PURCHASE REQUISITION

Date : 15.09.2020 PROJECT PR#

PROJECT NAME MIA-CGC COST CENTER: PROJECT LOCATION : ABU ALI

REQUEST TYPE Material Assets/Tools Consumables Service REQUISITION ACTIONEMERGENCY / URGENT / ROUTINE

DETAILS OF ITEM
TOTAL REQUIRED
S.NO DESCRIPTION OF ITEM UNIT Remarks
MAKE SPEC. QTY . DATE

For Telecom D-4 Duct Bank


1 4-inch Core Drilling EA 4
(Inside Manhole)

For Instrumentation (PMC


2 8-inch Core Drilling EA 3
Building)

2 Mobilization and Demobilization EA 2

Material Requested Within the Budget Yes No,


If No Specify Reason

Requested By : Sadham Hussain Signature : Date : 15 / 09 /2020

Checked By : Signature : Date : / /2020

Approved By : Signature : Date : / /2020