Antifaom Agent AA-01 can DP, HWDP & DC Data Type KLF1600 KLF1600 KLF1600
Dispersant FR-02 sxs Size (in) Grade Nominal Weight (ppf) Power (hp) 1600 1600 1600
GMC-01 dr DP 5" / 5" 3 1/2" - 2 7/8" G/S G - G/S 19.5/19.5 13.3 - 10.4 Liner Size (in) 6 6 6
chemical wash, CW-01 can DC 4 3/4" 3 1/8" 47 19 Max Press (psi) 3200 3200 3200
Gachsaran 1 (Cap Rock) 2482.5 2426.5 Anhy + Salt + Shale Wellhead BOP Test Record
Asmari 2556.5 2491.0 Lst + Anhy Component Top FLG (Size/ WP) BTM FLG (Size/ WP) Component Type and Size Test Pressure
Kalhur 2626.8 2566.0 Lst+ Anhy+ Shale+ Cyst+Salt Xmas Tree Annular 13 5/8"-5K 2500
Pabdeh 2860.6 2837.0 Lst+Marl THS 11" 5K 13 5/8" 3K Top Rams 13 5/8"-10K 4500
Gurpi 3311 3295.0 Lst DSA Pack off - - - - Blind Rams 13 5/8"-10K 4500
Ilam 3356.5 3334.0 Lst+Cyst CHS 13 5/8" 3K 21 1/4" 2K Bottom Rams 13 5/8"-10K 4500
Well TD 3536.5 3514 L.St Wear Bushing Size: 11" IN/ OUT: OUT Accumulator 3k Function test
Sent
Request
Corrosion inhibitor+ 8 Jt 7" casing (L-80, N.Vam, 29#)+ 7" Gol. flange+ XOS 4 1/2" N.Vam pin*3 1/2" IF box
Outstanding
4 1/8" Mill
9. Deviation Survey
10. Logging
12. Cementing
14. BOP Test Note: 6 hrs waiting for Mapna DST service due to not having backup memory cable and consequent delay in operation.
15. Formation Testing Note: Mud logging system server has problem.
16. Directional Drilling Note : 4" valve of rig pump(#3) is out of service.
17. Well Completion Note: Operation crew shortage (day shift derrick man).
18. Perforation
19. Stimulation
21. Suspension/Abandonment
Next Operations
Due to DST memory failure, RIH with 7" DST tools and perform dry test again.
Operations Reference Code
MAPNA Drilling Co.
Code/
Main Activity Details
Subcode
1 Rigging & Moving
2 Drilling
3 Hole Conditioning
4 Coring
5 Mud Conditiong & Circulation
6 Trips
7 Rig Services
8 Slip & Cut Drilling Line
9 Deviation Survey
10 Wireline Logging
11 Running Casing/ Liner
12 Cementing
13 Nipple up/ down
14 BOP Test
15 Formation Testing
16 Directional Drilling
17 Well Completion
18 Perforation
19 Stimulation
20 Production & Well Testing
21 Suspension/ Abandonment
22 NPT
22A Waiting on Client
22B Waiting on EPD Contractor
22C Waiting on Service Company
22D Waiting on Rig Contractor
22E Stuck
22F Fishing and milling All preparing, assembling of fishing equipment to recover of junks or fish from a wellbore
22G Side-Tracking All operations related to Sidetracking Original Hole to Bypass a Fish (using cement plug or whipstock)
22H Well Control Issue
22I Washout Including trip out and trip in until reaching previous depth
22J String Plug Including trip out and trip in until reaching previous depth
22K Rig Repair
22L Wait On Weather
22M Force Majeure Other Force Majeures out of Client and Operator's Control
22N Other Down Hole Problem NPTs which is not within the above mentioned Categories
23 Others