Daily Drilling Report

DANAN OILFIELD DEVELOPMENT


General Data
Country/ Province Iran / Ilam Well Type Deevelopment W.S.S. Day/ Night S.Hassanvand / M.T.Ashtiani Report No. 247
Field/ Well No. DANAN-DA-13 Spud Date/ Time 09/15/2020(99/06/25)/02:00 Operations / Area Manager M.Amini / I.Birgani Report Date 05/19/2021 (00/02/29)
Rig Name NOOR 1 Est. Rig Days 139 Geologist S.Hosseini / S.Kiamarzi Actual Rig Days 246 Days + 22 Hrs.
EPD Contractor MAPNA Hole Section 6" ICOFC Rep Jalilavi /
Act Rig Days less NPT 112 Days + 5.5 Hrs.
Client ICOFC Section Start Date (1400.01.06) / 13:30 Senior/ Night Toolpusher A.Saeedi / Y.Raziani

Well Data Bit Data Mud Data


N (m) 1,182,043.48 Bit No. Mud Type S.S. Polymer
Location (UTM):
E (m) 1,736,309.47 Bit Size TCI/ MT/ PDC MW Min / Max (pcf) 80
Project TD (m): 3536.5 Bit Manufacture Flow Line Temp. (deg F) P.Ch
R.T.E (m) G.L.E (m) 294.7 284.2 Bit Type Funnel Vis (sec/qrt) 38
Morning Depth (m) 3514 Bit Serial No. Fann 600 35
Mid Night Depth (m) 3514 IADC Code Fann 300 23
Previous Depth (m) 3514 Nozzle Number * Size ( /32 in) Fann 200/ 100 15 / 10
Drilled Interval (m) 0.0 W.O.B (klb) Fann 6/ 3 3/2
Drilling Time (hr) RPM / Total bit RPM PV (cp) 12
Average ROP (m/hr) #DIV/0! Torque (klb.ft) YP (lb/100ft^2) 11
Cum. DRLG Time (hr) 1438.5 Pump Type KLF1600 GEL 10 s/ 10 min/ 30 min 2/3/
Estimated / Actual Rig Days 139 246 Days + 22 Hrs. Pump Liner Size (in) 6+6+6 API Fluid Loss (cc/30 min) 4.0
KOP (m) 2595 Flow Rate (gpm) Mud Cake Thickness (1/32") 1
Last Formation MD TVD (m) Sarvak 3414 Standpipe Pressure (psi) Oil %
Lithology Lst TFA (in2) Water % 84
Last casing/ liner shoe 5" @ 3417.5 m Jet Velocity (ft/s) Solid/ Sand Content (%) 16 /
Last liner lap (m) 5"@2554 Bit Daily Drilled (m) Salinity(ppm)/Chlorides (mg/l) / 160000
Last FIT TVD (m) EMW (pcf) 2460 85 Bit On BTM Hours PH / MBT 10.7 /
Costs Today Well's Total Cum Drill Out CMT/ Ream (m) Total Hardness/Calcium (mg/l) 1600 / 1520
Day rate Cum Drill Out CMT/ Ream (hr) KCl (%WT)/ Glycol (%Vol) -
Mud & Cement Bit Cum. Drilled (m) Vol. in Hole (bbl) 627
