Daily Drilling Report ‫کد فرم‬: FO-TO-086-03

Rig Name: Location: Drilling Supervisor:


NOOR 1 0.03 H/JALILZADEH Date: 1402/02/09 29-Apr-23
Well NO: 082/E1685 Operations Manager J.SARVIZADEH Asst. Drilling Supervisor: M.ABRAND Released: 1401/05/05
Field KHANGIRAN Rig Supt.: Operations / Area Manager M.AMINI /M.ALIABADI Spud: 1401/12/22 13-Mar-23
Client: IGEDC D.Toolpusher: P.PARSI Geologist: N. DASHTI Act.Rig Days: 48
Well Type: N.Tourpusher: GH.SHOJAEE ICOFC Rep: Rig Planned Days: 121
Planned TD(m) : 3060 Rotating TIME: 24 MID Night 1785 6:00 Hrs Morninig Depth (m): 1796
R.T.A (m): 435.5 Sliding TIME: prevlous depth(m) 1688 6:00 Hrs Morning Bit Depth (m): 1796
Cumulative TIME: 409 Drilling TIME: 0 Actual Progress MD/TVD (m): 97.0 DAILY AVG ROP (m/hr): #DIV/0!

BHA TALLY BIT RECORD MUD REPORT MUD PUMP


BHA No. / RIH DATE BHA#15 1402/02/06 Bit No. 6 Mud Type KLC-POLYMER Pump #1 #2 #3 WOB 15-20

No. ITEM OD QTY LENGTH Bit Type: M1665 Mud WT (pcf) 86 Liner ID (in) 6 1/2 6 1/2 6 1/2 Surface RPM 140-160
1 PDC. Bit 12 1/4" 1 0.35 Bit Size (in) 12 1/4 Viscosity (sec) 41 Efficiency % 95 95 95 Motor RPM

2 Bit Sub 8 1/2 1 1.18 Serial No 248711 PV (cp) 16 SPM 74 75 Apparent String Wt (Klbs) 220
3 DC 8 1/2" 2 18.21 Type PDC YP (lb/100 ft^2) 9 GPM 364 368 0 Pick Up Wt (Klbs)

4 S/STABILIZER 12 1/4 1 1.8 IADC Code M322 Gels 10'' / 10' 2//5 SLOW CIRC. RATE (SCR) Slack off Wt (Klbs) 58
5 DC 8 1/2 10 91.11 Manufacturer BEST FL Loss (cc) 4.9 MD/TVD (m): 1775 TIME: 19:20 Drag Up (Klbs)

6 D/JAR 7 3/4 1 5.17 TFA ( in²) 0.994 PH/Alk 9/9//5 5 Pump #1 #2 #3 Drag Down (Klbs)

7 DC 8 1/2" 3 27.35 Nozzle Velocity Stability (volt) 253000 SPM #1 49 49 50 Off Btm torque (K ft.lbs)

8 XOS 7 5/8 1 0.61 Depth in (m) 1519 Hardness 1600 PSI 200 200 200 On Btm torque (K ft.lbs) 4-5
9 HW 5 6 56.56 Depth out (m) Solid% 24% SPM #2 65 65 66 Total Flow Rate (GPM) 732
10 Total Drill (m) Water% 76% PSI 400 400 400 Stand Pipe Press (PSI ) 1850
11 Total Hrs 88+48/5 Oil% 0% MUD PITS INFORMATION LIQUIDS & MUD ADDCITIVES
12 AVG ROP (mph) #VALUE! Chlorides 174000 PIT CAP bbl VOL bbl MW pcf Item USED On Hand
13 Hydro.Static Pre (PSI) 3500 Solid Cont Loss Suction 189 84 Diesel (Liter) RIG 8600 55300
14 IADC Dull Grading Surface Loss Desiltter 80 84 Diesel (Liter) CAMP 500 10600
15 Inner R. Wears Downhole Loss MIDDLE 215 84 Drill Water (BBL) 900
16 Outer R. Wears HYDRUALICS Desander FRESH WATER (Liter)

