INSPECTION REPORT – PAINT WORK

REVISION
LAYING OF CARBON STEEL PIPELINE IN U.P. HARYANA, RAJASTHAN, NCT OF DELHI AND NCR FOR NO.00
SEGMENT-
PROJECT NO. & NAME : 06 RAJASTHAN PART-B
CLIENT M/S INDRAPRASTHA GAS LIMITED REPORT NO.: 01
CONSULTANT M/S RESONANCE ENERGY PVT. LTD. DATE : 26.02.2023
TPIA M/S MOODY INTERNATIONAL PIPE DIA & THK: 4"X6.4MM & 2"X5.54MM
CONTRACTOR M/S KHURANA ENGINEERINGS PVT.LTD. LOCATION : SAI KRIPA RO

Section Detail : FROM MJ-01 TO MJ-48


Paint Name : Primer & Epoxy
Paint Batch No. : 0537000018 & 0448000021
General weather conditions : Dry Humid Rain

WEATHER CONDITIONS
TIME Td Th RH DP Tobj ∆T OK / NOT OK
12:00 PM 23.2°C 23.2°C 42.40% 9.72°C 22.1°C -1.1°C

2:30 PM 24.6°C 24.6°C 44.20% 11.61°C 23.7°C -0.9°C

5:00 PM 19.8°C 19.8°C 38.60% 5.295°C 20.2°C 0.4°C

Td : Temperature dry, Th : Temperature humid, RH : Relative humidity, DP : Dew point, Tobj : Temperature of object, ∆T : (Tobj -
DP)

PIPE DETAILS SURFACE AREA CALCULATION

Description of Pipe/Shut off Length Surface Area


Sr. No. (Mtr) Remark
valve/Filter/Support (Sq.mtr)
1 4" STEEL PIPE 8.220 2.581

2 2" STEEL PIPE 63.456 9.963

TOTAL (Sq.mtr) 12.544

REQUIRED DFT 305 Micron


MEASURED DFT 340 Micron

APPLICATION METHOD Mannual Brush


CHECKED & VERIFIED BY
FOR CONTRACTOR FOR TPIA FOR PMC/CLIENT

SIGN: SIGN: SIGN:

DATE: DATE: DATE:


NAME: NAME: NAME: