You are on page 1of 1

MRCB GEORGE KENT SDN BHD

CONSTRUCTION AND COMPLETION OF LIGHT RAIL TRANSIT LINE 3 (LRT3)


FROM BANDAR UTAMA TO JOHAN SETIA

TECHNICAL QUERY

Company: Mudajaya Corporation Berhad Contract/Purchase Order: PRASARANA/GCS/CTT/2.0678/-


2017
Contract Name: Package GS01 Technical Query Number: KVLRT3-MCB-MRCBGK-GS01-
OVPR-TQ-000191
Attn: Mr. Leau Poh Bin (PM) Date Issued: 19-4-2018 Reply Requested by Date:
Reply within 7 days from PDP’s
Subject: STN 01 - Column Location Inconsistent received date.

Proposal/Query:

Refer to structural drawing attached KVLRT3-MRCBGK-GS01-STN01-SCW-RF-SEC-220703 (Rev.W00) & KVLRT3-MRCBGK-


GS01-STN01-SCW-RF-LOP-220702 (Rev.W00) the column shown inconsistent of location shown as highlighted. Kindly please
advise which view to follow?

Your early respond is highly appreciated. Thank you.

Specify Impact: Cost: Yes/No Schedule: Yes/No Safety: Yes/No Other:


Reference documents:
1. KVLRT3-MRCBGK-GS01-STN01-SCW-RF-SEC-220703 (Rev.W00)
2. KVLRT3-MRCBGK-GS01-STN01-SCW-RF-LOP-220702 (Rev.W00)

Documents Attached Yes/No Number of Pages: 3 (include this Page)


Requested by: Sign:

Ryan Kong Chuang Len

Date: 19-4-2018

Response:

Reference documents:

Documents Attached Yes/No Number of Pages


Responded by: Sign:

Print Name: Date:


Confirmation by TQ Closed Proceed to Design Change
ICM/SYSTEM:

Name: Date:

Site Instruction Required: Yes / No SI No:

Please pass completed TQ to Project Secretary for Registration & Distribution.


MRCBGK-PCM-FRM-000016 Page 1 of 1
Rev.02
28 JULY 2017

You might also like