202.34 Dull Charact. DC_Ann Vel (fpm)


#VALUE! Degaser Lime (SX 25 KG)
TOTAL BHA Length (m)
DRILLIN-LINE TON-MILE 418 Location HSI 0.00 Total Active Barite ( BIG BAT 1.5 TON)

Drilling Line Reserve (Ft) 3031 Bearing Seals Impact Force Lb 0.0 Reserve 1 26 84 SALT (BIG BAG 1 TON)

JAR Gauge Bit Press Drop 0.0 Reserve 2 99 84 Limstone (BIG BSG 1 TON)

Type DRILLING JAR Size: 7 3/4 Other Dull Bit HHP 0.0 Reserve 3 122 84 SEND TO CAMP

S/N: 5060045 Hrs: 54 Reason Pulled Pumps HHP 790.1 Reserve 4 70 84 Diesel Received

Current Bit Nozzle Size (1/32") : 12.32 12.32 12.32 12.32 12.32 12.32 12.32 12.32 12.32

RIG TIME DISTRIBUTION QHSE Solid Control Equipments PERSONNEL


CODE OPERATION Hrs STOP CARD TODAY 2 Shaker 1 Desander ICOFC 2 IRAN. 15
FAJR*SYRUS
1 Rig UP / DOWN / MOVING STOP CARD TOTAL 112 Shaker 2 Desilter MDCO 34 M.LOG 6

2 DRILLING /DRILL OUT 24 DRILLS Shaker 3 M.Cleaner RIG CREW CATERING 16

3 REAMING Trip Drill Centrifg1 S.Colon SECURITY 12 GUEST+Driver 21

4 CORING Centrifg2 Disch. Wt LOCAL WORKER 4 TOTAL 110

5 CIRCULATING & MUD CONDITION Sour Gas Drill CASING DATA


6 TRIPS Fire Drill 0
CASING SIZE WEIGHIT THREAD LINER LAP
GRADE DEPTH SHOE (TVD/MD) LENGTH (m) DATE OF RUNNING
Rig Evacuation Drill (in) (ppf) TYPE (TVD/MD)
7 RIG SERVICE
8 RIG REPAIR No. Of Drills Run Today K-55 106.5 WSP-BIG 17 1/5 17 1/5
20
9 SLIP & CUT First Aid Cases N-80 72-68-72 BTC 1512 23-1121-386
13 3/8
10 DEVIATION SURVEY Last LTI Date 23-Aug-22 9 5/8
11 WIRELINE LOGS DAYS SINCE LAST
7
12 RUN CASING & CEMENTING LTI 249
13 WAIT ON CEMENT (WOC) INSPECTION VISIT BOP DATA
SPILL BOP TYPE ANNULA TOP RAMS BLIND BOTTOM LAST BOP TEST
14 NIPPLE UP/DOWN BOP R

MEDIVAC SIZE 13 5/8 5 FIX 5K-13 5K-13 5/8 5 FIX 5K 13 5/8 ELAPSED DAY
15 BOP TEST 5/8

16 Formation Testing PRESSURE 2500 4000 4000 NEXT BOP TEST DATE

17 PLUG BACK
GEOLOGY
18 SQUEEZ CEMENT
19 FISHING FORECAST ACTUAL
FORMATION LITHOLOGY
20 DIRCETIONAL DRILLING Top MD (m) TopTVD (m) Top MD(m) Top TVD (m)

21 COILD TUBING KHANGIRAN SURF SURF CLST+GY MRL+S/ST+SH+LST

22 DOWN HOLE TEST CHEHEL-KAMAN 761 757.5 LST/ANHY+SH

23 PERFORATION PESTEH-LEIGH 963 962.5 R ST+LST+GY

24 WELL CONTROL KALAT 1042 1037 S ST+SDY+GY

25 COMPLEATION
SAFETY
26 RACK BACK
27 STUCK PIPE & JARRING /WASHOUT No.of Incident No.of Accident Short Description of Incident / Accident

