CONCRETE POUR CARD

Pour Card No :
Name of Work: DATE :
Client : Check List Ref :
Contractor:
Consultant :

Ref. drawing no/s. RMC Supplier Name :


Pouring Location ( Structural) : Date of Pouring:

Transit Timing on Site/


Cement Quantity in Pump
Grade of SLUMP IN Temp. of Batch Time
Sr. No Challan No. RMC Plant Transit No. Content in Location & Structure Cubic Meter Cummulative Cube Detail Remarks
Concrete mm Concrete ºC at Plant
Kg (m3)
Start Time End Time

10

11

12

13

14

15

for Contractor for PMC for Client