Daily Drilling Report

DANAN OILFIELD DEVELOPMENT


General Data
Country/ Province Iran / Ilam Well Type Deevelopment W.S.S. Day/ Night S.Hassanvand / H.Jalilzadeh Report No. 143
Field/ Well No. DANAN-DA-13 Spud Date/ Time 09/15/2020(99/06/25)/02:00 Operations / Area Manager M.Amini / M.Aliabadi Report Date 02/04/2021 (99/11/15)
Rig Name NOOR 1 Est. Rig Days 139 Geologist M.Ghasemi / A.Rostamnezhad Actual Rig Days 142 Days + 22 Hrs.
EPD Contractor MAPNA Hole Section 5 7/8" ICOFC Rep K.Ghodsi
Act Rig Days less NPT 108 Days + 19.5 Hrs.
Client ICOFC Section Start Date (99/11/12) / 21:00 Senior/ Night Toolpusher A.Mortazavian / P.Parsi

Well Data Bit Data Mud Data


N (m) 1,182,043.48 Bit No. 15 Mud Type S.S. Polymer
Location (UTM):
E (m) 1,736,309.47 Bit Size TCI/ MT/ PDC 5 7/8" TCI MW Min / Max (pcf) 78
Project TD (m): 3536.5 Bit Manufacture K.D Flow Line Temp. (deg F) 140
R.T.E (m) G.L.E (m) 294.7 284.2 Bit Type HJT517G Funnel Vis (sec/qrt) 40
Morning Depth (m) 3512 Bit Serial No. 05511 Fann 600 44
Mid Night Depth (m) 3512 IADC Code 517 Fann 300 31
Previous Depth (m) 3487 Nozzle Number * Size ( /32 in) 3*16/32" Fann 200/ 100 29 / 20
Drilled Interval (m) 25.0 W.O.B (klb) 15-20 Fann 6/ 3 4/3
Drilling Time (hr) 12.0 RPM / Total bit RPM 100-110 / 281889 PV (cp) 13
Average ROP (m/hr) 2.08 Torque (klb.ft) 3-5 YP (lb/100ft^2) 18
Cum. DRLG Time (hr) 1006.0 Pump Type KLF1600 GEL 10 s/ 10 min/ 30 min 3/5
Estimated / Actual Rig Days 139 142 Days + 22 Hrs. Pump Liner Size (in) 6+6+6 API Fluid Loss (cc/30 min) 2.0
KOP (m) - Flow Rate (gpm) 250 Mud Cake Thickness (1/32") 1
Last Formation MD TVD (m) Sarvak 3411 Standpipe Pressure (psi) 1600-1650 Oil % 1
Lithology Lst TFA (in2) 0.589 Water % 85
Last casing/ liner shoe 7" @ 3420.5 m Jet Velocity (ft/s) - Solid/ Sand Content (%) 14 /
Last liner lap (m) 7"@2375 Bit Daily Drilled (m) 25 Salinity(ppm)/Chlorides (mg/l) / 100000
Last FIT TVD (m) EMW (pcf) 2460 85 Bit On BTM Hours 11.5 PH / MBT 9.6 /
Costs Today Well's Total Cum Drill Out CMT/ Ream (m) / 56 Total Hardness/Calcium (mg/l) 1080 / 1000
Day rate Cum Drill Out CMT/ Ream (hr) /3 KCl (%WT)/ Glycol (%Vol) -