28 DOWN HOLE PROBLEM


29 WAIT ON RIG CONTRACTOR
Day Shift
30 HOLE CONDITION
Wait On

PJSM Subject:
31 SERVICE COMPANY
Night Shift
32 Waiting on Client
33 Change Wash Pipe Operational Meeting Subject:

Training Subject at Site:


Total Hours 24
FOP 01 (1)
Daily Drilling Report ‫کد فرم‬: FO-TO-086-03

RIG NAME: NOOR 1 WELL NO: 082/E1685 DATE: 1402/02/09 29-Apr-23

Mid Night Depth


FIELD: KHANGIRAN 1785 Rig Planned Days: 121
(m):
Morning Depth
CLIENT IGEDC 1796 Act . Rig Days: 48
(m):

Duration Operation
From To Hours Code RIG TIME DESCRIPTION
00:00 00:00 Cont. Drlg 12 1/4" hole Section F/1688 m to 1750 m While B.Ream & Ream Down drilled STD & Pump Hi-Vis Pill Peridically & Inc. MW to 86 pcf

00:00 00:00 W/NL-NG.

00:00 05:30 5.5 2A Drlg Parameters : WOB: 4-15 klb, RPM: 150-160 , TQ: 2-5 klb.ft, F.R: 680 gpm, SPP: 1800-1900 psi, ROP: 11.27 mph

05:30 05:30 Cont. Drlg 12 1/4" hole Section F/1750 m to 1763 m While Pump Hi-Vis Pill W/NL-NG.

05:30 15:00 9.5 2A Drlg Parameters : WOB: 10-30 klb, RPM: 130-170 , TQ: 2-3 klb.ft, F.R: 600-750 gpm, SPP: 1500-2300 psi, ROP: 1.37 mph

15:00 15:00 Cont. Drlg 12 1/4" hole Section F/1763 m to 1774 m While B.Ream & Ream Down drilled STD & Pump Hi-Vis Pill W/NL-NG.

15:00 16:00 1 2A Drlg Parameters : WOB: 2-5 klb, RPM: 170 , TQ: 3-6 klb.ft, F.R: 750 gpm, SPP: 2300 psi, ROP: 11.0 mph

16:00 16:00 Cont. Drlg 12 1/4" hole Section F/1774 m to 1785 m While Pump Hi-Vis Pill Peridically W/NL-NG.

16:00 00:00 8 2A Drlg Parameters : WOB: 15-30 klb, RPM: 140-170 , TQ: 2-3 klb.ft, F.R: 750 gpm, SPP: 2300 psi, ROP: 1.37 mph
00:00 00:00
00:00 00:00 Note: B/R & R/D parameters: Drag: 0 Klbs, Rot.: 50-100 rpm, F.R: 600 gpm, SPP: 1600 psi, TQ: 1-2 klb*ft .

00:00 00:00 Note: D.DRLG time (19 hrs) + Take SCR 2 time (1.0 hr) , Pumping Pill , B/R & R/D & Connection time (4.0 hrs).

00:00 00:00
00:00 00:00 Note: rig personnel shortage: 1 person roughneck + 1 person mud examiner.

00:00 00:00 Note: M/U 5" DP connections 10 % more than optimum M/U torque.

00:00 00:00 Note: M/U tubulars based on CSG running TQ cylinder & TQ gauge, Max Limit of CSG running torque cylinder gauge is 60000 lb.ft

00:00 00:00 Note : Work On Mud Rheology to Increase YP.

00:00 00:00
00:00 00:00
00:00 00:00 ‫ لیتری‬29000 ‫درخواست یک لود گازوییل‬
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
SUM 24 MORNING REPORT
00:00 00:00 Cont. Drlg 12 1/4" hole Section F/1785 m to 1796 m While B.Ream & Ream Down drilled STD & Pump Hi-Vis Pill Peridically W/NL-NG.

