Daily Drilling Report ‫کد فرم‬: FO-TO-086-03

Rig Name: NOOR 1 Location: E010 Drilling Supervisor: H.Parvizi / M.T.Ashtiani Date: 99.12.30 20-Mar-21
Well NO: 13 Rig Manager Asst. Drilling Supervisor: Released: 99.05.24 14-Aug-20
Field DANAN Rig Supt.: M.AKBARI Geologist: S.Hosseini / S.Kiamarzi Spud: 99.06.25 15-Sep-20
Client: I.C.O.F.C D.Toolpusher: A.SAEEDI Operator Area Manager: M.Amini / I.Birgani Act . Rig Days: 187
Well Type: PG N.Tourpusher: A.SOHRABI Completion/Drilling ENG: Monfared Rig Planned Days: 139
Planned TD(m) : 3536.5 Rotating TIME: Mid Night Depth (m): 3512 6:00 Hrs Morninig Depth (m): 2610
R.T.A (m): 294.7 Sliding TIME: Previous Depth (m): 3512 6:00 Hrs Morning Bit Depth (m): 2610
Cumulative TIME: 1006 Drilling TIME: 0 Actual Progress MD/TVD (m): 0.0 DAILY AVG ROP (m/hr): #DIV/0!
BHA TALLY BIT RECORD MUD REPORT MUD PUMP DRILLING INFORMATION
BHA No. / RIH DTAE #65 99/12/20 Bit No. Mud Type WBM Pump #1 #2 #3 WOB (Klbs)
No. ITEM OD Qty Length (m) Bit Type: Mud WT (pcf) 80 Liner ID (in) 6 6 6 Surface RPM
1 H.W.S 7" 1 5.75 Bit Size (in) Viscosity (sec) 42 Efficiency % 95 95 95 Motor RPM
2 T.MILL 6" 1 2.92 Serial No PV (cp) 17 SPM Apparent String Wt (Klbs)
3 R.TOOL 4 4/5 1 1.35 Type YP (lb/100 ft^2) 16 GPM 0 0 0 Pick Up Wt (Klbs)
4 H.D.P 3 1/2 1 9.17 IADC Code Gels 10'' / 10' 3-Jan 4.6 SLOW CIRC. RATE (SCR) Slack off Wt (Klbs)
5 G.SUB 4 3/4 1 0.4 Manufacturer FL Loss (cc) 2 2.6 MD/TVD (m): TIME: Drag Up (Klbs)
6 D.C 4 3/4" 18 169.51 TFA ( in²) 0.000 PH/Alk 9.4 Pump #1 #2 #3 Drag Down (Klbs)
7 DP 3 1/2" 24 231.46 Nozzle Velocity #DIV/0! Stability (volt) SPM #1 Off Btm torque (K ft.lbs)
8 XOS 6 1/2 1 0.97 Depth in (m) Hardness 1000 PSI On Btm torque (K ft.lbs)
9 Depth out (m) Solid% 15% SPM #2 Total Flow Rate (GPM) 0
10 Total Drill (m) 0 0 Water% 84% PSI Stand Pipe Press (PSI )
11 Total Hrs Oil% 1 MUD PITS INFORMATION LIQUIDS & MUD ADDCITIVES
12 AVG ROP #DIV/0! #DIV/0! Chlorides 100000 PIT CAP bbl VOL bbl MW pcf Item USED On Hand
13 (mph)
Hydro.Static Pre (PSI) 6406 Solid Cont Loss Suction 181 80 Diesel (Liter) RIG 4000 79200
14 IADC Dull Grading Surface Loss Middle 35 78 Diesel (Liter) CAMP 400 11900
15 Inner R. Wears Downhole Loss Desilter 17 78 Drill Water (BBL) 1600
16 Outer R. Wears HYDRUALICS Desander 17 78 FRESH WATER (Liter)
TOTAL BHA Length (m) 421.53 Dull Charact. DC_Ann Vel (fpm) #N/A Degaser 18 78 Lime (SX 25 KG)
DRILLIN-LINE TON-MILE 1795 Location HSI #DIV/0! Total Active 268 Barite ( BIG BAT 1.5 TON)
Drilling Line Reserve (Ft) 4276 Bearing Seals Impact Force Lb #DIV/0! Reserve 1 134 80 SALT (BIG BAG 1 TON)
JAR Gauge Bit Press Drop #DIV/0! Reserve 2 Limstone (BIG BSG 1 TON)
Type Size: Other Dull Bit HHP #DIV/0! Reserve 3 CaCl2
S/N: Hrs: Reason Pulled Pumps HHP 0.0 Reserve 4 48 80
Current Bit Nozzle Size (1/32") :

