Italian-Thai Development Public Company Limited North-South Commuter Railway Extension

(NSCR-EX) Project
Packages No. CP N-03
Civil Works
Procedure for Submission and Document Numbering, Format and Coding System

REQUEST FOR INFORMATION FORM Contract CP N-03

Submittal No.
Date:
Area Discipline No. Rev.
NSCR ITD N03 RFI 24-June-2022
ZWD ST 000097 A

Title : Clarification on the Material Below Station Plaza Level and Termination of RC To: Mr. Katsuyuki Saito
Beam to Column Project Director, GCR consortium
Discipline : Structural
Originator Name : By : Mr. Natee Paramee CC : Project Manager, Contract CP N-03-DOTr

Signed :
Date Information Required by : 7 days after issue
We confirm this Query was discussed with Mr. N/A your prior to issue.

INFORMATION REQUESTED : (Attach additional sheets as required to fully describe the request)
Drawing No. (s) : MCRP-DWG-ANG-AR-3421 Rev.31, MCRP-DWG-ANG-AR-3423 Rev.31, MCRP-DWG-ANG-ST-4111 Rev.30, MCRP-DWG-ANG-ST-4121 Rev.30,
MCRP-DWG-ANG-ST-4202 Rev.31, MCRP-DWG-CLA-AR-3423 Rev.31, MCRP-DWG-CLA-ST-4111 Rev.30 & MCRP-DWG-CLA-ST-4121 Rev.30

Description and Recommended solution where appropriate, with details of Cost and Time Impact (If any):

1. Kindly refer to the attached IFC drawings. Kindly clarify and provide details on the items clouded in the drawings. Also, please confirm what materials shall be used,
if any, for the protection of steel column between existing ground level and station plaza level.

2. Refer to MCRP-DWG-ANG-ST-4121 REV.30 and MCRP-DWG-CLA-ST-4121 REV.30 as per magenta cloud, please confirm if RC beam is disconnected with the
column or all of the loads from these RC beam will transition directly to foundation girder only. If the beam is connected to the steel column, please provide structural
details.

Requested By Company's Name : Vethin Wasuntarasook Signed : Date : 24-June-2022

Authorised Representative : The Contractor's representative/Project Manager


RESPONSE
1. Kindly see the attached sketch (1 and 2)

2. the B70 and walls will not be embedded to the columns to maintain the rigidity of the structure. Kindly refer to attached drawing.
Reviewed/Response Name : …………………………………………
Kenneth Endaya Date: 07/04/2022
Authorised Rep. Name : ………………………………………………
Siew Kam Leong Date: 07/05/2022
Comments Code from Engineer
NONO NONOC-B NONOC-C NOR

Document No. Revision Page No.


NSCR-ITD-N03-ZWD-PRO-QA-000001/02 No. 03 Date: March 22, 2021 1 of 1