00:00 00:00 6 2A Drlg Parameters : WOB: 20 - 30 klb, RPM: 140-170 , TQ: 2-3 klb.ft, F.R: 750 gpm, SPP: 2300 psi, ROP: 1.83 mph

00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
00:00 00:00
RIG OFFLINE ACTIVITY

DIRECTIONAL INFORMATION
Sliding Hours: 0 Sliding
Intervals:
Rotating Hours: 24 Rotating
Intervals:
SURVEY DATA Ref. Azimuth:
No. Tool MD - m INC ° Azimuth ° TVD - m N/S (+/-) E/W (+/-) V. Section D/L °/30 ft D/L °/100 ft

Rig & Camp Oil Consumtion Vehicle Report


Type Daily (Lit) Stock (Lit) Type Daily (Lit) Stock (Lit) Vehicle Work Hrs Remarks

GEAR OIL 140 455 Behran 85 w 90 1 Water Tanker 24


GEAR OIL 320 95 Shell Eng Oil 15 w 1 Mini Bus 24
GEAR OIL 90 385 40
Behran Eng Oil 15 1 Pick Up 24
COMPRESSOR OIL32 315 w 40 20 w 50
Shell 1 Ambulance 24
Hyd. Oil 32 1040 Shell Hyd Oil 10 1 Khavar 24
Hyd. Oil 46 420 Total Hyd Oil 68 1 LIFT TRUCK 0
OIL HYD 68 180 Comp Oil Sullube 25 TON CRANE 24
OIL15w40 1400 32
Water/R Elc 25 TON MUD 24
CRANE
BOP DRILL
RAMS CLOSE
BOP DRILLING WELL SECURe ACCUMULATOR PSI
TIME Recharge
DRILLS TRIP Sec TIME Sec FINAL Sec
‫‪TOOLS AND MATERIAL REQUEST‬‬ ‫‪: FO-TO-086-03‬کد فرم‬
‫توضیحات‬

‫‪SAP RESERVE/‬‬
‫‪NO‬‬ ‫‪DESCRIPTION‬‬ ‫‪QTY‬‬ ‫‪UNIT‬‬ ‫‪DATE‬‬ ‫‪COMMENTS‬‬ ‫‪PR‬‬
‫‪ORDER‬‬
‫‪1 PIN FOR RIG TONG TYPE H‬‬ ‫‪6‬‬ ‫‪EA‬‬ ‫‪42314‬‬ ‫‪1399/07/30‬‬ ‫‪4400000405‬‬