RIG TIME DISTRIBUTION QHSE Solid Control Equipments PERSONNEL


CODE OPERATION Hrs STOP CARD TODAY 4 Shaker 1 Desander ICOFC 4 VIRA 2
1 Rig UP / DOWN / MOVING STOP CARD TOTAL 893 Shaker 2 Desilter MDCO 39 M.LOG 6
2 DRILLING /DRILL OUT DRILLS Date Shaker 3 2 M.Cleaner RIG CREW 13 CATERING 17
3 REAMING Trip Drill 8-Jun-20 Centrifg1 S.Colon SECURITY 6 GUEST 9
4 CORING Centrifg2 Disch. Wt LOCAL WORKER 5 TOTAL 101
5 CIRCULATING & MUD CONDITION Sour Gas Drill CASING DATA
6 TRIPS Fire Drill CASING SIZE WEIGHIT THREAD DEPTH SHOE LENGTH LINER LAP DATE OF
GRADE (TVD/MD)
7 RIG SERVICE 1 Rig Evacuation Drill (in) (ppf) TYPE (m) (TVD/MD) RUNNING

8 RIG REPAIR No. Of Drills Run Today 20 K55 106.5 WSP-Big 57.5 57.5
N-80 & T-
9 SLIP & CUT First Aid Cases 13 3/8 68 BTC 1415.5 1415.5
95
HC-95SS
10 DEVIATION SURVEY Last LTI Date 11-May-20 9 5/8 53.5 WSP-3T 2455.5 2455.5
& T-95
11 WIRELINE LOGS DAYS SINCE LAST 7 L-80 29 PJE 3420 1045 2375
12 RUN CASING & CEMENTING LTI 313 5
13 WAIT ON CEMENT (WOC) INSPECTION VISIT BOP DATA
14 NIPPLE UP/DOWN BOP SPILL BOP TYPE ANNULA TOP BLIND BOTTOM LAST BOP TEST 06-Mar-21
15 BOP TEST MEDIVAC SIZE R RAMS ELAPSED DAY 14
13 5/8 13 5/8 13 5/8 13 5/8
16 DRILL STEM TEST (DST) PRESSURE 5K 10K 10K 10K NEXT BOP TEST DATE 20-Mar-21
17 PLUG BACK
GEOLOGY
18 SQUEEZ CEMENT
19 FISHING FORECAST ACTUAL
FORMATION LITHOLOGY
20 DIRCETIONAL DRILLING Top MD (m) TopTVD (m) Top MD(m) Top TVD (m)
21 COILD TUBING Gurpi 3311 3293 Lst
22 DOWN HOLE TEST Ilam 3356.5 3332 Lst
23 PERFORATION Sarvak 3440.5 3411 Lst + Cyst
24 WELL CONTROL Well TD 3536.5
25 COMPLEATION
SAFETY
26 TREATING
27 STUCK PIPE & JARRING /WASHOUT No.of Incident No.of Accident Short Description of Incident / Accident
28 DOWN HOLE PROBLEM 23
29 RIG CONTRACTOR
Day Shift
30 SERVICE COMPANY
Wait On

PJSM Subject:
31 WEATHER
Night Shift
32 EPD CONTRACTOR
33 WAITING ON RIG CONTRACTOR Operational Meeting Subject:
Training Subject at Site:
Total Hours 24
FOP 01 (1)
Daily Drilling Report ‫کد فرم‬: FO-TO-086-03

RIG NAME: NOOR 1 WELL NO: 13 DATE: 99.12.30 20-Mar-21

FIELD: DANAN Mid Night Depth (m): 3512 Rig Planned Days: 139

CLIENT I.C.O.F.C Morning Depth (m): 2610 Act . Rig Days: 187

Duration Operation
From To Hours Code RIG TIME DESCRIPTION
00:00 16:00 16 33 Continue RIH with 7" hydraulic whipstock assembly from 75 m to 1600 m with drifted DPs (F/U the string with HVP at 215m).