Bit Bit Cum. Hours Vol. in Pits (bbl) 725
Cas/Tub W/H Bit In / Bit Out(m) Mud Sys./ Daily Made (bbl) 784 /
Service Bit Dull Condition Form. Loss/ Mud Pump Repair 0/0
Total Weight Below Jar in mud (klb) Evap./ Shaker / Pit Cleaning 5/0/0
Mud Materials & Chemicals BHA #91 Dump/ Trip/ Centrifuge/ Other 0 / 25 / 0 / 0
Material Type Unit Rec/ Sent Used STK Item Description Length (m) OD (in) ID (in) Cum. L. (m) Total Loss 30
BARITE 1.5 MT 0 Mule Shoe 2.00 5 2.00 POB
BENTONITE 1 MT 0 7" RTTS packer (BTM To center) 0.87 5 2.87 MDCO 4
SODA ASH 50 Kg / 25 kg 18 / 38 7" RTTS packer (center to top) 0.62 5 3.49 ICOFC 6
SALT (NaCl) 1 MT 43 RTTS safety joint 1.17 5 4.66 Services Catering 20 13
CaCO3 (Weight agent) 1 MT 27 Big john jar 1.59 5 6.25 Rig crew Guests 41
CAUSTIC SODA 25 kg 51 Hydraulic by pass (full close) 2.15 5 8.40 Casual labors 10
CITRIC ACID 25 kg 0 Gauge carrier 2.13 5 10.53 Drivers 8
Xanthan Gum 25 kg 7 LPR-N tester valve 4.83 5 15.36 Security 5
Starch,Potato 25 kg 261 Sleeve type drain valve 1.04 5 16.40 Total 107
KCL 1 MT 0 RD safety circulating valve 7 Kpsi 1.73 5 18.12 HSE
Wallnut Shell F 25 kg 69 RD circulating valve 7.5 Kpsi 1.10 5 19.22 HSE Cases Daily Cum
CaCO3 (F/M/C) 25 kg / 25 kg 40 / 80 / 0 XOS 0.03 5 19.24 LTI free days 1 12
MICA M/ C 25 kg 80 / 0 10 STD 3 1/2" DPs 289.72 3 1/2 308.96 Man-hours 1248 285984
MICA M 1MT 1 BHA # 90 LTI Accidents 0 0
MICA F 25 kg 70 Description length(m) OD (in) ID (in) Cum. L. (m) Non LTI Accidents 4 899
Shell Fish F/C 25 kg 0/0 BOP Drill 00/02/20 7
Shell Fish C 1 MT 2 H2S Drill 00/01/15 1
Shell Fish M 25 kg 172 Fire Drill 0 1
Shell Fish M 1 MT 0 Medevac Drill 0 1
PAC-LV/R 25 kg 0/0 Stop Card 3 1049
Fiber Lock 25 kg 45 PJSM 2 643
SODIUM BICARB 50 kg 8 Toolbox Meeting 2 642
PIPELAX DR 4
Defoamer 55 gal 4
PHPA 25 kg 15 BOP Test
Cement & Cement Additive LAST BOP TEST Date 1400.02.27
Mat. Type Unit Rec/ Sent Used STK Days Since Last BOP Test 2
CMT "G" Kerman sxs 160 Pumps Data
CMT "G" delijan sxs 1400 Pump # 1 Pump # 2 Pump # 3
NaCl-Salt (1ton) bb Make BOMCO BOMCO BOMCO