‫‪2 PIN FOR RIG TONG TYPE AAX‬‬ ‫‪6‬‬ ‫‪EA‬‬ ‫‪42314‬‬ ‫‪1399/07/30‬‬ ‫‪4400000405‬‬

‫کلمس پانی راد ‪3‬‬ ‫‪3‬‬ ‫عدد‬ ‫‪47725‬‬ ‫‪99.08.24‬‬ ‫‪4400000869‬‬

‫"‪4 INSERT FOR SLIPS 5‬‬ ‫‪108‬‬ ‫‪EA‬‬ ‫‪66399‬‬ ‫‪99.11.04‬‬ ‫‪4400000867-4400001095‬‬

‫"‪5 INSERT FOR SLIPS 3-1/2‬‬ ‫‪60‬‬ ‫‪EA‬‬ ‫‪66399‬‬ ‫‪99.11.04‬‬ ‫‪4400000867‬‬

‫‪6 SAFETY VALVE ROD‬‬ ‫‪3‬‬ ‫عدد‬ ‫‪13977‬‬ ‫‪400/07/28‬‬ ‫‪4400001416‬‬

‫‪7 SEAT PULLER FOR MUD PUMP‬‬ ‫‪1‬‬ ‫عدد‬ ‫‪151307‬‬ ‫‪1400/08/26‬‬ ‫‪4400001513‬‬

‫‪8 RX54‬‬ ‫‪2‬‬ ‫‪NO‬‬ ‫‪162446‬‬ ‫‪1400/09/19‬‬ ‫‪4400001595‬‬

‫‪9 FLOAT VALVE 2F3R‬‬ ‫‪1‬‬ ‫‪EA‬‬ ‫‪162449‬‬ ‫‪1400/09/17‬‬ ‫‪4400001584‬‬

‫‪10 Baffle 5F6R   ‬‬ ‫‪2‬‬ ‫‪EA‬‬ ‫‪130279389‬‬ ‫‪1402/01/15‬‬ ‫‪4400002674‬‬

‫اسکرین لوله "‪11 5‬‬ ‫‪3‬‬ ‫عدد‬ ‫‪130279389‬‬ ‫‪1402/01/15‬‬ ‫‪4400002674‬‬


‫شیلنگ استیم ‪12‬‬ ‫‪2‬‬ ‫رول‬ ‫‪130279389‬‬ ‫‪1402/01/15‬‬ ‫‪4400002674‬‬
‫‪13 I.Boptds lower‬‬ ‫‪1‬‬ ‫عدد‬ ‫‪130279389‬‬ ‫‪1402/01/15‬‬ ‫‪4400002674‬‬
‫‪14 TDS UPPER I.BOP‬‬ ‫‪1‬‬ ‫عدد‬ ‫‪130279389‬‬ ‫‪1402/01/15‬‬ ‫‪4400002674‬‬
‫سیت پمپ گل ‪15‬‬ ‫‪30‬‬ ‫عدد‬ ‫‪130279389‬‬ ‫‪1402/01/15‬‬ ‫‪4400002674‬‬
‫کابل ایرهوست ‪ 5/8‬یکسرتیمبل ‪ 120‬متری ‪16‬‬ ‫‪2‬‬ ‫رول‬ ‫‪130279389‬‬ ‫‪1402/01/15‬‬ ‫‪4400002674‬‬
‫‪17 STEM PUP VALVE‬‬ ‫‪3‬‬ ‫عدد‬ ‫‪130279390‬‬ ‫‪1402/01/15‬‬ ‫‪4400002675‬‬ ‫‪1300006592‬‬
‫‪18 KIT PUP VALVE‬‬ ‫‪5‬‬ ‫عدد‬ ‫‪130279390‬‬ ‫‪1402/01/15‬‬ ‫‪4400002675‬‬ ‫‪1300006592‬‬
‫‪19‬‬ ‫‪BUFFER‬‬ ‫‪5‬‬ ‫عدد‬ ‫‪130279390‬‬ ‫‪1402/01/15‬‬ ‫‪4400002675‬‬ ‫‪1300006592‬‬
‫‪20‬‬ ‫کپ پایین مازوئل پمپ گل‬ ‫‪4‬‬ ‫عدد‬ ‫‪130279390‬‬ ‫‪1402/01/15‬‬ ‫‪4400002675‬‬ ‫‪1300006592‬‬
‫‪21‬‬ ‫فنر ولو پمپ گل‬ ‫‪20‬‬ ‫عدد‬ ‫‪130280046‬‬ ‫‪1402/01/18‬‬ ‫‪4400002681‬‬
‫‪22‬‬ ‫برس سیمی‬ ‫‪30‬‬ ‫عدد‬ ‫‪130280046‬‬ ‫‪1402/01/18‬‬ ‫‪4400002681‬‬
‫‪23‬‬ ‫دبل پین تاپ درایو‬ ‫‪1‬‬ ‫عدد‬ ‫‪130280493‬‬ ‫‪1402/01/20‬‬ ‫‪4400002690‬‬
‫‪24‬‬ ‫دسته بریک ترمز برقی کابین حفار‬ ‫‪120001679‬‬ ‫‪1402/01/24‬‬
‫‪25‬‬ ‫الینر ‪6 1/2‬‬ ‫‪10‬‬ ‫عدد‬ ‫‪130283298‬‬ ‫‪1402/02/01‬‬ ‫‪4400001991‬‬
‫‪26‬‬ ‫‪K , 10 K‬چک ولو ‪5‬‬ ‫‪5‬‬ ‫عدد‬ ‫‪1300005304‬‬ ‫‪1402/02/01‬‬
‫‪27‬‬ ‫‪ BX 160‬رینگ گسکت‬ ‫‪6‬‬ ‫عدد‬ ‫‪130285190‬‬ ‫‪1402/02/08‬‬ ‫‪4400002719‬‬
‫‪ BX 152‬رینگ گسکت‬ ‫‪6‬‬ ‫عدد‬ ‫‪130285190‬‬ ‫‪1402/02/08‬‬ ‫‪4400002719‬‬ ‫‪1300006748‬‬
‫‪ BX 24‬رینگ گسکت‬ ‫‪5‬‬ ‫عدد‬ ‫‪130285190‬‬ ‫‪1402/02/08‬‬ ‫‪4400002719‬‬ ‫‪1300006748‬‬
‫‪ BX 39‬رینگ گسکت‬ ‫‪5‬‬ ‫عدد‬ ‫‪130285190‬‬ ‫‪1402/02/08‬‬ ‫‪4400002719‬‬ ‫‪1300006748‬‬
‫‪ BX 155‬رینگ گسکت‬ ‫‪4‬‬ ‫عدد‬ ‫‪130285190‬‬ ‫‪1402/02/08‬‬ ‫‪4400002719‬‬ ‫‪1300006748‬‬
‫‪ BX 154‬رینگ گسکت‬ ‫‪4‬‬ ‫عدد‬ ‫‪130285190‬‬ ‫‪1402/02/08‬‬ ‫‪4400002719‬‬ ‫‪1300006748‬‬
‫‪ BX 54‬رینگ گسکت‬ ‫‪2‬‬ ‫عدد‬ ‫‪130285190‬‬ ‫‪1402/02/08‬‬ ‫‪4400002719‬‬ ‫‪1300006748‬‬
‫‪28‬‬
‫آچار چپ و راست ریگ فلوریکسر تیمبل "‪1‬‬ ‫‪1‬‬ ‫عدد‬ ‫‪130285189‬‬ ‫‪1402/02/08‬‬ ‫‪4400002717‬‬
‫روغن تاتکو ‪29‬‬ ‫‪4‬‬ ‫لیتر‬ ‫‪130285191‬‬ ‫‪1402/02/08‬‬ ‫‪4400002718‬‬
‫فنر پمپ گل‬ ‫‪12‬‬ ‫عدد‬ ‫‪130285191‬‬ ‫‪1402/02/08‬‬ ‫‪4400002718‬‬
‫ماژوئل پمپ گل‬ ‫‪6‬‬ ‫عدد‬ ‫‪1320285538‬‬ ‫‪1402/02/09‬‬ ‫‪4400002722‬‬