16:00 17:00 1 7 Work on koomy unit (pressure switch & KR valve leakage).

17:00 00:00 7 33 Continue RIH with 7" hydraulic whipstock assembly from 1600 m to 2500 m with drifted DPs.

00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00 Rig Shortage:

00:00 00:00 1- Some caravans facilities are not completed.

00:00 00:00
00:00 00:00
00:00 00:00

SUM 24 MORNING REPORT


00:00 01:30 1.5 33 Continue RIH with 7" hydraulic whipstock assembly from 2500 m to 2598 m with drifted DPs. String took weight at 2598 m.
01:30 06:00 4.5 33 R/U Asmari wireline running equipment. RIH with gyro from surface to 2200 m.
06:00 06:00
06:00 06:00
06:00 06:00
06:00 06:00
06:00 06:00
06:00 06:00

RIG OFFLINE ACTIVITY


‫ *** کار روی کومی یونیت‬3-1/2 ‫شستشوی جوی های مخازن گل و دکل و پاکسازی محوطه لوکیشن***ادامه کار روی در آوردن رابیت دردرون لوله‬

DIRECTIONAL INFORMATION
Sliding Hours: 0 Sliding
Intervals:
Rotating Hours: 0 Rotating
Intervals:
SURVEY DATA Ref. Azimuth:
No. Tool MD - m INC ° Azimuth ° TVD - m N/S (+/-) E/W (+/-) V. Section D/L °/30 ft D/L °/100 ft

Rig & Camp Oil Consumtion Vehicle Report


Type Daily (Lit) Stock (Lit) Type Daily (Lit) Stock (Lit) Vehicle Work Hrs Remarks
Shell Hyd 32 Behran 85 w 90 1010 1 Water Tanker 24
Behran Hyd 32 580 Shell Eng Oil 15 w 40 1 Mini Bus 24
Shell Hyd 46 0 Behran Eng Oil 15 w 40 90 1 Pick Up 24
Behran Hyd 46 290 Shell 20 w 50 1 Ambulance 24
Shell 85 w 140 400 Shell Hyd Oil 10 1 Khavar 24
Behran 85 w 140 Total Hyd Oil 68 690 1 LIFT TRUCK 0
Shell 320 Comp Oil Sullube 32 430 25 TON CRANE 24
Behran 320 200 Water/R Elc 25 TON MUD CRANE 24
Shell 85 w 90 0 GEAR OIL 50
90 BOP DRILL
BOP DRILLING RAMS CLOSE TIME WELL SECURe TIME
ACCUMULATOR PSI 2750 3000
Recharge
DRILLS TRIP 30 Sec 140 Sec FINAL
Sec 15 30
TOOLS AND MATERIAL REQUEST ‫کد فرم‬: FO-TO-086-03
‫توضیحات‬

