Replacement of the Oil Metering Facilities with the Associated R-1383 ZOS
Contract No:
Works at Es-Sider Terminal R-1383
Report No.:
08
DAILY PAINTING INSPECTION REPORT SHEET:
1 of 2
JOB DESCRIPTION:
Grit Blasting and application of first coat
ITEM:
36” Pipes, Qty 1
DOCUMENT / DRAWING REFERENCES:
STARTING DATE: Tuesday July 12, 2022
FINISHING DATE: Tuesday July 12, 2022
3. COATING
WET
THK. TOTA
MANUFACTURER’S SHADE BATCH APPLICATIO DFT PREV. COAT(S DRY THK. L
DESCRIPTION NO. NO. N METHOD COAT(S) ) COAT(S) DFT
45705 19880 231121339 Airless spray 200-280 140-170
98750 222025298
8450 222016005
VISUAL INSPECTION:
OTHER TESTS / INSTRUMENT USED: DFT METER (for dry film thickness measurements), Wet Film Thickness Gauge,
DEWPOINT METER, Profilometre: Replica tape.
-Compressor Good
-Airless painting machine Graco.
-Blasting machine Air blast
CONCLUSION: