Project Name:
Contract ID:
Contractor
Weather/Temp AM /
PM /
Item No Item Description Item Code Plan Page # Location Subcontractor Placed Qty As Built Qty
Environmental Remarks:
Work Hours
Pay Items
Regular Overtime
RE
Non- RE Supervision
Office
General
Earth
Drainage
Aggregates
Curb and Sidewalk
Paving
Structures
Utilities
Electrical
Guide Rail
Safety
Miscellaneous
Benefit Leave
Training
Loaned off Project
attach additional sketches, photos, calculation, delivery tickets
Form DC-144 (b) (12/22/2015)
Location (station to station) Lane Lift Thickness Mix No. Lot No. Pounds Received Pounds Placed SY Laid LBS/SY
Length Timber Pile Dia. Splice Data Penetration Blows Last 5 Feet Blows Last
Pile No. NOTES