REVISION
LAYING OF CARBON STEEL PIPELINE IN U.P. HARYANA, RAJASTHAN, NCT OF DELHI AND NCR FOR NO.00
SEGMENT-
PROJECT NO. & NAME : 06 RAJASTHAN PART-B
CLIENT M/S INDRAPRASTHA GAS LIMITED REPORT NO.: 01
CONSULTANT M/S RESONANCE ENERGY PVT. LTD. DATE : 26.02.2023
TPIA M/S MOODY INTERNATIONAL PIPE DIA & THK: 4"X6.4MM & 2"X5.54MM
CONTRACTOR M/S KHURANA ENGINEERINGS PVT.LTD. LOCATION : SAI KRIPA RO
WEATHER CONDITIONS
TIME Td Th RH DP Tobj ∆T OK / NOT OK
12:00 PM 23.2°C 23.2°C 42.40% 9.72°C 22.1°C -1.1°C
Td : Temperature dry, Th : Temperature humid, RH : Relative humidity, DP : Dew point, Tobj : Temperature of object, ∆T : (Tobj -
DP)