You are on page 1of 2

HNTB Corporation Empire State Building Telephone (212) 594-9717

The HNTB Companies 350 Fifth Avenue, 57 th Floor Facsimile (212) 947-4030
Infrastructure Solutions New York, NY 10118 www.hntb.com

Letter of Transmittal

Transmittal No. COR0065 Project Name/No: 66131: NYSDOT Bruckner Redecking


Date: 5/31/18 RE: DRFI-0022 Underdeck Lighting Levels

To: Bill Groesbeck


Tully Construction Company, Inc.
Anton Said
Posillico, Inc.
Bill Groesbeck

Transm itting: Estimates/Proposals DRFI FDC Contract


Plans RFI NCR IDF (Issue Doc. Form)
Specifications Shop Drawing Agenda/Minutes Change Order
Technical Data/Reports NDC Comment/Response Quality Form
Form

Distribution: Internal DB Team Review Only (Not for Owner) For Submittal to Owner (Final)
For Submittal to Owner (In- Progress) Other

Sent Via: Upload to HNTB File Exchange Site (auto email to recipients)
Comments: Clarification on lighting illumination levels at 138th, 140th and 141st Intersections.

# of Form at File Latest


Ref No Description (hard copy,
Copies electronic) Type Date/Rev
1 Clarification on the underdeck/intersection Electronic PDF 05/31/2018
light levels

Transm itted For: Information Review and Comment Other


Approval Distribution

Copied To: Gary Tow Andre Luboff Frank Pfister


Steve Richards Jean Mariel Go Katie Theis
Adam Chalmers Stephen Rinnert Chris Tomaszewski
John Bryson Mashhood Siddiqui Jim Peterson

From : Garry Tow

DQAE Response:

Section 13.3.4 shall be revised to 3 Foot Candles, designs shall be in accordance with NYCDOT DSL
Standards.

Response Date: 6/8/2018


Response By: DV

5/31/18 Page 1 of 1 COR0065


NewYork State Department of Transportation
Request for Information (RFI)

Response Timeframe
Date: 05/25/2018 Requested: 3 Business Days
Contract No: D900040 Contract Name: Bruckner Viaduct Deck
RFI No: 0022 Replacements (Region 11)
To: NYSDOT Contractor: Tully/Posillico JV
Drawing
Reference: Various Reference: Roadway Lighting Design
Spec Reference: n/a Trade Contractor: n/a

Information Required & Proposed Solution:

Per Project Requirements - Part 3 Section 13.3.4:


“The Design-Builder shall furnish and install underdeck lighting at the 138th Street, 140th Street, and 141st Street
intersections to provide average lighting level below deck of 5 foot-candles (FC) encompassing the entire limits of
each..…….”

A meeting between NYCDOT Division of Street Lighting (DSL), and HNTB/Tully Posillico was held on April 26,
2018. During that meeting Mr. Akmal Mikhail from NYCDOT DSL directed that the underdeck/intersection
lighting at the three above mentioned intersections shall be designed to 3 FC average as opposed to the RFP
requirements of 5FC.

Please advise if 3 FC illumination level for the underdeck/At-grade lighting at 138th, 140th and 141st Intersections is
acceptable.

Section 13.3.4 shall be revised to 3 Foot Candles per NYCDOT Street Lighting
Standards.

Attachments: Yes X No Potential Impact to: Schedule: Days: Cost: Approx.

Firm:
HNTB
Firm Name Signed

05/30/2018 06/04/2018 Garry Tow


Date Date Required Printed

Response:

Firm:
Firm Name Signed

Date Printed

This is not an authorization to proceed with work involving additional cost or time. Provide written notification in
response to the RFI prior to proceeding with work if any response causes a change to the contract scope of work.
The use of a