Material Approval Request for Black Damp Sand Supplier/Manufacturer: Al Jaber Transport & General CODE
Submittal Title:
contracting - UAE Subcontractor: Al Jaber Energy Services. LLC (Concrete)
Document No. & Rev: 6102-202-V4-1210-00039
Transmittal No.: 6102-202-CX-AJ-NMDC-00844
3
Date Received: 14-03-2021
Date of Review: 15-03-2021
Target Date: -
Code 3 Revise & Resubmit. Work may not proceed Code 4 Review not required. Work may proceed
Note: Contractor is to return this comment sheet with re-submission within the specified target date. Re-submission not required for Code 1 & 4 approved/reviewed documents.
Page 2 of 2
Review Comment Sheet Document No.
is not a matter for dry mix. If bulking of sand is not present, then bulk
density is null to evaluate(Please refer ASTM C 144, BS EN 206,
Properties of concrete by A.M. Neville )
3 General GSY 003 Previous approval for raw material to be attached. Noted
15-03-2021
QA/QC George Sadek
Code 1 Work may proceed Code 2 Revise and resubmit. Work may proceed subject to incorporation of comments by target date
Code 3 Revise & Resubmit. Work may not proceed Code 4 Review not required. Work may proceed
Note: Contractor is to return this comment sheet with re-submission within the specified target date. Re-submission not required for Code 1 & 4 approved/reviewed documents.