4 6102-202-V8-6700-00001 C3 18-May-21 20-May-21 C3 01-Jun-21 20-Jun-21 C2 27-Jun-21 01-Jul-21 C1
Poles

5 Automatic Irrigation System Installation 6102-202-V8-1300-00004 C3 19-May-21 22-May-21 C3 02-Jun-21 17-Jun-21 C2 21-Jun-21

6 Soft Landscape Installation 6102-202-V8-1300-00005 C3 19-May-21 22-May-21 C3 02-Jun-21 22-Jun-21 C2 28-Jun-21

AL JABER ENERGY
Alternative Screed Proposal (Dry Mix:
7 6102-202-V8-1210-00010 C2 20-May-21 30-May-21 C1
C20/10)
Disinfection and Chlorination of Water
8 6102-202-V8-7200-00007 C2 22-May-21 31-May-21 C1
Supply

9 Modification of Road Gully 6102-202-V8-7700-00004 C2 23-May-21 01-Jun-21 C1

10 Shaded Car Parking 6102-202-V8-5510-00001 C2 24-May-21 02-Jun-21 C1

Lifitng Plan for UG Utilities & Other


11 6102-202-V8-1210-00012 C2 02-Jun-21 17-Jun-21 C1
Lifting Activities Using 50T Mobile Crane

12 Modification of Fire Chamber 6102-202-V8-7510-00019 C2 05-Jun-21 09-Jun-21 C1


Alternative Blinding Proposal (Dry Mix:
13 6102-202-V8-1210-00011 C2 27-May-21 16-Jun-21 C1
C20/20)
Precast & Installation of Street Light
14 6102-202-V8-7100-00012 C2 29-May-21 20-Jun-21 C1
Poles

Fabrication, Supply & Installation of


15 6102-202-V8-5510-00004 R1 05-Jun-21 06-Jun-21 C3 05-Jun-21 09-Jun-21 C2 13-Jun-21
Structural Steel Shade for Pump Room

16 Rectification of Deflected GRP Pipe in 6102-202-V8-7700-00005 C2 07-Jun-21 16-Jun-21 C1


Sand Buried & Pipe Encasement

17 Installation of Wall Mounted Fabric 6102-202-V8-5510-00004 R1 08-Jul-21


Shade Structure

18 Modification of cable Trench for 6102-202-V8-8510-00001 R1 27-Jul-21


Substation

19 Modification of Internal Wall for Oil 6102-202-V8-7700-00006 R1 28-Jul-21


Interceptor tansk

1 Fire Fighting 6102-202-V8-7510-00002 C2 10-Jun-21 08-Jun-21 C2 22-Jun-21 29-Jun-21 C1

2 Fire Fighting Pumps 6102-202-V8-7510-00009 C2 10-Jun-21

3 Plumbing Works for Drainage 6102-202-V8-7600-00001 C2 02-Jun-21

4 Voice & Data System 6102-202-V8-7500-00003 C3 05-Jun-21 08-Jun-21 C2 22-Jun-21 03-Jul-21 C1

UNIVERSAL VOLTAS
5 Emergency Lighting 6102-202-V8-7100-00013 C3 05-Jun-21 22-Jun-21 C2 05-Jul-21 15-Jul-21 C1

6 Energy Monitoring System 6102-202-V8-7100-00015 R1 not submitted


Light Control System
7 6102-202-V8-7100-00014 R1 not submitted
Fire Alarm System
8 6102-202-V8-7510-00017 C3 05-Jul-21 15-Jul-21 C2 28-Jul-21

9 Fire Protection System 6102-202-V8-7510-00018 C3 26-May-21 03-Jun-21 C3 21-Jun-21 30-Jun-21 C2 28-Jul-21

10 Painting of GI Fire Fighting Line 6102-202-V8-7510-00016 C2 27-May-21 13-Mar-21 C2 14-Jun-21 17-Jun-21 C1

11 Fire Stop Sealant 6102-202-V8-7510-00020 C2 27-May-21 17-Apr-21 C2 14-Jun-21 17-Jun-21 C1

12 GRP Tank 6102-202-V8-7200-00008 R1 05-Jun-21 09-Jun-21 C3 22-Jun-21 17-Jul-21 C2 28-Jul-21