Antifaom Agent AA-01 can DP, HWDP & DC Data Type KLF1600 KLF1600 KLF1600

Dispersant FR-02 sxs Size (in) Grade Nominal Weight (ppf) Power (hp) 1600 1600 1600

GMC-01 dr DP 5" / 5" 3 1/2" - 2 7/8" G/S G - G/S 19.5/19.5 13.3 - 10.4 Liner Size (in) 6 6 6

FLC 03/02 dr/sxs HWDP 3 1/2" 25.3 23.2 Stroke (in) 12 12 12

chemical wash, CW-01 can DC 4 3/4" 3 1/8" 47 19 Max Press (psi) 3200 3200 3200

Mutual solvent SLV-01 sxs Down Hole Equipment


Magneset thinner sxs Equipment (Quantity, OD and Description) ID (in) Serial Number Cum Drlg (hr) Cum W&R/ D/O (hr)
1771150011-1771150007-17110002-1771150008-1771150023-1771100019-06-?-?-?-?-
Cement Equipment 3 1/8" DCs 1 1/2" 1771150015-?-1771100021-?-?-1711100030-1771150003-1771100004-1771150006-?-
1771100024-1771150017-?
25 / 10
Equipment Unit Rec Send STK 4 3/4" D.Jar 2" 5060040 0.0 54 / 12
Cement Unit no 1
Solution Tank no
CMT Silo no 5 Solid Control Equipment
Hook Load Data
Air Compressor no 1 Equipment Working Time (hr) Remarks
Surfactant drum Shakers 1 / 2 / 3 Mesh Size: 4*140/2*170+2*140/2*170+2*140 H.L (Klb) Pump On Pump Off
Fuel & Water Desilter / Desander / Degasser Pick Up
Fluid Type Unit Rec. Used STK Mud Cleaner Mesh Size: 4*320 Slack-Off
DIESEL Liter 3,300 68000 Centrifuge #1 / #2 Rotation
Drill Water bbl 1700 Super Clone TDS & Block Weight 58
KOP : Survey Casing Data
No. MD (m) INC (deg) AZ (deg) TVD (m) NS EW DLS Remark Shoe Depth Liner Lap
Casing Size (in) Grade Weight (ppf) Thread Length (m)
1 2675.0 8.7 253.0 2672.25 -32.13 -87.73 0.320 m) (m)
2 2684.9 8.0 253.0 2682.04 -32.55 -89.11 2.120 20 K-55 106.5 WSP-BIG 57.5 57.5
3 2694.5 6.4 250.0 2691.57 -32.93 -90.25 5.140 13 3/8 N-80 68.0 BTC 1415.5 1415.5
4 2704.1 4.2 249.0 2701.13 -33.24 -91.08 6.881 9 5/8 HC95SS & T-95 53.50 WSP-3T 2455.5 2455.5
5 2713.5 2.1 249.0 2701.51 -33.42 -91.56 6.702 7 L-80 29 PJE 1045.0 2595.0 2375
6 2723.1 1.3 250.0 2720.11 -33.52 -91.83 2.502 5 L-80 18 WSP-4T 864 3418 2554
7 2731.5 1.1 249.0 2728.51 -33.58 -91.99 0.718
8 B.P 2744.5 0.8 245.0 2741.50 -33.67 -92.19 0.709
Daily Drilling Report

DANAN OILFIELD DEVELOPMENT

Formation Data Well Control (SCR)

Forecasted Top MW (pcf)/ FV


Formation Name Actual Top (m) Lithology Pump # SPM# 1 SPP 1 (psi) SPM# 2 SPP 2 (psi) Depth (m) Time
(m) (s/qrt)

Aghajari Surface Rd. Ml + Gy.Ml + S.st 1

Gachsaran 7- 5 1600 1385.0 Anhy + Rd. Ml + Gy.Ml+ Salt 2

Gachsaran 4 - 2 1990.5 1874.0 Anhy + Rd. Ml + Gy.Ml+ Salt 3

Gachsaran 1 (Cap Rock) 2482.5 2426.5 Anhy + Salt + Shale Wellhead BOP Test Record
Asmari 2556.5 2491.0 Lst + Anhy Component Top FLG (Size/ WP) BTM FLG (Size/ WP) Component Type and Size Test Pressure

Kalhur 2626.8 2566.0 Lst+ Anhy+ Shale+ Cyst+Salt Xmas Tree Annular 13 5/8"-5K 2500

Pabdeh 2860.6 2837.0 Lst+Marl THS 11" 5K 13 5/8" 3K Top Rams 13 5/8"-10K 4500

Gurpi 3311 3295.0 Lst DSA Pack off - - - - Blind Rams 13 5/8"-10K 4500

Ilam 3356.5 3334.0 Lst+Cyst CHS 13 5/8" 3K 21 1/4" 2K Bottom Rams 13 5/8"-10K 4500

Sarvak 3440.5 3414.0 Lst CHH 21 1/4" 2K - - Choke Manif. 5k 4500

Well TD 3536.5 3514 L.St Wear Bushing Size: 11" IN/ OUT: OUT Accumulator 3k Function test

F/Noo-2 rig: 5 3/16" dressing mill (NMCO).