Mud & Cement Bit Cum. Drilled (m) 88.5 + 74 Vol. in Hole (bbl) 636
Bit Bit Cum. Hours 49 + 40 Vol. in Pits (bbl) 1044
Cas/Tub W/H Bit In / Bit Out(m) 3423.5 / 3512 Mud Sys./ Daily Made (bbl) 679 / 0.1
Service Bit Dull Condition Form. Loss/ Mud Pump Repair 0/0
Total Weight Below Jar in mud (klb) 29 Evap./ Shaker / Pit Cleaning 0 / 17 / 0
Mud Materials & Chemicals BHA# 44 Dump/ Trip/ Centrifuge/ Other 0 / 21 / 0 / 4
Material Type Unit Rec/ Sent Used STK Item Description Length (m) OD (in) ID (in) Cum. L. (m) Total Loss 42
BARITE 1.5 MT 0 5 7/8" B.Bit 0.49 5 3/4" 1 1/2" 0.49 POB
BENTONITE 1 MT 0 4 9/16" B.Sub 0.91 4 9/16" 2 3/4" 1.40 MDCO 4
SODA ASH 50 Kg 11 8 STD 4 3/4" DC 224.07 4 3/4" 2 1/4" 225.47 ICOFC 4
SALT (NaCl) 1 MT 36 4 3/4" D.Jar 4.41 4 3/4" 2" 229.88 Services Catering 25 13
CaCO3 (Weight agent) 1 MT 43 1 STD 4 3/4" DC 27.83 4 3/4" 2 1/4" 257.71 Rig crew Guests 40 14
CAUSTIC SODA 25 kg 1 17 39 STD 3 1/2" DP 1128.98 3 1/2" 2 3/8" 1386.69 Casual labors 5
CITRIC ACID 25 kg 0 XOS 0.97 4 3/4" 2 1/4" 1387.66 Drivers 8
Xanthan Gum 25 kg 10 Security 7
Starch,Potato 25 kg 200 Total 120
KCL 1 MT 2 HSE
Wallnut Shell F 1 MT 0 HSE Cases Daily Cum
CaCO3 (F/M/C) 1 MT / 25 kg 2 / 80 / 0 LTI free days 1 143
MICA M/ C 25 kg 0/0 Man-hours 1440 195780
MICA M 1MT 1 BHA # 43 LTI Accidents 0 0
MICA F 25 kg 41 Description length(m) OD (in) ID (in) Cum. L. (m) Non LTI Accidents 6 504
Shell Fish F/C 25 kg 0/0 BOP Drill 0 5
Shell Fish C 1 MT 2 H2S Drill 0 0
Shell Fish M 25 kg 212 Fire Drill 0 0
Shell Fish M 1 MT 0 Medevac Drill 0 0
PAC-LV/R 25 kg 0/0 Stop Card 6 688
Fiber Lock 25 kg 13 PJSM 3 515
SODIUM BICARB 50 kg 22 Toolbox Meeting 2 513
PIPELAX DR 4
Defoamer 55 gal 4
PHPA 25 kg 15 BOP Test
Cement & Cement Additive LAST BOP TEST Date 99.11.05
Mat. Type Unit Rec/ Sent Used STK Days Since Last BOP Test 11
CMT "G" sxs 625 Pumps Data
CMT "G" W/Hi-dense sxs Pump # 1 Pump # 2 Pump # 3
NaCl-Salt (1ton) bb Make BOMCO BOMCO BOMCO

Antifaom Agent AA-01 can DP, HWDP & DC Data Type KLF1600 KLF1600 KLF1600

Dispersant FR-02 sxs Size (in) Grade Nominal Weight (ppf) Power (hp) 1600 1600 1600

GMC-01 dr DP 5/5 3.5 G/S G 19.5/19.5 13.3 Liner Size (in) 6 6 6

FLC 03/02 dr/sxs HWDP Stroke (in) 12 12 12

chemical wash, CW-01 can DC 4 3/4 47 Max Press (psi) 3200 3200 3200

Mutual solvent SLV-01 sxs Down Hole Equipment


Magneset thinner sxs Equipment (Quantity, OD and Description) ID (in) Serial Number Cum Drlg (hr) Cum W&R/ D/O (hr)
1771100051-13-31-50-21-14-32-18-04-43-52-48-60-55-47-34-05-49-28-03-02-33-46-53-
Cement Equipment 4 3/4" DC 2 1/4" 11-16-57 53.0 67 / 17
Equipment Unit Rec Send STK 4 3/4" D.Jar 2 5060038 53.0 64 / 3
Cement Unit no
Solution Tank no
CMT Silo no 5 Solid Control Equipment
Hook Load Data
Air Compressor no Equipment Working Time (hr) Remarks
Surfactant drum Shakers 1 / 2 / 3 18 Mesh Size: 4*140/1*180+1*140+ 2*170/4*180 H.L (Klb) Pump On Pump Off
Fuel & Water Desilter / Desander / Degasser Pick Up
Fluid Type Unit Rec. Used STK Mud Cleaner Mesh Size: 4*320 Slack-Off
DIESEL Liter 29,000 380 67600 Centrifuge #1 / #2 Rotation
Drill Water bbl 1700 Super Clone TDS & Block Weight 58
KOP : Survey Casing Data
No. MD (m) INC (deg) AZ (deg) TVD (m) NS EW DLS Remark Shoe Depth Liner Lap
Casing Size (in) Grade Weight (ppf) Thread Length (m)
1 56.0 0.0 Totco m) (m)
2 302.0 0.5 Totco 20 K-55 106.5 WSP-BIG 57.5 57.5
3 598.0 1.5 Totco 13 3/8 N-80 68.0 BTC 1415.5 1415.5
4 902.0 2.0 Totco 9 5/8 HC95SS & T-95 53.50 WSP-3T 2455.5 2455.5
5 1218.0 3.0 Totco 7 L-80 29 PJE 1045.0 3420.5 2375
6 1412.0 4.0 Totco 5
7
8
Daily Drilling Report

DANAN OILFIELD DEVELOPMENT

Formation Data Well Control (SCR)

Forecasted Top MW (pcf)/ FV


Formation Name Actual Top (m) Lithology Pump # SPM# 1 SPP 1 (psi) SPM# 2 SPP 2 (psi) Depth (m) Time
(m) (s/qrt)

Aghajari Surface Rd. Ml + Gy.Ml + S.st 1 78 / 39 21 200 29 400 3481 20:30

Gachsaran 7- 5 1600 1385.0 Anhy + Rd. Ml + Gy.Ml+ Salt 2 78 / 39 21 200 30 400 3481 20:30

Gachsaran 4 - 2 1990.5 1874.0 Anhy + Rd. Ml + Gy.Ml+ Salt 3

Gachsaran 1 (Cap Rock) 2482.5 2426.5 Anhy + Salt + Shale Wellhead BOP Test Record
Asmari 2556.5 2491.0 Lst + Anhy Component Top FLG (Size/ WP) BTM FLG (Size/ WP) Component Type and Size Test Pressure

Kalhur 2626.8 2566.0 Lst+ Anhy+ Shale+ Cyst+Salt Xmas Tree Annular 13 5/8"-5K 2500

Pabdeh 2860.6 2837.0 Lst + Gy.Ml THS 11" 5K 13 5/8" 3K Top Rams 13 5/8"-10K 4500

Gurpi 3311 3293.0 Lst DSA Pack off - - - - Blind Rams 13 5/8"-10K 4500

Ilam 3356.5 3332.0 Lst CHS 13 5/8" 3K 21 1/4" 2K Bottom Rams 13 5/8"-10K 4500

Sarvak 3440.5 3411.0 Lst + Cyst CHH 21 1/4" 2K - - Choke Manif. 5k 4500

Well TD 3536.5 Wear Bushing Size: 11" IN/ OUT: in Accumulator 3k Function test

F/Mapna CSG W.H : 25 Jts 5" LNR (18#, L-80, VFJ)


Received

To Rig OEOC 206S : 7" Fluted Swage (1 No.) To Rig Noor-2 : 5 7/8" B.Bit (517, S/N : 05515, Used, K.D)
Sent

