Gachsaran 1 (Cap Rock) 2412 2426.0 Anhy + Mrl + Lime + Cly + Shale Wellhead BOP Test Record
Asmari 2474 2496.0 L.st.+Anhy+Dol L.st+Arg.L.st+ Cl.st. Component Top FLG (Size/ WP) BTM FLG (Size/ WP) Component Type and Size Test Pressure
Kalhur 2548 2573.0 Arg.L.st + Anhy + Cl.st. + Dol.L.st.+ L.st+ G.Mrl + Salt Xmas Tree Annular 5k - 13-5/8" 2500
Pabdeh 2813 2816.0 Arg. Lst THS 11" 5k 13-5/8" 3k Top Rams 10k- 2-7/8" * 5" VBR 4500
Gurpi 3283 3262.0 Lst DSA Pack off Blind Rams 10k - 13-5/8" 4500
Ilam 3329 3305.0 Lst CHS 13-5/8" 3k 21-1/4" 2k Bottom Rams 5"fix, 10k - 13-5/8" 4500
Sarvak 3410 3386.0 Lst CHH 21-1/4" 2k welded Choke Manif. 10k 4500
Well TD 3509 3484.00 Lst Wear Bushing Size: 11" IN/ OUT: OUT Accumulator 3K Function test
Received
Sent
Outstanding 1 Jt 7" Long flow coupling (29#, L-80 13CR, N.VAM) as spare part.
7. Rig Services
9. Deviation Survey
10. Logging
11. Running Casing/ Liner Note: Release Exxon Dena Co. crew @ 1400.02.24 on 17:00 O'clock.
12. Cementing
18. Perforation
19. Stimulation
21. Suspension/Abandonment
Note: Personnel Shortage On Board : 1 Derrickman + 1 Roughneck + 2 Crane Operator + 1 Mud logger (M.L.Crew).
TOTALLY 24.0 24.0
From To Hrs Code Morning Report
00:00 Cont. RIH 7" DST Tools (full bore- MDCo) F/880 to 1620m while F/U 1500m of string W/ 63pcf F.WTR as cushion fluid every 5 STDs
06:00 6.0 22N W/NL-NG. (Cushion fluid height: 1500 m).
Cont. RIH 7" Hydro-Mechanical Bridge Plug (Exxon Dena Co.) to 2588m, Set brigde plug at 2588m (14m above top of CMT plug) & check it, "ok". Release running tools, POOH to surface, L/D
running tools. RIH W/7" DST Tools (full bore- MDCo) to 880m while F/U string W/ 63pcf F.WTR as cushion fluid every 5 STDs W/NL-NG.
Next Operations
RIH W/7" DST tools (full bore) to 2570m, perform 7" LNR aginst 7" B.Plug dry test, POOH to surface.
Operations Reference Code
MAPNA Drilling Co.
Code/
Main Activity Details
Subcode
1 Rigging & Moving
2 Drilling
3 Hole Conditioning
4 Coring
5 Mud Conditiong & Circulation
5A Preparing Mud Making Mud
5B Displacing the Hole Displacing the well with new mud
5C Mud Circulation Circulation of mud to clean the hole, allow cuttings to reach to surface, etc.
5D Mud Condition Circulation of mud in order to treat the mud condition working on mud properties
5E Loss Control All Activities Associated With Circulate and Condition due to lost circulation
5F Pit Management Cleaning pits, Transferring mud between pits (if cannot be done while doing other operations)
6 Trips
6A Trip in the Hole Run in hole on Drill pipes with drilling or other BHA's
6B Trip out of the Hole Pull out of hole on Drill pipes with drilling or other BHA's
6C Short Trip (in) RIH with bit to condition the drilled hole section
6D Short Trip (Out) POOH with bit to condition the drilled hole section
6E Make up BHA Preparing, Picking up and Making up the BHA (except directinal drilling BHA)
6F Lay Down BHA Breaking out and Laying Down BHA (except directinal drilling BHA)
6G Pick up Drill Pipe Picking up and Making up Drill Pipes joint by joint, making stand and rack back them
6H Lay Down Drill Pipe Breaking out and Laying down Drill Pipe s joint by joint
6I Pump POOH POOH with Pumping (no reaming)
6J Wash Down RIH with Pumping (no reaming)
6K Wear Bushing Putting/ Retrieving Wear Bushing
6L Flow Check Observing the well for any flow while tripping (at BHA and shoe)
7 Rig Services
7A Rig Services Service or lubricate of TDS in limited time according to the contract
8 Slip & Cut Drilling Line
9 Deviation Survey
10 Wireline Logging
11 Running Casing/ Liner
12 Cementing
13 Nipple up/ down
14 BOP Test
15 Formation Testing
16 Directional Drilling
17 Well Completion
18 Perforation
19 Stimulation
20 Production & Well Testing
21 Suspension/ Abandonment
22 NPT
22A Waiting on Client
22B Waiting on EPD Contractor
22C Waiting on Service Company
22D Waiting on Rig Contractor
22E Stuck
22F Fishing and milling All preparing, assembling of fishing equipment to recover of junks or fish from a wellbore
22G Side-Tracking All operations related to Sidetracking Original Hole to Bypass a Fish (using cement plug or whipstock)
22H Well Control Issue
22I Washout Including trip out and trip in until reaching previous depth
22J String Plug Including trip out and trip in until reaching previous depth
22K Rig Repair
22L Wait On Weather
22M Force Majeure Other Force Majeures out of Client and Operator's Control
22N Other Down Hole Problem NPTs which is not within the above mentioned Categories
23 Others