‫‪31‬‬
TOOLS AND MATERIAL SENT ‫کد فرم‬: FO-TO-086-03

SAP RESERVE
NO DESCRIPTION QTY UNIT NUMBER DATE REMARKS

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59
60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101
TOOLS AND MATERIAL RECEIVED ‫کد فرم‬: FO-TO-086-03

SAP RESERVE
NO DESCRIPTION QTY UNIT PART NO DATE REMARKS
NUMBER
1

.0.

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61
‫‪TOOLS AND MATERIAL SENT‬‬ ‫‪: FO-TO-086-03‬کد فرم‬

‫‪SAP RESERVE‬‬
‫‪NO‬‬ ‫‪DESCRIPTION‬‬ ‫‪QTY‬‬ ‫‪UNIT‬‬ ‫‪PART NO‬‬ ‫‪DATE‬‬ ‫توضیحات‬
‫‪NUMBER‬‬
‫‪1‬‬
‫لوله پلیکا های مازاد در دکل به همراه اتصاالت‬ ‫‪1‬‬ ‫لود‬ ‫‪32996‬‬ ‫‪1402/02/09‬‬ ‫کمپ نور یک‬
‫‪2‬‬
‫کپسول اکسیژن‬ ‫‪3‬‬ ‫عدد‬ ‫‪32996‬‬ ‫‪1402/02/09‬‬ ‫گنبدلی جهت انتقال به مشهد برای شارژ‬
‫‪3‬‬
‫کپسول نیتروژن‬ ‫‪2‬‬ ‫عدد‬ ‫‪32996‬‬ ‫‪1402/02/09‬‬ ‫گنبدلی جهت انتقال به مشهد برای شارژ‬
‫‪4‬‬
‫بشکه ‪ 200‬لیتری گازوئیل پر‬ ‫‪1‬‬ ‫بشکه‬ ‫‪32997‬‬ ‫‪1402/02/09‬‬ ‫انبار کیسینگ‬
‫‪5‬‬