Received

Sent

Request

Corrosion inhibitor+ 8 Jt 7" casing (L-80, N.Vam, 29#)+ 7" Gol. flange+ XOS 4 1/2" N.Vam pin*3 1/2" IF box
Outstanding
4 1/8" Mill

Detail of Operations within Last 24 hours


Code /Activity Hrs From To Hrs Code Remarks
1. Rigging and Moving 00:00 02:00 2.0 22N Continue monitor tools in close position for 3 hrs.
2. Drilling 02:00 Apply 2450 psi pressure in annulus and open RDSCV, Reverse circulate and dump cushion water without observe any influx.
3. Hole Conditioning 05:30 3.5 22N Unset DST packer, R/D DST surface lines, Change TSD links while circulate though the string with NL-NG.
4. Coring 05:30 06:00 0.5 22N Observe the well, Static.
5. Mud Condition & Circ. 06:00 07:00 1.0 22N Due to mud U-tub from string, circulate 1.2 volume of string with NL-NG.
6. Trips 07:00 18:00 11.0 22N POOH 7" DST tools from 2509 m to surface with NL-NG.
7. Rig Services 18:00 00:00 6.0 22C Wait on receive memory cable of DST tools while circulate from CWH with NL-NG.
8. Slip and Cut DRLG Line

9. Deviation Survey

10. Logging

11. Running Casing/ Liner

12. Cementing

13. Nipple up/ down

14. BOP Test Note: 6 hrs waiting for Mapna DST service due to not having backup memory cable and consequent delay in operation.
15. Formation Testing Note: Mud logging system server has problem.
16. Directional Drilling Note : 4" valve of rig pump(#3) is out of service.
17. Well Completion Note: Operation crew shortage (day shift derrick man).
18. Perforation

19. Stimulation

20. Production & Well Testing

21. Suspension/Abandonment

22. NPT 24.0


23. Other

Time 8:00 13:00 19:00


Pool Level (m) 0.6 0.7 0.6
Rig Shortage: ###
1- Some caravans facilities are not completed.
24.0 24.0
From To Hrs Code Morning Report
00:00 Due to DST memory failure, RIH with 8 3/8" B.bit & 7 STD 5" DP from surface to 200 m and slow circulate through the string while wait on DST
03:30 3.5 22C tools for perform surface test to repeat the dry test.
03:30 06:00 2.5 22C RIH with 7" DST tools (full bore) and BHA# 91 to 110 m while fill up string each 5 stand with fresh water (63 pcf) as cushion water with NL-NG.

Total (Hrs) 6.0


Operations Summary
Continue monitor tools in close position for 3 hrs. Open RDSCV, Reverse circulate and dump cushion water without observe any influx. Observe the well, Static. POOH 7" DST tools from 2509
m to surface with NL-NG. Wait on receive memory cable of DST tools.

Next Operations
Due to DST memory failure, RIH with 7" DST tools and perform dry test again.
Operations Reference Code
MAPNA Drilling Co.
Code/
Main Activity Details
Subcode
1 Rigging & Moving
2 Drilling
3 Hole Conditioning
4 Coring
5 Mud Conditiong & Circulation
6 Trips
7 Rig Services
8 Slip & Cut Drilling Line
9 Deviation Survey
10 Wireline Logging
11 Running Casing/ Liner
12 Cementing
13 Nipple up/ down
14 BOP Test
15 Formation Testing
16 Directional Drilling
17 Well Completion
18 Perforation
19 Stimulation
20 Production & Well Testing
21 Suspension/ Abandonment
22 NPT
22A Waiting on Client
22B Waiting on EPD Contractor
22C Waiting on Service Company
22D Waiting on Rig Contractor
22E Stuck
22F Fishing and milling All preparing, assembling of fishing equipment to recover of junks or fish from a wellbore
22G Side-Tracking All operations related to Sidetracking Original Hole to Bypass a Fish (using cement plug or whipstock)
22H Well Control Issue
22I Washout Including trip out and trip in until reaching previous depth
22J String Plug Including trip out and trip in until reaching previous depth
22K Rig Repair
22L Wait On Weather
22M Force Majeure Other Force Majeures out of Client and Operator's Control
22N Other Down Hole Problem NPTs which is not within the above mentioned Categories