Request

Outstanding

Detail of Operations within Last 24 hours


Code /Activity Hrs From To Hrs Code Remarks
1. Rigging and Moving 00:00 Cont. Drlg 5 7/8" Hole Section F/3487 m to 3512 m (Well TD) While W&R Last STD Before Conn. W/NL-NG.
2. Drilling 12.0 12:00 12.0 2A Drlg Parameters: WOB:15-20 klb, RPM:100-110, FR: 250 gpm, SPP:1600-1650 psi, Touq:3-5 klb.ft, ROP: 2 mph.
3. Hole Conditioning 2.0 12:00 13:30 1.5 5C Circ. Btm's Up & Clean The Hole W/NL-NG.
4. Coring 13:30 POOH as Cond. Trip F/3512 m to 3420.5 m (7" LNR Shoe) W/Good Hole Condition,RIH Back As Cond. Trip to 3512 m (Btm)
5. Mud Condition & Circ. 3.5 15:30 2.0 3D W/Good Hole Cond. & NL-NG.
6. Trips 6.5 15:30 17:30 2.0 5C Pump 20 bbl Hi-Vis Pill & Circ. Btm's Up & Clean The Hole, Spot 15 bbl Hi-Vis Pill W/NL-NG.
7. Rig Services 17:30 18:30 1.0 6B POOH F/3512 m to 3420.5 m (7" LNR Shoe) W/Good Hole Condition While Circ. Cross WHD W/NL-NG.
8. Slip and Cut DRLG Line 18:30 19:00 0.5 6L OBS The Well " Static"
9. Deviation Survey 19:00 24:00 5.0 6B Cont. POOH F/3420.5 m to 2300 m While Circ. Cross WHD W/NL-NG.
10. Logging

11. Running Casing/ Liner >>> Note: OBS. 5-20 klb Overpull F/2831 m to 2801 m During POOH.
12. Cementing >>> Note: 11.5 Hrs. Drlg time + 0.5 Hrs. W&R, Conn. Time & SCR.
13. Nipple up/ down

14. BOP Test >>>Note : Operation Crew Shortage (Night Shift Assistant Driller & 1 No. Roughneck & Camp Motorman).
15. Formation Testing

16. Directional Drilling

17. Well Completion

18. Perforation

19. Stimulation

20. Production & Well Testing

21. Suspension/Abandonment

22. NPT

23. Other Time 8:00 13:00 19:00


Pool Level (m) 0.3 0.4 0.5

Rig Shortage: ###


1- Some caravans facilities are not completed.

24.0
From To Hrs Code Morning Report
00:00 06:00 6.0 6B Cont. POOH F/2300 m to 280 m While Circ. Cross WHD W/NL-NG.

Total (Hrs) 6.0

Operations Summary
Cont. Drlg 5 7/8" Hole Section F/3487 m to 3512 m (Well TD) W/NL-NG, CBU, POOH as Cond. Trip F/3512 m to 3420.5 m (7" LNR Shoe) & RIH Back to 3512 m (Btm) W/G.H.C, Spot 15 bbl
Hi-Vis Pill W/NL-NG. POOH F/3512 m to 2300 m W/Good Hole Condition While Circ. Cross WHD W/NL-NG.

Next Operations

Cont. POOH To Surf. RIH W/5 3/4" Taper Mill


Operations Reference Code
MAPNA Drilling Co.
Code/
Main Activity Details
Subcode
1 Rigging & Moving
2 Drilling
3 Hole Conditioning
4 Coring
5 Mud Conditiong & Circulation
6 Trips
7 Rig Services
8 Slip & Cut Drilling Line
9 Deviation Survey
10 Wireline Logging
11 Running Casing/ Liner
12 Cementing
13 Nipple up/ down
14 BOP Test
15 Formation Testing
16 Directional Drilling
17 Well Completion
18 Perforation
19 Stimulation
20 Production & Well Testing
21 Suspension/ Abandonment
22 NPT
23 Others