SAP RESERVE/
NO DESCRIPTION QTY UNIT DATE PR/NO COMMENTS
ORDER
1
PIN FOR RIG TONG TYPE H 6 EA 42314 1399/07/30 ‫ایوب مرتضویان‬
2
PIN FOR RIG TONG TYPE AAX 6 EA 42314 1399/07/30 ‫ایوب مرتضویان‬
3
ELECTROD HOLDER 550A 2 EA 42318 1399/07/30 ‫ایوب مرتضویان‬
4
‫گریس خور واش پایپ‬ 10 EA 42319 1399/07/30 ‫ایوب مرتضویان‬
5
‫کلمس پانی راد‬ 3 ‫عدد‬ 47725 99.08.24 ‫علی افروزی‬
6
‫دمپنر‬ 1 ‫عدد‬ 41359 99.08.24 ‫علی افروزی‬
7
RING GASKET RX24 5 ‫عدد‬ 58713 99/10/06 ‫علی افروزی‬
8
INSERT FOR SLIPS 5" 108 EA 66399 99.10.04 ‫علی افروزی‬
9
INSERT FOR SLIPS 3-1/2" 60 EA 66399 99.10.04 ‫علی افروزی‬
10
TOTCO OIL 6 L 66399 99.10.04 ‫علی افروزی‬
11
BUFFEL 5F6R 2 EA 66402 99.10.04 ‫علی افروزی‬
12
LINER7" 12 EA 66405 99.11.04 ‫علی افروزی‬
13
RUBBRE 7" 25 EA 66405 99.11.04 ‫علی افروزی‬
14
SPRING 8 EA 66405 99.11.04 ‫علی افروزی‬
15
‫ متری‬30 ‫متر‬ 1 ‫عدد‬ 64473 99.10.27 ‫ایوب مرتضویان‬
16
WASH PIPE PACKING 1 EA 79505 99.12.24 ‫ایوب مرتضویان‬
17
WASH PIPE BARREL 2 EA 79505 99.12.24 ‫ایوب مرتضویان‬
18
DOPE 40 KG 79505 99.12.24 ‫ایوب مرتضویان‬
19
CYLINDER COVER SEAL 20 EA 79506 99.12.24 ‫ایوب مرتضویان‬
20
LINR SEAL 20 EA 79506 99.12.24 ‫ایوب مرتضویان‬
21
TOTCO OIL 5 L 80252 99.12.27 ‫اافشین سعیدی‬
22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

44

45

46

47

48

49

50
51

52

53

54

55

56

57

58
TOOLS AND MATERIAL SENT ‫کد فرم‬: FO-TO-086-03

SAP RESERVE
NO DESCRIPTION QTY UNIT NUMBER DATE REMARKS

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63
TOOLS AND MATERIAL RECEIVED ‫کد فرم‬: FO-TO-086-03

SAP RESERVE
NO DESCRIPTION QTY UNIT PART NO NUMBER
DATE REMARKS

1 PIPE JOINT 2 ‫شاخه‬ 26150 99/12/30 2‫دریافت از نور‬


2 ‫تنی‬500 ‫لینک‬ 1 ‫جفت‬ 26150 99/21/30 2‫دریافت از نور‬
3

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61
TOOLS AND MATERIAL SENT ‫کد فرم‬: FO-TO-086-03

SAP RESERVE
NO DESCRIPTION QTY UNIT PART NO DATE REMARKS
NUMBER

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65
CODE MAIN OPERATION ACTIVITY

01 RIG UP / TEAR DOWN / MOVE

02 DRILLING

03 REAMING

04 CORING

05 CIRCULATE & CONDITION MUD


05 CIRCULATE & CONDITION MUD

06 TRIPS

07 SERVICE RIG

08 REPAIR RIG

09 SLIP AND CUT

10 DEVIATION SURVEY

11 WIRELINE LOGS
12 RUN CASING & CEMENT

13 WAIT ON CEMENT

14 RIG UP/DOWN BOP

15 TEST BOP

16 DRILL STEM TEST

17 PLUG BACK
17 PLUG BACK

18 SQUEEZE CEMENT

19 FISHING

20 SPECIALIZED DIRECTIONAL WORK

21 COILED TUBING

22 DOWNHOLE TEST
22 DOWNHOLE TEST

23 PERFORATION

24 WELL CONTROL

25 COMPLEATION

26 TREATING

27 STUCK & JARRING / WASHOUT


27 STUCK & JARRING / WASHOUT

28 CHANGE RAMS

29 WAIT ON RIG CONTRACTOR

30 WAIT ON SERVICE COMPANY

31 WAIT ON WEATHER

32 WAIT ON EPD CONTRACTOR

33 Other Down Hole Problem


SUB_OPERATION CODE

A- Drilling Ahead in Formation

B- Hole Opening (With Bit)

C- Drill Out Cement

D- Milling

E - Clean out Shoe Track

A - Back Ream

B - Down Ream

A - Cut Core

B - Retrive Cores From Bareel

A - Circulatioin In Hole
B - Displace Mud
C - Mud Conditioning

A - Trip in (RIH)

B - Trip out (POOH)


C - Wiper Trip
D- Make in BHA
E - Set Back
F - Lay Down Drill Pipe

A- Rig-up Wireline
B - Rig-Down Wireline
C - Run Wireline
A - Rig-up/down Casing Handling Equipment

B - Run Casing
C - Run Liner
D - Set Casing
E - Rig-up/down Cement Job
F - Pressure Test Cement Line
G - Cement Job

A - Cut Casing
B - Instal Casing Head

C - Nipple up/down Diverter

D - Nipple up/down BOP

E - Nipple up/down Bell Nipple

F -Run and Set Wear Bushing


A - Function Test

B - Pressure Test
A - Rig-up/Down Coil Tubing

B - Run Coil Tubing

C - N2 liftting

D - Acidizing

A - Perform FIT

B -Perform LOT

C - Liner Lap Test (dry test)


D- Casing Pressur Test

A - Perforating On Drill Pipe

B - Perforating On Wireline

A - Flow Check

B- BOP Drill

C - Shut in Well

D- Well Pressure Build up

E- Weighit Up Kill mud

F - Well Kill

G - Bullheading

H - Divertring

A - Compleation String Running

B - Compleation Test

C - Displace Compleation Fluid

A - Stuck
B - Jar up
C - Jar down

D - Trip For Finding Wash out

E - lay-down washed Joint


Rig up is the on-site erection and connection of rig components in p
components have arrived at the wellsite, and ends when the rig is rea
well and preparing it for moving to the next location. Tear Down be
when the last rig component has left the wellsite. This section also in
released from previous well, End: Rig fully rigged up, acceptance te

Drilling is boring a hole into the earth with the purpose of finding an
drilling out shoe tracks and dressing off cement plugs. Time starts o

Reaming refers to the operations of smoothing the wellbore, enlargin


Reaming begins when the rig begins rotating and circulating for any
circulation cease.

Coring is the extraction from the wellbore of a cylindrical sample fo


cylindrical sample of rock. Coring ends when the process of capturin

Conditioning is the process of preparing the drilling fluid (“mud”) to


means pumping the fluid through the drill pipe. Process begins when
and pumps shut down.
Conditioning is the process of preparing the drilling fluid (“mud”) to
means pumping the fluid through the drill pipe. Process begins when
and pumps shut down.

Tripping is the process of lowering or recovering the BHA to or from


BHA from desired depth, and ends when the BHA has reaches the d
partially recover and lower the BHA to a desired depth to ensure the
mud-weight sufficiency.

Rig Service and maintenance is the process of prolonging equipmen


can be further sub-classified into time-based, condition-based and us
when the equipment is back in service.

Rig repair is a reactive process to correct unknown or unanticipated


begins when the equipment fails, and ends when the equipment is ba

Replacing drill line begins when the drawworks is removed from ser
activity involves spooling in a new supply line and moving worn lin

The deviation survey is the process of measuring borehole trajectory

Wireline logging is the process of taking formation measurements o


when the logging tools are assembled and run into the hole, and end
The operation includes all procedures necessary to run casing into th
Operation begins when casing equipment is rigged up, and ceases w

Waiting on Cement (WOC) is the time during which drilling or com


Begins when cement pumps are shut down, and ends following tests

This operation refers to dry BOP stacks, i.e., BOPs that are not subse
begins assembling the unit. Rig up ceases when the complete BOP s

BOP testing begins when the process of checking the device for func

The drill stem test begins with picking up temporary packers used to

Plugging back begins when the plug or cement head is run into the h
Plugging back begins when the plug or cement head is run into the h

Squeeze cementing begins when the process of rigging up squeeze c

Fishing begins when the fishing assembly is rigged up or picked up,


decision has been taken to commence a fishing operation, or when it
the hole. Ends: When resuming operations as carried out prior to the
commencing drilling operations would typically still be part of this o

Specialized directional work begins when the drill bit and assembly
assembly and drill bit have been rigged down. Otherwise, this catego

Coiled-tubing operations begins when the equipment is run into the


Operations applying technology focused on maintaining pressure on
fluids into the wellbore. Starts: With the first indication of a well co
when the well is being closed in if no flow check has taken place. En
of the well control phase at the same depth.

A treatment performed to restore or enhance the productivity of a we


treatments. Start: End of previous operation. End: With the comple