‫‪6‬‬

‫‪7‬‬

‫‪8‬‬

‫‪9‬‬

‫‪10‬‬

‫‪11‬‬

‫‪12‬‬

‫‪13‬‬

‫‪14‬‬

‫‪14‬‬

‫‪15‬‬

‫‪16‬‬

‫‪17‬‬

‫‪18‬‬

‫‪19‬‬

‫‪20‬‬

‫‪21‬‬

‫‪22‬‬

‫‪23‬‬

‫‪24‬‬

‫‪25‬‬

‫‪26‬‬

‫‪27‬‬

‫‪28‬‬

‫‪29‬‬

‫‪30‬‬

‫‪31‬‬

‫‪32‬‬

‫‪33‬‬

‫‪34‬‬

‫‪35‬‬

‫‪36‬‬

‫‪37‬‬

‫‪38‬‬

‫‪39‬‬

‫‪40‬‬

‫‪41‬‬

‫‪42‬‬

‫‪43‬‬

‫‪44‬‬

‫‪45‬‬

‫‪46‬‬

‫‪47‬‬

‫‪48‬‬

‫‪49‬‬

‫‪50‬‬

‫‪51‬‬

‫‪52‬‬

‫‪53‬‬

‫‪54‬‬

‫‪55‬‬

‫‪56‬‬

‫‪57‬‬

‫‪58‬‬

‫‪59‬‬

‫‪60‬‬

‫‪61‬‬

‫‪62‬‬

‫‪63‬‬

‫‪64‬‬

‫‪65‬‬
CODE MAIN OPERATION ACTIVITY

01 RIG UP / TEAR DOWN / MOVE

02 DRILLING

03 REAMING

04 CORING

05 CIRCULATE & CONDITION MUD


05 CIRCULATE & CONDITION MUD

06 TRIPS

07 SERVICE RIG

08 REPAIR RIG

09 SLIP AND CUT

10 DEVIATION SURVEY

11 WIRELINE LOGS
12 RUN CASING & CEMENT

13 WAIT ON CEMENT

14 RIG UP/DOWN BOP

15 TEST BOP

16 DRILL STEM TEST

17 PLUG BACK
17 PLUG BACK

18 SQUEEZE CEMENT

19 FISHING AND MILLING

20 SPECIALIZED DIRECTIONAL WORK

21 COILED TUBING

22 DOWNHOLE TEST
22 DOWNHOLE TEST

23 PERFORATION

24 WELL CONTROL

25 COMPLEATION

26 STRING PLUG

27 STUCK & JARRING / WASHOUT


27 STUCK & JARRING / WASHOUT

28 CHANGE RAMS

29 WAIT ON RIG CONTRACTOR

30 Other Down Hole Problem

31 Waiting on Client

32 WAIT ON EPD CONTRACTOR

33 Waiting on Service Company

34 WAIT ON WEATHER

35 Hole condition before logging


SUB_OPERATION CODE

A- Drilling Ahead in Formation

B- Hole Opening (With Bit)

C- Drill Out Cement

D- Milling

E - Clean out Shoe Track

A - Back Ream

B - Down Ream

A - Cut Core

B - Retrive Cores From Bareel

A - Circulatioin In Hole
B - Displace Mud
C - Mud Conditioning

A - Trip in (RIH)

B - Trip out (POOH)


C - Wiper Trip
D- Make in BHA
E - SCRAPPER TRIP
F - Lay Down Drill Pipe
A - Rig Services

A- Rig-up Wireline
B - Rig-Down Wireline
C - Run Wireline
A - Rig-up/down Casing Handling Equipment

