You are on page 1of 4

SURFACE hgjgdgfxj,bnbcxvdqsfeqsRT

Date 2/2/2024 Report N° 10


Start Section depth (m) DEPTH M.D. (m) Actual TD Drilled 24h (m) Cumul progres.(m) Drilling hr/24 (hr) Cumul Drilling hrs ROP m/hr
EMK-26 2960.00 0.00 #DIV/0!
Rig name Field area RT-GL RT Elevation Phase CSG shoe (m) Last Survey
TASSILI 128 TMD (m)
Bit N° Run N° Size Type Manifacturer S/N Jets TFA (in²) Incl (°)
Azim (°) /
Mud type MW (ppg) FV (s/qt) YP (g/100 cm2) PV (cP) TVD (m)
Brine CACL 11.40 Daily DrilJAR (Rot hr) Cumul. 0.00
Drilling param. WOB (t) TD RPM (rpm) Tot RPM.(rpm) Flow in (l/m) SPP (psi) Torque (lb/ft) Daily On Bottom Rev(k r Cumul. 0.0
min Daily Tot Rev ( Krev) Cumul. 0.0
max Daily Circ Time ( hr) Cumul. 0.00
F/00:00 T/24:00 OPERATIONS SUMMARY

CONTINUED RIH PACKER MILLING BHA#2 ON 3-1/2" DP STANDS FROM 1841 m TO 2676 m, RIH SLOWLY AND TAGGED TOP PACKER AT 2685.34 m WITH
0:00 2:30
2 MT. FLOW CHECKED WELL, WELL STATIC.

L/D SINGLE JOINT 3-1/2" DP, PICKED UP KELLY. MADE TO STRING. RIH SLOWLY AND TAGGED TOP PACKER AT 2685.34 m, PULLED 0.5 m, DISPLACED
2:30 5:30 WELL TO 11.4 PPG WITH 5 BPM, 2000 PSI, OBSERVED GAS OUT AT SURFACE 70%, PULLED OUT STRING, CLOSED VBR RAMS, CONTINUED DISPLACE
WELL THROUGH POOR BOY DEGAZER WITH 3 BPM, 700 PSI, MAX GAS OUT AT SURFACE 35%. DISPLACED TOTAL OF 280 BBL 11.4 PPG.

5:30 9:30 CONTINUED CIRCULATE AND CONDITION BRINE : DENSITY IN / OUT : 11.4 PPG. FLOW CHECKED WELL, WELL STATIC.

9:30 10:00 WASHED DOWN WITH 3 BPM - 570 PSI TO TOP OF 7" MHR PACKER. SET TORQUE LIMIT 3500 FT-LBS. ESTABLISHED MILLING PARAMETERS.

COMMENCED MILLING 7" MHR PACKER WITH WOM 2.0 - 4 MT, 60 - 100 RPM, 1200 - 1600 FT-LBS TORQUE, PUMPING RATE 1 - 3 BPM, PRESSURE 200 -
10:00 15:30 600 PSI AND MILLED MHR PACKER FROM 2685.34 m TO 2685.72 m [TOTAL MILLED 0.38 m], OBSERVED PACKER DROPPED, MAXIMUM GAS OUT AT
SURFACE 9%,

STOP MILLING OPERATION, CIRCULATED OUT BOTTOM UP WITH 5 BPM, 1640 PSI, OBSERVED RUBBER ON SHALE SHAKERS. NO DYNAMIC LOSSES,
15:30 17:00
MAX GAS OUT AT SURFACE 25%.

17:00 18:30 CONTINUED RIH PACKER MILL BHA#2 & CHASED PACKER TO BOTTOM, TAGGED TOP OF PACKER AT 2897 m [71 m BELLOW LOWER PERFS].

18:30 20:30 CIRCULATED HOLE CLEAN WITH 5 BPM, 1650 PSI, MAX GAS OUT AT SURFACE 40%,FLOW CHECKED WELL, WELL STATIC.

20:30 0:00 RACKED BACK KELLY, POOH PACKER MILLING BHA#2 RACKING BACK 3-1/2" DP STANDS ON MAST FROM 2888 m TO 1650 m

GAS SHOWS

DEPTH(m) Type TG [%] C1 [ppm] C2 [ppm] C3 [ppm] iC4 [ppm] nC4 [ppm] iC5 [ppm] nC5 [ppm]

AFTER MIDNIGHT OPERATIONS SUMMARY

INTERVAL (m) Formations LITHOLOGY

Calibration Date Instruments out of order Date Mud Logging Operator : GEOLOG INTERNATIONAL
Gas detector FID 24/01/2024 DE DAY ELHOCINE MADANI
Gas Chrom. MonoFid 1/24/2024 DE NIGHT MAHFOUD LADHEM
H2S Sensor 24/01/2024 SAMPLE CATCHSADDAR YASSINE
SAMPLE CATCHSADDAR NACER
Bit time Cir time Rev on botTot rev d-jar Daily DrilJAR (Rot hr)
0 Daily On Bottom Rev(k rev)
Daily Tot Rev ( Krev)
Daily Circ Time ( hr)

Bit time Cir time Rev on bot


22.4 54.43 181.12
47.94 51.92
181.158 181.12
211.31 211.31
50.28 54.43

Tot rev d-jar


211.31 51.92