B - Run Casing
C - Run Liner
D - Set Casing
E - Rig-up/down Cement Job
F - Pressure Test Cement Line
G - Cement Job

A - Cut Casing
B - Instal Casing Head

C - Nipple up/down Diverter

D - Nipple up/down BOP

E - Nipple up/down Bell Nipple

F -Run and Set Wear Bushing


A - Function Test

B - Pressure Test
A - Rig-up/Down Coil Tubing

B - Run Coil Tubing

C - N2 liftting

D - Acidizing

A - Perform FIT

B -Perform LOT

C - Liner Lap Test (dry test)


D- Casing Pressur Test

A - Perforating On Drill Pipe

B - Perforating On Wireline

A - Flow Check

B- BOP Drill

C - Shut in Well

D- Well Pressure Build up

E- Weighit Up Kill mud

F - Well Kill

G - Bullheading

H - Divertring

A - Compleation String Running

B - Compleation Test

C - Displace Compleation Fluid

A - Stuck
B - Jar up
C - Jar down

D - Trip For Finding Wash out

E - lay-down washed Joint

A - WAIT ON WEATHER
Rig up is the on-site erection and connection of rig components in p
components have arrived at the wellsite, and ends when the rig is rea
well and preparing it for moving to the next location. Tear Down be
when the last rig component has left the wellsite. This section also in
released from previous well, End: Rig fully rigged up, acceptance te

Drilling is boring a hole into the earth with the purpose of finding an
drilling out shoe tracks and dressing off cement plugs. Time starts o

Reaming refers to the operations of smoothing the wellbore, enlargin


drilling. Reaming begins when the rig begins rotating and circu
when this rotation and circulation cease.

Coring is the extraction from the wellbore of a cylindrical sample fo


cylindrical sample of rock. Coring ends when the process of capturin

Conditioning is the process of preparing the drilling fluid (“mud”) to


means pumping the fluid through the drill pipe. Process begins when
and pumps shut down.
Conditioning is the process of preparing the drilling fluid (“mud”) to
means pumping the fluid through the drill pipe. Process begins when
and pumps shut down.

Tripping is the process of lowering or recovering the BHA to or from


BHA from desired depth, and ends when the BHA has reaches the d
partially recover and lower the BHA to a desired depth to ensure the
mud-weight sufficiency.

Rig Service and maintenance is the process of prolonging equipmen


can be further sub-classified into time-based, condition-based and us
when the equipment is back in service.

Rig repair is a reactive process to correct unknown or unanticipated


begins when the equipment fails, and ends when the equipment is ba

Replacing drill line begins when the drawworks is removed from ser
activity involves spooling in a new supply line and moving worn lin

The deviation survey is the process of measuring borehole trajectory

Wireline logging is the process of taking formation measurements o


when the logging tools are assembled and run into the hole, and end
The operation includes all procedures necessary to run casing into th
Operation begins when casing equipment is rigged up, and ceases w

Waiting on Cement (WOC) is the time during which drilling or com


Begins when cement pumps are shut down, and ends following tests

This operation refers to dry BOP stacks, i.e., BOPs that are not subse
begins assembling the unit. Rig up ceases when the complete BOP s

BOP testing begins when the process of checking the device for func

The drill stem test begins with picking up temporary packers used to

Plugging back begins when the plug or cement head is run into the h
Plugging back begins when the plug or cement head is run into the h

Squeeze cementing begins when the process of rigging up squeeze c

Fishing begins when the fishing assembly is rigged up or picked up,


decision has been taken to commence a fishing operation, or when it
the hole. Ends: When resuming operations as carried out prior to the
commencing drilling operations would typically still be part of this o

Specialized directional work begins when the drill bit and assembly
assembly and drill bit have been rigged down. Otherwise, this catego

Coiled-tubing operations begins when the equipment is run into the


Operations applying technology focused on maintaining pressure on
fluids into the wellbore. Starts: With the first indication of a well co
when the well is being closed in if no flow check has taken place. En
of the well control phase at the same depth.

You might also like